04.09.2015 Views

Lean - Henry Ford Health System

Lean - Henry Ford Health System

Lean - Henry Ford Health System

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Minimizing Variation<br />

<strong>Henry</strong> <strong>Ford</strong> Production <strong>System</strong> Methodology<br />

LEAN Training 2010<br />

1. Know performance expectations from your system of work<br />

2. Expect regularly collected measures of key work<br />

performance in each work cell, leader and worker driven<br />

3. Make performance deviations visible, blameless, daily<br />

4. Understand magnitude and causes of that variation<br />

5. Survey internal and external customers-suppliers for<br />

sources defects (dissatisfaction, patient safety concerns)<br />

6. Use whiteboards in workplace to identify daily defects<br />

1. Lack of, or deviation from standard work<br />

2. Lack of, or deviation from standard connection<br />

3. Lack of, or deviation from standard pathway<br />

4. 7 types of waste that can be redesigned OUT<br />

<strong>Henry</strong> <strong>Ford</strong> Production <strong>System</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!