03.09.2015 Views

NAVAIR INSTRUCTION 4120.11 From: Commander, Naval Air ...

NAVAIR INSTRUCTION 4120.11 From: Commander, Naval Air ...

NAVAIR INSTRUCTION 4120.11 From: Commander, Naval Air ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>NAVAIR</strong>INST <strong>4120.11</strong><br />

Subj:<br />

POLICY FOR PREPARATION AND STANDARDIZATION OF <strong>NAVAIR</strong><br />

INTERACTIVE ELECTRONIC TECHNICAL MANUALS (IETMS)<br />

d. Enclosure (2) is a description of the various IETM<br />

functional capabilities and a guide for using the<br />

functionality matrix. Enclosure (3) is the matrix itself. It<br />

is designed to serve as a program manager’s “shopping list”<br />

for technical data functional capabilities.<br />

e. Common Look and Feel across IETM types is important to the<br />

fleet customer. Enclosure (4) describes screen layouts,<br />

navigation and other basic “look and feel” requirements for<br />

<strong>NAVAIR</strong> IETMS.<br />

f. Amplifying information describing XML, MIL-STD-3001, and<br />

S1000D is provided in enclosure (5).<br />

4. Responsibilities.<br />

a. Program Managers shall:<br />

(1) Select the appropriate IETM development specification<br />

based on an analysis of functional requirements and cost<br />

benefits.<br />

(2) Ensure that contract requirements for new acquisitions,<br />

major updates to existing IETMs, and legacy conversions are<br />

assembled using enclosures (1) through (3).<br />

(3) Implement Navy Marine Corps Internet (NMCI)<br />

requirements with respect to desired IETM functionalities.<br />

(Those that require executable files will not be acceptable<br />

in an NMCI environment and will require certification<br />

testing for each and every upgrade).<br />

(4) Acquire all new IETMS in accordance with the “Look and<br />

Feel” requirements set forth in enclosure (4).<br />

(5) Assess legacy IETMs against the Common Look and Feel<br />

and develop migration plans to achieve the level of<br />

standardization reasonable for their program and customer<br />

Consider economic feasibility and the fleet goal for<br />

standardization. Complete and submit migration plans, with<br />

estimated completion dates, to <strong>NAVAIR</strong> 6.8 within six months<br />

of promulgation of this instruction. Submit annual updates<br />

to the plan, delineating progress and/or changes.<br />

3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!