Target Condition Target Condition LEAN Training 2010 PLAN ‣ Develop & agree on measurable target for problem – (activity of improvement not perfection) ‣ Agree on potential countermeasures Activity • Meet customer’s valid requirement • Select root causes with probable greatest impact Example • Meet surgical pathology (customer’s) requirement 100% of the time for all lymphoma specimens Henry Ford Production System
Defining the Target Condition Ideal state LEAN Training 2010 PLAN Do-Check-Act Current condition Target condition Henry Ford Production System
- Page 1 and 2: A3 Writing HFPS PDCA Road Map LEAN
- Page 3 and 4: What is an A3? LEAN Training 2010
- Page 5 and 6: Core of an Improvement Process Core
- Page 7 and 8: Reason for Improvement PLAN LEAN Tr
- Page 9 and 10: Gross Room Refrigerator Elevator La
- Page 11: Problem Analysis Problem Analysis L
- Page 15 and 16: 2 LEAN Training 2010 Henry Ford Pro
- Page 17 and 18: Implementation Plan Implementation
- Page 19 and 20: Results Legend: =Terminator =Proces
- Page 21 and 22: Future Plans Future Plans LEAN Trai
- Page 23 and 24: Take Home Lessons Take Home Lessons
Defining the Target Condition<br />
Ideal state<br />
LEAN <strong>Training</strong> 2010<br />
PLAN Do-Check-Act<br />
Current condition<br />
Target condition<br />
Henry Ford Production System