OMB Approval 2700-0042<br />

1. CONTRACT ID CODE PAGE OF PAGES<br />

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 5<br />

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)<br />

<strong>A00001</strong> See BLK 16 <strong>HSCG23</strong>-06-D-ARB001 RB-M<br />

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE<br />

Administrative Contracting Office<br />

1600 Ely Street<br />

Marinette WI. 54143-2434<br />

Vicki.A.Smith@uscg.mil<br />

8. NAME AND ADDRESS OF CONTRACTOR (No. Street, county, State and ZIP: Code) () 9A. AMENDMENT OF SOLICITATION NO.<br />

N/A<br />

9B. DATED (SEE ITEM 11)<br />

Marinette Marine Corporation, Inc.<br />

1600 Ely Street<br />

Marinette, WI 54143<br />

DUNS #00-613-5388 X <strong>HSCG23</strong>-06-D-ARB001<br />

<strong>HSCG23</strong>-<strong>09</strong>-J-<strong>ARP268</strong><br />

10B. DATED (SEE ITEM 13)<br />

CODE FACILITY CODE 21JUN2006<br />

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS<br />

10A. MODIFICATION OF CONTRACT/ORDER NO.<br />

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.<br />

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:<br />

(a) By completing Items 8 and 15, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;<br />

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE<br />

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATA SPECIFIED MAY RESULT IN REJECTION OF<br />

YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each<br />

telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and data specified.<br />

12. ACCOUNTING AND APPROPRIATION DATA (If required) N/A<br />

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,<br />

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.<br />

() A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.<br />

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET<br />

FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).<br />

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:<br />

X D.<br />

OTHER Specify type of modification and authority)<br />

52.243-3 Changes – Time-and-Materials or Labor-Hours (Sept 2000)<br />

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.<br />

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)<br />

This Modification to <strong>Task</strong> <strong>Order</strong> <strong>HSCG23</strong>-<strong>09</strong>-J-<strong>ARP268</strong> incorporates revised scope of work.<br />

Reference Direction to Proceed (DTP) dated July 2, 20<strong>09</strong>.<br />

(CONTINUED ON NEXT PAGE)<br />

Except at provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.<br />

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)<br />

VICKI A. SMITH, ADMINISTRATIVE CONTRACTING OFFICER<br />

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED<br />

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)<br />

PREVIOUS EDITION UNUSABLE Computer Generated Prescribed by GSA<br />

FAR (48 CFR) 53.243


1. The revised scope of work tasked by the Administrative Contracting Officer’s e-mail dated<br />

July 2, 20<strong>09</strong> is hereby formally incorporated into the <strong>Task</strong> <strong>Order</strong>. This Modification transfers a<br />

portion of the effort from CLIN 3007 to CLIN 4007 to allow MMC to invoice for the added work<br />

at Price Period 4 labor rates.<br />

2. Optional Form 347, part 17(b), Supplies or Services, is hereby modified to read as follows:<br />

This <strong>Task</strong> <strong>Order</strong>, under IDIQ Contract <strong>HSCG23</strong>-06-D-ARB001, establishes a time period and<br />

Not-to-Exceed (NTE) value for Engine Room Intake Ventilation Baffle Prototype and Testing on<br />

Hull 45602 and 45613 in accordance with the attached revised Scope of Work.<br />

The total NTE amount for this order remains at $12,000.<br />

Time and Materials CLIN 3007, Technical Services NTE amount is hereby changed from<br />

$12,000 to $6,000.<br />

Time and Materials CLIN 4007, Technical Services NTE amount is hereby added in the amount<br />

of $6,000.<br />

After the establishment of final costs under this <strong>Task</strong> <strong>Order</strong>, a Modification will be issued to<br />

deobligate excess funds.<br />

Period of Performance is 8 June 20<strong>09</strong> – 30 September 20<strong>09</strong>.<br />

3. All other terms and conditions of the <strong>Task</strong> <strong>Order</strong> remain unchanged.<br />

<strong>A00001</strong> Page 2 of 5


Amended Scope of Work for Technical Services under CLIN 3007 and 4007<br />

<strong>Task</strong> <strong>Order</strong><br />

<strong>HSCG23</strong>-<strong>09</strong>-J-<strong>ARP268</strong><br />

Hull 45602 and 45613 Engine Room Intake Ventilation Baffle<br />

1.0 Background:<br />

1.1 Operational Testing and Evaluation (OT&E) of the RB-M has indicated<br />

that water intrusion into the Engine Room may occur through the intake<br />

demisters. Intrusion has been observed to occur through routine cleaning<br />

of demisters with fresh water hoses as well as in conditions of following<br />

seas when green water has been taken over the stern.<br />

1.2 The Government has developed a baffle concept that is approximately 5”<br />

high to capture any water that intrudes past the intake demisters prior to<br />

making it into the ducting on the RB-M. Photographs of the area and a<br />

concept design of this baffle have been provided as enclosure (1).<br />

1.3 The Government requests that the Contractor perform engineering design<br />

services to validate the baffle concept, recommend specific design<br />

configuration, and incorporate the baffle as a prototype on Hull 45602 in<br />

order to test any effect on engine performance.<br />

1.4 For any vendor support the Contractor intends to obtain as a material cost<br />

estimated to exceed $500 under this order, aside from prototype materials,<br />

Engine Original Equipment Manufacturer (OEM) performance testing,<br />

and Gas free testing for welding the Contractor shall obtain Contracting<br />

Officer’s approval in advance of the purchase.<br />

2.0 Requirements: The Contractor shall evaluate the prototype in the following methods.<br />

2.1 Technical Evaluation of Concept: The Contractor shall evaluate the<br />

concept design of this baffle to determine whether the height of the baffle<br />

will result in any adverse effects on engine performance.<br />

Recommendations to improve performance, such as increased height or<br />

fwd location shall be provided.<br />

2.2 Technical Design Review – At least 3 business days prior to the<br />

installation, a technical design review shall occur to present the baffle<br />

prototype design and available revised calculations. The review shall<br />

finalize Government and Contractor expectations of prototype baffle<br />

installation and testing.<br />

2.2.1 [<strong>A00001</strong>] Installation of the Baffle Prototype on Hull 45602: The<br />

Contractor shall install the prototype baffle on Hull 45602 during<br />

an upcoming availability<br />

<strong>A00001</strong><br />

Page 3 of 5


Amended Scope of Work for Technical Services under CLIN 3007 and 4007<br />

<strong>Task</strong> <strong>Order</strong><br />

<strong>HSCG23</strong>-<strong>09</strong>-J-<strong>ARP268</strong><br />

2.2.2 The prototype shall be installed in accordance with all relevant<br />

requirements of the RB-M Production Contract, <strong>HSCG23</strong>-06-D-<br />

ARB001.<br />

2.2.3 Engine performance prior and after installation of the baffle will be<br />

tested to ensure engine performance is not significantly altered.<br />

Engine OEM representatives shall be present to perform these tests<br />

prior to and after baffle prototype installation to certify the engine<br />

performance.<br />

2.2.4 Air velocity at engine room side of the intake will be measured and<br />

recorded at 10 speeds to include idle, cruise speed (30 kts), and<br />

Max speed (42.5+ Kts) both prior to and after the installation of the<br />

baffle. Engine RPM shall be recorded for each speed.<br />

2.2.5 Engine room/Atmospheric differential pressure shall be measured<br />

and recorded with a manometer at 10 speeds to include idle, cruise<br />

speed (30 kts), and Max speed (42.5+ Kts) both prior to and after<br />

the installation of the baffle. Engine RPM will be recorded for each<br />

speed.<br />

2.3 [<strong>A00001</strong>] Installation of the Baffle Prototype on Hull 45613: The<br />

Contractor shall install the prototype baffle on Hull 45613 prior to<br />

Post-Construction Inspection.<br />

2.3.1 The prototype shall be installed in accordance with all relevant<br />

requirements of the RB-M Production Contract, <strong>HSCG23</strong>-06-<br />

D-ARB001.<br />

2.3.2 No additional testing shall be conducted on 45613. Engine<br />

performance data obtained during normal pre-delivery testing<br />

and trials shall be compared against the 45602 test results to<br />

verify prototype effectiveness.<br />

2.4 If the prototype baffle limits the performance of the engines resulting in<br />

failed OEM performance tests, the prototype shall be removed. All<br />

disturbed surfaces shall be returned to pre-installation conditions. This<br />

work shall be covered under a separate task order.<br />

2.5 Evaluation of Results – The Contractor shall present results of the<br />

prototype to the Government for evaluation within one week of<br />

completion of testing. The report shall document:<br />

2.5.1 The as-built configuration of the prototype using appropriate<br />

sketches and photographs.<br />

2.5.2 Engine performance evaluation testing prior to and after the install<br />

<strong>A00001</strong><br />

Page 4 of 5


Amended Scope of Work for Technical Services under CLIN 3007 and 4007<br />

<strong>Task</strong> <strong>Order</strong><br />

<strong>HSCG23</strong>-<strong>09</strong>-J-<strong>ARP268</strong><br />

2.5.3 Data Table and plot of Engine Room Intake Air Velocity vs<br />

Engine RPM before and after install of baffle. RB-M speed and<br />

supply CFM shall also be presented in the table and the plot.<br />

2.5.4 Data Table and plot of differential pressure vs Engine RPM before<br />

and after install of baffle. RB-M speed shall also be presented in<br />

the plot.<br />

2.5.5 Data and Plots shall be available in Excel Format.<br />

2.5.6 The Government reviewed the Engine Room Ventilation<br />

Calculations (45RBM-514-003) submitted under CDRL 085-004<br />

as part of this prototype effort and identified areas that require<br />

revision. These issues are presented as Encl. (2) and were<br />

presented to MMC during an April 22 nd meeting and marked up<br />

spreadsheets were provided to the Contractor via email after the<br />

discussion.<br />

<strong>A00001</strong><br />

Page 5 of 5


FREV<br />

8 7 6 5 4 3 2 1<br />

F<br />

E<br />

E<br />

D<br />

D<br />

ISOMETRIC VIEW<br />

C<br />

C<br />

B<br />

A<br />

DEngine Room Intake<br />

B<br />

A<br />

PLAN VIEW<br />

SCALE 1:20<br />

UNLESS OTHERWISE SPECIFIED:<br />

DIMENSIONS ARE IN INCHES<br />

TOLERANCES:<br />

FRACTIONAL<br />

ANGULAR: MACH BEND<br />

TWO PLACE DECIMAL<br />

THREE PLACE DECIMAL<br />

DRAWN<br />

CHECKED<br />

ENG APPR.<br />

MFG APPR.<br />

NAME<br />

DATE<br />

TITLE:<br />

A<br />

PROPRIETARY AND CONFIDENTIAL<br />

THE INFORMATION CONTAINED IN THIS<br />

DRAWING IS THE SOLE PROPERTY OF<br />

. ANY<br />

REPRODUCTION IN PART OR AS A WHOLE<br />

WITHOUT THE WRITTEN PERMISSION OF<br />

IS<br />

PROHIBITED.<br />

NEXT ASSY<br />

USED ON<br />

APPLICATION<br />

INTERPRET GEOMETRIC<br />

TOLERANCING PER:<br />

MATERIAL<br />

FINISH<br />

Q.A.<br />

COMMENTS:<br />

SIZE<br />

D<br />

DWG. NO.<br />

SCALE: 1:100WEIGHT:<br />

REV<br />

SHEET 1 OF 3<br />

8<br />

7<br />

6<br />

5<br />

4<br />

3<br />

2<br />

1


FREV<br />

8 7 6 5 4 3 2 1<br />

F<br />

E<br />

DECK OPENING<br />

13 1/2"<br />

E<br />

9"<br />

B<br />

B<br />

12"<br />

D<br />

29 1/2"<br />

12 3/8"<br />

D<br />

13 5/8"<br />

C<br />

C<br />

B<br />

DETAIL A<br />

SCALE 1 : 5<br />

DEngine Room Intake<br />

B<br />

SECTION B-B<br />

SCALE 1 : 5<br />

A<br />

UNLESS OTHERWISE SPECIFIED:<br />

DIMENSIONS ARE IN INCHES<br />

TOLERANCES:<br />

FRACTIONAL<br />

ANGULAR: MACH BEND<br />

TWO PLACE DECIMAL<br />

THREE PLACE DECIMAL<br />

DRAWN<br />

CHECKED<br />

ENG APPR.<br />

MFG APPR.<br />

NAME<br />

DATE<br />

TITLE:<br />

A<br />

PROPRIETARY AND CONFIDENTIAL<br />

THE INFORMATION CONTAINED IN THIS<br />

DRAWING IS THE SOLE PROPERTY OF<br />

. ANY<br />

REPRODUCTION IN PART OR AS A WHOLE<br />

WITHOUT THE WRITTEN PERMISSION OF<br />

IS<br />

PROHIBITED.<br />

NEXT ASSY<br />

USED ON<br />

APPLICATION<br />

INTERPRET GEOMETRIC<br />

TOLERANCING PER:<br />

MATERIAL<br />

FINISH<br />

Q.A.<br />

COMMENTS:<br />

SIZE<br />

D<br />

DWG. NO.<br />

SCALE: 1:200WEIGHT:<br />

REV<br />

SHEET 2 OF 3<br />

8<br />

7<br />

6<br />

5<br />

4<br />

3<br />

2<br />

1


29 7/8"<br />

1 1/8"<br />

R1/4"<br />

FREV<br />

8 7 6 5 4 3 2 1<br />

F<br />

E<br />

E<br />

D<br />

5"<br />

86.80°<br />

6 5/8"<br />

Isometric View of Baffle<br />

D<br />

Elevation View of Baffle<br />

1"<br />

C<br />

Side View of Baffle<br />

C<br />

B<br />

3"<br />

5/8"<br />

DEngine Room Intake<br />

B<br />

Bottom View of Baffle<br />

A<br />

UNLESS OTHERWISE SPECIFIED:<br />

DIMENSIONS ARE IN INCHES<br />

TOLERANCES:<br />

FRACTIONAL<br />

ANGULAR: MACH BEND<br />

TWO PLACE DECIMAL<br />

THREE PLACE DECIMAL<br />

DRAWN<br />

CHECKED<br />

ENG APPR.<br />

MFG APPR.<br />

NAME<br />

DATE<br />

TITLE:<br />

A<br />

PROPRIETARY AND CONFIDENTIAL<br />

THE INFORMATION CONTAINED IN THIS<br />

DRAWING IS THE SOLE PROPERTY OF<br />

. ANY<br />

REPRODUCTION IN PART OR AS A WHOLE<br />

WITHOUT THE WRITTEN PERMISSION OF<br />

IS<br />

PROHIBITED.<br />

NEXT ASSY<br />

USED ON<br />

APPLICATION<br />

INTERPRET GEOMETRIC<br />

TOLERANCING PER:<br />

MATERIAL<br />

FINISH<br />

Q.A.<br />

COMMENTS:<br />

SIZE<br />

D<br />

SCALE: 1:2<br />

DWG. NO.<br />

WEIGHT:<br />

REV<br />

SHEET 3 OF 3<br />

8<br />

7<br />

6<br />

5<br />

4<br />

3<br />

2<br />

1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!