03.09.2015 Views

NAVAIR INSTRUCTION 4120.11 From: Commander, Naval Air ...

NAVAIR INSTRUCTION 4120.11 From: Commander, Naval Air ...

NAVAIR INSTRUCTION 4120.11 From: Commander, Naval Air ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>NAVAIR</strong>INST <strong>4120.11</strong><br />

Cat Functionality Definition Examples and Comments<br />

U Full Revision A full revision is a complete<br />

replacement of the data<br />

previously distributed. A Full<br />

Revision may or may not<br />

contain detailed change<br />

markings (or a change<br />

summary).<br />

U<br />

U<br />

Uo<br />

Near Real Time<br />

Updates<br />

Passive Change<br />

Indications and<br />

markings<br />

Network<br />

Connectivity<br />

Updates are available quickly<br />

to the user after they are<br />

authorized. This reduction in<br />

distribution time results in the<br />

maintainer having more up to<br />

date data [See “Distribution –<br />

Network Distribution”]<br />

Display and tracking of change<br />

information can drive costs.<br />

Passive changes are a<br />

summary of change data and<br />

are not discretely marked or<br />

identified in the ETM.<br />

The end user has access to the<br />

ETM via a network<br />

infrastructure. The data can be<br />

downloaded to or viewed on<br />

the client device. Device may<br />

be disconnected and operated<br />

in a stand-alone mode. The<br />

Data changes/revisions are<br />

installed on the host server and<br />

updates are transmitted via the<br />

network. [See “Connectivity -<br />

Update Capability (Full<br />

Revision and Partial Data)”]<br />

31 Enclosure (2)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!