03.09.2015 Views

China Electric Power Research Institute (CEPRI) 2013-6-3

幻灯片 1 - Epcc-workshop.net

幻灯片 1 - Epcc-workshop.net

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>China</strong> <strong>Electric</strong> <strong>Power</strong> <strong>Research</strong> <strong>Institute</strong> (<strong>CEPRI</strong>)<br />

<strong>2013</strong>-6-3


Who is <strong>CEPRI</strong>?<br />

<strong>China</strong> <strong>Electric</strong> <strong>Power</strong> <strong>Research</strong> <strong>Institute</strong><br />

<strong>CEPRI</strong>, founded in 1951, a multi-disciplinary<br />

comprehensive research institution of power industry in<br />

<strong>China</strong>.<br />

Department of <strong>Electric</strong> <strong>Power</strong> Automation of <strong>CEPRI</strong><br />

Main dispatching automation system in <strong>China</strong><br />

—— D5000 Smart grid operation supporting system<br />

—— OPEN-3000 (EMS)<br />

—— CC-2000A (EMS)<br />

Responsible for the advanced technology research in<br />

dispatching automation domain


One Platform and Four Categories Application<br />

in D5000<br />

Original 11 systems<br />

DTS<br />

EMS<br />

HMS<br />

TMR<br />

WAMS<br />

RMS<br />

DSA<br />

GS<br />

OMS<br />

LMS<br />

WCIM<br />

Energy Management System (EMS)<br />

Dispatching Training System (DTS )<br />

Hydro-power Management System (HMS)<br />

Wide Area Measuring System (WAMS)<br />

Tele-Meter Reading System (TMR)<br />

Generation Scheduling (GS)<br />

Dynamic Security Analysis System (DSA)<br />

Relay and Fault Information Management<br />

System( RMS )<br />

Operation Management System (OMS)<br />

Lightning Monitoring System (LMS)<br />

Weather Cloud-cover Image Data (WCIM)<br />

Online<br />

integration<br />

Smart Grid Dispatching<br />

Technology Supporting System<br />

fit weak interconnection grid for dispatching<br />

and applied in independent control center


Future National Grid Interconnection<br />

and UHV AC/DC Transmission Systems<br />

2010<br />

2020<br />

UHV Planning<br />

<strong>2013</strong><br />

•From weak interconnection to<br />

strong interconnection in<br />

National Grid


Future Operation Supporting System<br />

<strong>Research</strong> Objectives<br />

• Unified power grid dispatching and unified power grid<br />

management among multiple control centers<br />

•Extend larger monitoring scope, more real-time data and<br />

more comprehensively information for sensing the operation<br />

state<br />

•Combine new IT technique and dispatching demand


Dispatching-cloud Concept<br />

— Based on Cloud Computing technique<br />

— Form a new IT infrastructure management and<br />

service delivery mode<br />

— Integrate application data and IT resources<br />

distributed in each control center<br />

— Construct an abstract, virtual and dynamically<br />

scalable dispatching resource pool<br />

— Provide unified on-demand service for grid<br />

operation supporting


Aspect of System with Dispatching-cloud<br />

• Dispatching entity is distributed, and the system offers an unified service.<br />

• The system includes 3 layers, dispatching entity, service center and end-user.<br />

• SCADA remains in local position.<br />

7


Dispatching-cloud System Prospects<br />

Evolution process from existing dispatching<br />

system to future dispatching-cloud system.<br />

— Improve degree of centralization,<br />

— Reduce the distribution node<br />

— Centralize service function<br />

— Form dispatching-cloud service center<br />

— Construct 2 or 3 dispatching-cloud<br />

service center<br />

— Original local dispatching center turns<br />

to desktop cloud applications.


Dispatching-cloud System<br />

Key Technologies Prospects<br />

• Cloud Computing: offers a framework of<br />

future system.<br />

• Cluster Technology: improve the efficient<br />

of data process<br />

• Big Data Technology :<br />

Unstructured data (video/audio)<br />

semi-structured data store (CIM XML,<br />

CIM/E, CIM SVG, CIM/G etc)<br />

distributed database<br />

• IPv6 Application: extend network address<br />

for more terminals.<br />

• Dynamic Visualization: have the intuitive<br />

feelings of power operation status and<br />

trend .


Summary<br />

Studying on future operation supporting system<br />

Features<br />

— Strong grid dispatching demand<br />

— Unified dispatching and management<br />

— On-demand service resources<br />

— Service centralization<br />

— Desktop cloud for end-users

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!