3-0 FIGURE 6. LIFT PLATFORM CLEAR SPACE REQUIREMENTS CLEAR SPACE, WIDTH 28-5'' from 0" to 2" --q1 30" from 2" to 30" 30in SECTION A-A I CLEAR SPACE, LENGTH From 2" to 30"above Platform A PLATFORM ' - OUTER BARRIER SlnF VIFW ---- 30 in / ' -\ INNER ROLL STOP \ TOP OF PLATFORM -=I== * = No length clear space requirement in this zone.
PLATFORM DEFLECTION ANGLE DEFLECTION ANGLE OF PLATFORM, 3 DEG MAXIMUM PLATFORM REFERENCE LINE, Note 1 I PLATFORM Note 1. Platform Reference Line is Measured from the Slde of the Vehlcle Before and After the Load Is Applled to the Platform. Platform Deflection EDGE GUARDS e Edge Guards BUS FLOOR BUSWALL UP 1.50 inches mi nimunI ~
- Page 47 and 48: IV-30 lack of follow-up training. N
- Page 49 and 50: IV-32 16. Backup Operation (S6.9) -
- Page 51 and 52: IV-34 This “looked but did not se
- Page 53 and 54: W-36 e Clearance test block (S7.1.3
- Page 55 and 56: IV-38 Structural Integrity, to iden
- Page 57 and 58: IV-40 NHTSA assumes that the large,
- Page 59 and 60: V. BENEFITS v-1 Serious injuries an
- Page 61 and 62: v-3 retention strength test, CG and
- Page 63 and 64: v-5 objective terms which should le
- Page 65 and 66: VI-2 subject to the ADA requirement
- Page 67 and 68: VI-4 averaged 35,000 units per year
- Page 69 and 70: VI-6 In order to make an estimate o
- Page 71 and 72: Cost Estimates VI-8 New Lift Hardwa
- Page 73 and 74: VI- 10 close a circuit and send a s
- Page 75 and 76: VI-12 FMVSS No. 141 Lift Certificat
- Page 77 and 78: VI- 14 Total Cost for Public-Use Li
- Page 79 and 80: VII. LEADTIME VII-1 Since the lift-
- Page 81 and 82: VIII-2 Table VIII-1 SUMMARY OF SBA
- Page 83 and 84: VIII-4 many private transit bus ope
- Page 85 and 86: VIII-6 Many hundreds of small busin
- Page 87 and 88: VIII-8 adaptive driving equipment f
- Page 89 and 90: VIII-10 Facts Book, 7.2 percent of
- Page 91 and 92: A- 1 REFERENCES 1. Americans with D
- Page 93 and 94: A-3 25. A Directory of UMTA-Funded
- Page 95 and 96: Figure 1 Dirgm Showing the Part8 of
- Page 97: 5 Figure 2. Isometric View of Platf
- Page 101 and 102: .. Lln UP, OUTER BARRIER UP LIFT MI
- Page 103 and 104: i I i I I I I i 1 i I ! j I I ~ __
PLATFORM DEFLECTION ANGLE<br />
DEFLECTION ANGLE OF PLATFORM, 3 DEG MAXIMUM<br />
PLATFORM REFERENCE LINE, Note 1<br />
I PLATFORM<br />
Note 1. Platform Reference Line is Measured<br />
from the Slde of the Vehlcle Before and After<br />
the Load Is Applled to the Platform.<br />
Platform Deflection<br />
EDGE GUARDS<br />
e<br />
Edge Guards<br />
BUS FLOOR<br />
BUSWALL<br />
UP<br />
1.50 inches mi nimunI<br />
~