03.09.2015 Views

IEC TC 57

Interoperability made by IEC TC 57 - Epcc-workshop.net

Interoperability made by IEC TC 57 - Epcc-workshop.net

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Interoperability made by<br />

<strong>IEC</strong> <strong>TC</strong> <strong>57</strong><br />

Dr. Andreas Huber<br />

9th EPCC<br />

11.06.2007<br />

©<br />

Siemens AG 2006


International standards for interoperability<br />

The key for the utility and the vendor<br />

Integrated utility<br />

business operation<br />

F&C<br />

Marketing<br />

Asset<br />

management<br />

Data<br />

warehouse<br />

...<br />

Trading<br />

Risk Mgt.<br />

Business<br />

Services<br />

Added value network<br />

management & optimization<br />

Network control &<br />

supervision<br />

Communication<br />

Field data acquisition,<br />

local control & automation<br />

Partner,<br />

market, etc.<br />

Advanced applications<br />

(EMS, DMS, EDM, GM)<br />

DB<br />

$ Trader<br />

Local<br />

automation<br />

SCADA<br />

Network<br />

planning<br />

Substation Protection<br />

automation<br />

Network<br />

information<br />

Private & public networks<br />

...<br />

RTUs<br />

Meter data<br />

management<br />

Meters<br />

xxxx x xxx xxx xx<br />

Gateway<br />

Power<br />

Exchange<br />

IT Integration<br />

ASP<br />

Administration<br />

Operation<br />

E-Commerce<br />

Maintenance<br />

Page 2<br />

©<br />

Siemens AG 2006<br />

Power Transmission and Distribution


International Electrotechnical Commission,<br />

Technical Committe <strong>57</strong> - <strong>IEC</strong> <strong>TC</strong> <strong>57</strong><br />

Title:<br />

Power systems management and associated information exchange<br />

Scope:<br />

To prepare international standards for power systems control ... and<br />

associated information exchange ... used in the planning, operation<br />

and maintenance of power systems.<br />

• Participating countries 36 (incl. all large markets)<br />

• Publications since 1964 89<br />

• Work in progress 32<br />

• Working groups<br />

10 with ~ 330 expert positions<br />

Page 3<br />

©<br />

Siemens AG 2006<br />

Power Transmission and Distribution


<strong>IEC</strong> <strong>TC</strong> <strong>57</strong><br />

Strategy<br />

The strategy for the future work of <strong>TC</strong> <strong>57</strong> is derived from the following 3<br />

major aspects of the business environment:<br />

• The competitive environment of the power industry asking for<br />

optimization of core processes across IT system boundaries as well as<br />

for reduction of costs<br />

• The fast progress in information and communication technologies<br />

• Security<br />

<strong>TC</strong> <strong>57</strong> strives for a state of the art communication architecture, which<br />

provides full interoperability, avoids superfluous intermediate data model<br />

conversions and eliminates multiple data management. This<br />

communication architecture must be backward compatible and include<br />

migration strategies and paths for legacy protocols.<br />

Page 4<br />

©<br />

Siemens AG 2006<br />

Power Transmission and Distribution


<strong>IEC</strong> <strong>TC</strong> <strong>57</strong><br />

Current work<br />

WG13<br />

WG 14<br />

IT-System<br />

1<br />

IT-System<br />

m<br />

WG16<br />

Market Communication<br />

Control Center A<br />

EMS<br />

DMS<br />

Apps.<br />

Apps.<br />

61968<br />

61968<br />

Control Center B<br />

61970<br />

61970<br />

Communication Bus<br />

WG20<br />

SCADA<br />

Inter-CC<br />

Data Link<br />

60870-6<br />

62488<br />

WG03<br />

60870-5-102<br />

61334<br />

RTU<br />

60870-5-101/104<br />

60870-6-TASE.2<br />

61850<br />

WG19<br />

Interoperability<br />

Substation /<br />

Field Device<br />

1<br />

Substation<br />

Automation<br />

System<br />

WG15<br />

Security<br />

Substation /<br />

Field Device<br />

n<br />

WG10<br />

60870-5-103 61850<br />

Protection, Control, Metering<br />

61850<br />

60834<br />

61850<br />

WG17 (DER)<br />

Page 5<br />

Switchgear, Transformers,<br />

Instrumental Transformers<br />

WG18 (Hydro PP)<br />

©<br />

Siemens AG 2006<br />

Power Transmission and Distribution


Standards for interoperable energy automation<br />

Possible benefits<br />

Simple and efficient operation<br />

• Common Look & Feel<br />

• Plug-and-play interfaces<br />

• Vertical & horizontal interoperability<br />

Cost reduction of engineering<br />

• Single source of data entry<br />

• Up and down loads<br />

• Integrated test & diagnostic<br />

Seamless communication<br />

• IT security and safety<br />

• New technologies<br />

<strong>IEC</strong> 61970<br />

<strong>IEC</strong> 61968<br />

<strong>IEC</strong> 61850<br />

<strong>IEC</strong> 61850<br />

Page 6<br />

©<br />

Siemens AG 2006<br />

Power Transmission and Distribution


<strong>IEC</strong> 61850 Application Fields Today<br />

Control Center<br />

Control Center<br />

<strong>IEC</strong> 60870-5-<br />

101 /-104<br />

Remote<br />

Service /<br />

Diagnostics<br />

Firewall<br />

Router<br />

<strong>IEC</strong>61850 Station Bus (Ethernet)<br />

IED<br />

IED<br />

Protection & Control<br />

Hard-wired process interface<br />

Page 7<br />

©<br />

Siemens AG 2006<br />

Power Transmission and Distribution


The <strong>IEC</strong> 61850 standard and its implementation<br />

From the first completion of an <strong>IEC</strong><br />

61850 substation only 6 months<br />

after release: 16 kV substation<br />

Winznauschachen (Switzerland) ...<br />

... to a 140 IED project at RWE<br />

Power Project<br />

Page 8<br />

©<br />

Siemens AG 2006<br />

Power Transmission and Distribution


<strong>IEC</strong> 61850 Future Application Fields<br />

Control Center<br />

<strong>IEC</strong> 61850<br />

Remote<br />

Service /<br />

Diagnostics<br />

<strong>IEC</strong> 61850<br />

Firewall<br />

communication<br />

to other<br />

substations<br />

<strong>IEC</strong> 61850<br />

Router<br />

<strong>IEC</strong>61850 Station Bus (Ethernet)<br />

IED<br />

IED<br />

Protection & Control<br />

<strong>IEC</strong>61850 Process Bus (Real Time Ethernet)<br />

Page 9<br />

CT<br />

VT<br />

Digital Instrument<br />

Transformer<br />

Data via <strong>IEC</strong>61850-9-2<br />

©<br />

Siemens AG 2006<br />

Power Transmission and Distribution


<strong>IEC</strong> 61850 based on Real Time Ethernet<br />

CIGRE Paris 2006<br />

Page 10<br />

©<br />

Siemens AG 2006<br />

Power Transmission and Distribution


<strong>IEC</strong> 61850 based communication between<br />

substation and <strong>IEC</strong> 61890 based control center<br />

Project Solvay Dombasle-sur-Meurte, France, and further Solvay plants<br />

Completed mid of 2006<br />

Enhanced Spectrum SCADA<br />

CIM-based<br />

PowerCC<br />

Corporate<br />

Network <strong>TC</strong>P/IP<br />

Page 11<br />

<strong>IEC</strong> 61850<br />

Station bus<br />

...<br />

*) *) *) *) *)<br />

*) <strong>IEC</strong> 61850 Server<br />

<strong>IEC</strong> 61850<br />

...<br />

Station bus<br />

*) *) *) *) *)<br />

©<br />

Siemens AG 2006<br />

Power Transmission and Distribution

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!