The certification test equipment cost per lift for (Public-Use) manufacturer is estimated to be<br />
about $20K-$40K per manufacturer and the total industry cost for test equipment will be<br />
$120,000-$240,000 [(6 X $20K) to (6 X $40K)]. There will also be a one-time capital<br />
equipment cost [e.g., lift improvement hardware) for tooling of $5K-$l OK per lift manufactur :r<br />
(based on 2 lift designs) for the hardware items listed in Table VI-11 or $30,000-$60,000 [(6 3,<br />
$5K) to (6 X $10K)] for the industry. The lift manufacturers are considered low volume<br />
manufacturers making about 5-8 hand assembled lifts per day per manufacturer, on the averag.:.<br />
The tools for assembly to meet the new FMVSS are low-tech jigs and fixtures used for drilling<br />
holes. The total capital equipment cost for 6 lift manufacturers would be $150,000-$300,000<br />
[($120K-$240K)+ ($30K-$60K)] for test equipment and tool/dies. Table VI-4 shows an<br />
approximate $5 cost amortized on a 10 year production cycle that is passed on to consumer in<br />
higher lift costs.<br />
Table VI-4 Variable and Fixed Incremental Cost per Lift over 10 Year Production Cycle<br />
MPVs >4.540 KE (10.000 Ibs.) GVWR and Buses<br />
"\ I<br />
I I '1<br />
Cost Category 1 Amount (2001$) 1 # of Designs, # of Manufactui ersI<br />
Certification Labor<br />
Certification Equipment<br />
DesigdProduction Labor<br />
Tool and Dies<br />
Tot. Variable + Fixed Costs<br />
Cost per Unit Range<br />
Average Cost per Unit<br />
$55,897 (2 X 6 X $4,621) 2 Lift designs, 6 Manufacture 's.<br />
$128,952-$257,904 6 Manufacturex<br />
$128,952-$257,904 2 Lift designs, 6 Manufacture 's<br />
$32,238-$64,476 2 Lift designs, 6 Manufacture,-s<br />
$346,02 1-$636,163<br />
$3.32 - $7.67<br />
$5.50