HSCG23-06-D-ARB001<br />

BLOCK 14 – DESCRIPTION OF MODIFICATION (CONTINUED)<br />

A. REA-007 DEFINITIZATION: This Modification incorporates and definitizes REA-007, entitled,<br />

“Promotional Video” at the negotiated price of $31,083. A partial Direction to Proceed (DTP)<br />

was given on 5 June 2007 to MMC to immediately proceed with creating the storyboard only<br />

IAW SOW 099-4.3 for the REA-007 effort incorporated in 099-4.2. A Full DTP was issued on 11<br />

July 2007.<br />

B. REA-011 DEFINITIZATION: This Modification incorporates and definitizes REA-011, entitled,<br />

“MMC Display Model Shipment” at the negotiated price of $3,963. A DTP including the shipping<br />

information was issued on 25 October 2007. This DTP directed MMC to proceed with REA 011,<br />

entitled, ”MMC Display Model Shipment”, in accordance with SOW 099-2.2 Change Language.<br />

This REA covers MMC's packaging and shipping costs to send their display model to New<br />

Orleans for the <strong>US</strong>CG Innovation Expo and return it to Marinette.<br />

C. REA-013 DEFINITIZATION: This Modification incorporates and definitizes REA-013, entitled,<br />

“Commandant Visit to Mock-Up” at the negotiated price of $5,293. The <strong>US</strong>CG Commandant<br />

visited MMC’s subcontractor’s facility on 11 May 2007 to view the RB-M mock-up. This visit<br />

caused a plant shut down for approximately 60 minutes. This REA also included shop clean up<br />

and safety checks of the facility.<br />

D. INTERIM FUNDING OF PENDING ECPs/REAs: The Contracting Officer previously<br />

authorized work to proceed under specified Engineering Change Proposals (ECP) and<br />

Requests for Equitable Adjustment (REA). The <strong>Coast</strong> <strong>Guard</strong> determined that the work<br />

associated with these Changes be performed without delay. Priced proposals have been<br />

submitted by the Contractor for fourteen Changes and the technical and pricing aspects are<br />

currently under Government review. For equity considerations and pending the completion of<br />

<strong>Coast</strong> <strong>Guard</strong> review and subsequent negotiations, this Modification sets forth interim funding for<br />

these Changes, so that payments may be issued toward the progress made. It is the<br />

Government’s intent to adjust the value of CLIN 1009 by assigning a finalized nonrecurring<br />

amount for each Change upon completion of negotiations. The interim funding for nonrecurring<br />

costs associated with pending Changes under CLIN 1009 is established at an initial price of<br />

$340,000.<br />

E. PART I – THE SCHEDULE, SECTION B - SUPPLIES OR SERVICES AND PRICES:<br />

1. Section B.1.1.b, CLIN 1009, entitled, “Post Award Changes to RB-M Detailed Design”<br />

is increased by $340,000 from $206,308 to $546,308 for interim funding of pending REAs and<br />

ECPs.<br />

2. Section B.1.1.b, CLIN 1010, entitled, “Post Award Changes Other Than RB-M Detailed<br />

Design” is added in the amount of $40,339 for the definitization of REA-007, REA-011 and REA-<br />

013.<br />

3. Section B.1.1.b CLIN 1010 is added to list of inclusions for Program Management in<br />

CLINs 3001, 4001, 5001, 6001, 7001, and 8001.<br />

2 of 21 <strong>A00019</strong>


HSCG23-06-D-ARB001<br />

BLOCK 14 – DESCRIPTION OF MODIFICATION (CONTINUED)<br />

F. PART I – THE SCHEDULE, SECTION C - DESCRIPTION:<br />

Section C.5, Detailed Design of <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> (CLIN 1002, 1009), paragraph C.5.1<br />

is added to include a description of CLIN 1010.<br />

G. PART I –THE SCHEDULE, SECTION F – DELIVERABLES OR PERFORMANCE:<br />

Section F.2, Desired and Required Time of Delivery, paragraph F.2.2, Required Delivery<br />

Schedule, is revised to add CLIN 1010.<br />

H. PART I – THE SCHEDULE, SECTION G – CONTRACT ADMINISTRATION DATA:<br />

Section G.3, Invoicing Requirements, paragraph G.3.2 is revised to add CLIN 1010.<br />

I. PART III, LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS, SECTION J,<br />

ATTACHMENT 1 - STATEMENT OF WORK:<br />

1. Section 068-2.2, Configuration Baselines, paragraph 068-2.2.4 is revised to allow the<br />

Contracting Officer’s designation of the hull for the first PCA.<br />

2. Section 080-2, Interim Contractor Logistics Support, paragraph 080-2.3.5 is revised to<br />

further define “Minor Defects”.<br />

3. Section 099, Photographs, paragraph 099-2.2 is added to include the requirement to<br />

ship Contractor owned display model, Reference REA-011.<br />

4. Section 099-4, Video, paragraph 099-4.2 is revised to include a three to five minute<br />

promotional video suitable for use in showcasing the progressive design development process<br />

being used on the RB-M, Reference REA-007. Paragraph 099-4.4.2.3 is deleted and paragraph<br />

099-4.4.2.4 is changed from four copies to eight copies to remove the requirement for VHS<br />

media and increase the DVD media by four copies, Reference REA-007.<br />

J. PART III, LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS, SECTION J,<br />

ATTACHMENT 2 - SPECIFICATION:<br />

1. Section 320.8, Portable Equipment Power Outlets, paragraph 320-8.1 is revised to<br />

incorporate deletions inadvertently missed in Modification A00014, Reference ECP-028.<br />

2. Section 634, Deck Covering, paragraph 634-1.1 is revised to incorporate deletions<br />

inadvertently missed in Modification A00014, Reference ECP-028.<br />

K. PART-III – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS, SECTION J,<br />

ATTACHMENT 3 – CDRLs/DIDs:<br />

CDRL 080-005, Block 3, Subtitle, is revised from “Minor Defects List” to “Major Defects List”.<br />

3 of 21 <strong>A00019</strong>


HSCG23-06-D-ARB001<br />

BLOCK 14 – DESCRIPTION OF MODIFICATION (CONTINUED)<br />

L. This Modification does not obligate Government funds. The change in CLIN values<br />

associated with these changes will be awarded by forthcoming Delivery Orders.<br />

M. This completes block 14.<br />

4 of 21 <strong>A00019</strong>


<strong>US</strong>CG <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> (RB-M)<br />

HSCG23-06-D-ARB001<br />

ITEM # SUPPLIES/ SERVICES UNIT PRICE<br />

1003a [Orig] Hulls 1-8 EACH $1,927,156<br />

1003b [Orig] Hulls 9-20 EACH $1,896,800<br />

1003c [Orig] Hulls 21-36 EACH $1,886,811<br />

1004 [Orig] RB-M Cradle (as described in Section<br />

C.7)<br />

EACH $16,222<br />

1005 [Orig] Display Model (as described in C.8) EACH $15,340<br />

1009 [<strong>A00019</strong>] Post Award Changes to RB-M Detailed<br />

Design<br />

1010 [<strong>A00019</strong>] Post Award Changes Other Than<br />

RB-M Detailed Design<br />

PRICE PERIOD TWO<br />

2001 [Orig] Project Management (as described in<br />

Section C.4). This CLIN is required<br />

whenever work, other than that<br />

associated with warranty<br />

administration, under 1002, 1009,<br />

x003, x004, x005, x006, x007, or x008<br />

is ongoing. The Government may<br />

order any quantity of months under<br />

this CLIN provided that the<br />

performance period is limited to<br />

this price period.<br />

JOB $546,308<br />

JOB $40,339<br />

MONTH $510,426<br />

2002 [Orig] Vacant N/A __N/A___<br />

2003 [Orig] <strong>Response</strong> <strong>Boat</strong> - <strong>Medium</strong> (as<br />

described in Section C.6). Hulls refers<br />

to a range of total consecutive RB-Ms<br />

ordered under this contract (i.e. hull 9<br />

cannot be ordered until hull 8 is<br />

ordered). The Government may order<br />

all or any part of this CLIN during this<br />

price period, provided that an<br />

individual hull may not be ordered<br />

more than once under this contract.<br />

2003a [Orig] Hulls 1-8 EACH $2,055,228<br />

2003b [Orig] Hulls 9-20 EACH $1,896,800<br />

2003c [Orig] Hulls 21-36 EACH $1,886,811<br />

2003d [Orig] Hulls 37-66 EACH $1,887,154<br />

2004 [Orig] RB-M Cradle (as described in Section<br />

C.7)<br />

EACH $16,637<br />

2005 [Orig] Display Model (as described in C.8). EACH $15,732<br />

PRICE PERIOD THREE<br />

PART I, SECTION B, <strong>A00019</strong> Page 5 of 21 Supplies or Services and Prices


<strong>US</strong>CG <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> (RB-M)<br />

HSCG23-06-D-ARB001<br />

ITEM # SUPPLIES/ SERVICES UNIT PRICE<br />

3001 [Orig] Project Management (as described in<br />

Section C.4). This CLIN is required<br />

whenever work, other than that<br />

associated with warranty<br />

administration, under 1002, 1009,<br />

1010, x003, x004, x005, x006, x007, or<br />

x008 is ongoing. The Government<br />

may order any quantity of months<br />

under this CLIN provided that the<br />

performance period is limited to this<br />

price period.<br />

MONTH $495,446<br />

3002 [Orig] Vacant N/A __N/A___<br />

3003 [Orig] <strong>Response</strong> <strong>Boat</strong> - <strong>Medium</strong> (as<br />

described in Section C.6). Hulls refers<br />

to a range of total consecutive RB-Ms<br />

ordered under this contract (i.e. hull 9<br />

cannot be ordered until hull 8 is<br />

ordered). The Government may order<br />

all or any part of this CLIN during this<br />

price period, provided that an<br />

individual hull may not be ordered<br />

more than once under this contract.<br />

3003a [Orig] Hulls 1-8 EACH $2,132,152<br />

3003b [Orig] Hulls 9-20 EACH $2,085,873<br />

3003c [Orig] Hulls 21-36 EACH $1,886,811<br />

3003d [Orig] Hulls 37-66 EACH $1,887,154<br />

3003e [Orig] Hulls 67-96 EACH $1,900,483<br />

3004 [Orig] RB-M Cradle (as described in Section<br />

C.7)<br />

EACH $17,051<br />

3005 [Orig] Display Model (as described in C.8) EACH $16,124<br />

PRICE PERIOD FOUR<br />

4001 [Orig] Project Management (as described in<br />

Section C.4). This CLIN is required<br />

whenever work, other than that<br />

associated with warranty<br />

administration, under 1002, 1009,<br />

1010, x003, x004, x005, x006, x007, or<br />

x008 is ongoing. The Government<br />

may order any quantity of months<br />

under this CLIN provided that the<br />

performance period is limited to this<br />

price period.<br />

MONTH $474,251<br />

4002 [Orig] Vacant N/A __N/A___<br />

4003 [Orig] <strong>Response</strong> <strong>Boat</strong> - <strong>Medium</strong> (as<br />

PART I, SECTION B, <strong>A00019</strong> Page 6 of 21 Supplies or Services and Prices


<strong>US</strong>CG <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> (RB-M)<br />

HSCG23-06-D-ARB001<br />

ITEM # SUPPLIES/ SERVICES UNIT PRICE<br />

described in Section C.6). Hulls refers<br />

to a range of total consecutive RB-Ms<br />

ordered under this contract (i.e. hull 9<br />

cannot be ordered until hull 8 is<br />

ordered). The Government may order<br />

all or any part of this CLIN during this<br />

price period, provided that an<br />

individual hull may not be ordered<br />

more than once under this contract.<br />

4003a [Orig] Hulls 1-8 EACH $2,211,746<br />

4003b [Orig] Hulls 9-20 EACH $2,154,988<br />

4003c [Orig] Hulls 21-36 EACH $2,139,849<br />

4003d [Orig] Hulls 37-66 EACH $1,887,154<br />

4003e [Orig] Hulls 67-96 EACH $1,900,483<br />

4003f [Orig] Hulls 97-126 EACH $1,941,551<br />

4004 [Orig] RB-M Cradle (as described in Section<br />

C.7)<br />

EACH $17,465<br />

4005 [Orig] Display Model (as described in C.8) EACH $16,515<br />

PRICE PERIOD FIVE<br />

5001 [Orig] Project Management (as described in<br />

Section C.4). This CLIN is required<br />

whenever work, other than that<br />

associated with warranty<br />

administration, under 1002, 1009,<br />

1010, x003, x004, x005, x006, x007, or<br />

x008 is ongoing. The Government<br />

may order any quantity of months<br />

under this CLIN provided that the<br />

performance period is limited to the<br />

date established in FAR 52.216-22,<br />

incorporated at I.1, or, if Option Period<br />

1 is exercised, this price period.<br />

MONTH $522,052<br />

5002 [Orig] Vacant N/A __N/A___<br />

5003 [Orig] <strong>Response</strong> <strong>Boat</strong> - <strong>Medium</strong> (as<br />

described in Section C.6). Hulls refers<br />

to a range of total consecutive RB-Ms<br />

ordered under this contract (i.e. hull 9<br />

cannot be ordered until hull 8 is<br />

ordered). The Government may order<br />

all or any part of this CLIN during this<br />

price period, provided that an<br />

individual hull may not be ordered<br />

more than once under this contract.<br />

5003a [Orig] Hulls 1-8 EACH $2,295,417<br />

PART I, SECTION B, <strong>A00019</strong> Page 7 of 21 Supplies or Services and Prices


<strong>US</strong>CG <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> (RB-M)<br />

HSCG23-06-D-ARB001<br />

ITEM # SUPPLIES/ SERVICES FEE<br />

PRICE PERIOD ONE<br />

1008 [Orig] Spare/Repair Parts (as described in C.11). $2,500<br />

PRICE PERIOD TWO<br />

2008 [Orig] Spare/Repair Parts (as described in C.11). $17,500<br />

PRICE PERIOD THREE<br />

3008 [Orig] Spare/Repair Parts (as described in C.11). $40,000<br />

PRICE PERIOD FOUR<br />

4008 [Orig] Spare/Repair Parts (as described in C.11). $533,000<br />

PRICE PERIOD FIVE<br />

5008 [Orig] Spare/Repair Parts (as described in C.11). $338,800<br />

B.1.2. [Orig] OPTION PERIOD 1: END OF BASE CONTRACT PERIOD THROUGH 36<br />

MONTHS THEREAFTER, CONSISTING OF THREE TWELVE-MONTH PRICING<br />

PERIODS.<br />

a. [Orig] The prices below reflect indefinite-delivery, indefinite-quantity (IDIQ)<br />

contract line items to be performed in accordance with the contract requirements<br />

for the option period. Orders will be placed IAW FAR clauses 52.216-18 Ordering<br />

(Oct 1995), 52.216-19 Order Limitations (Oct 1995), and 52.216-22 Indefinite<br />

Quantity (Oct 1995) incorporated into this contract in Section I.1. Except for any<br />

limitations on quantities in the Order Limitations clause or in the Schedule, there is<br />

no limit on the number of orders that may be issued. The Government may issue<br />

orders requiring delivery to multiple destinations or performance at multiple<br />

locations.<br />

b. [Orig] The exercise of any option shall be in writing by formal modification to the<br />

contract in accordance with FAR clauses 52.217-8 Option to Extend Services (Nov<br />

1999) and 52.217-9 Option to Extend the Term of the Contract (Mar 2000),<br />

incorporated into this contract in Section I.<br />

c. [Orig] FIRM FIXED PRICE LINE ITEMS<br />

ITEM # SUPPLIES/ SERVICES UNIT PRICE<br />

PRICE PERIOD SIX<br />

6001 [Orig] Project Management (as described in<br />

Section C.4). This CLIN is required<br />

whenever work, other than that<br />

associated with warranty administration,<br />

under 1002, 1009, 1010, x003, x004,<br />

x005, x006, x007, or x008 is ongoing.<br />

The Government may order any quantity<br />

of months under this CLIN provided that<br />

the performance period is limited to this<br />

price period.<br />

MONTH $504,311<br />

PART I, SECTION B, <strong>A00019</strong> Page 8 of 21 Supplies or Services and Prices


<strong>US</strong>CG <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> (RB-M)<br />

HSCG23-06-D-ARB001<br />

ITEM # SUPPLIES/ SERVICES UNIT PRICE<br />

6002 [Orig] Vacant N/A __N/A___<br />

6003 [Orig] <strong>Response</strong> <strong>Boat</strong> - <strong>Medium</strong> (as described<br />

in Section C.6). Hulls refers to a range of<br />

total consecutive RB-Ms ordered under<br />

this contract (i.e. hull 9 cannot be ordered<br />

until hull 8 is ordered). The Government<br />

may order all or any part of this CLIN<br />

during this price period, provided that an<br />

individual hull may not be ordered more<br />

than once under this contract.<br />

6003a [Orig] Hulls 7-8 EACH $2,341,143<br />

6003b [Orig] Hulls 9-20 EACH $2,301,547<br />

6003c [Orig] Hulls 21-36 EACH $2,284,743<br />

6003d [Orig] Hulls 37-66 EACH $2,282,129<br />

6003e [Orig] Hulls 67-96 EACH $2,264,503<br />

6003f [Orig] Hulls 97-126 EACH $1,941,551<br />

6003g [Orig] Hulls 127-156 EACH $1,987,131<br />

6003h [Orig] Hulls 157-180 EACH $2,038,564<br />

6003i [Orig] Hulls 181-250 EACH $2,091,500<br />

6004 [Orig] RB-M Cradle (as described in Section<br />

C.7)<br />

EACH $18,355<br />

6005 [Orig] Display Model (as described in C.8) EACH $17,357<br />

PRICE PERIOD SEVEN<br />

7001 [Orig] Project Management (as described in<br />

Section C.4). This CLIN is required<br />

whenever work, other than that<br />

associated with warranty administration,<br />

under 1002, 1009, 1010, x003, x004,<br />

x005, x006, x007, or x008 is ongoing.<br />

The Government may order any quantity<br />

of months under this CLIN provided that<br />

the performance period is limited to this<br />

price period.<br />

MONTH $521,467<br />

7002 [Orig] Vacant N/A __N/A___<br />

7003 [Orig] <strong>Response</strong> <strong>Boat</strong> - <strong>Medium</strong> (as described<br />

in Section C.6). Hulls refers to a range of<br />

total consecutive RB-Ms ordered under<br />

this contract (i.e. hull 9 cannot be ordered<br />

until hull 8 is ordered). The Government<br />

may order all or any part of this CLIN<br />

during this price period, provided that an<br />

individual hull may not be ordered more<br />

PART I, SECTION B, <strong>A00019</strong> Page 9 of 21 Supplies or Services and Prices


<strong>US</strong>CG <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> (RB-M)<br />

HSCG23-06-D-ARB001<br />

ITEM # SUPPLIES/ SERVICES UNIT PRICE<br />

than once under this contract.<br />

7003a [Orig] Hulls 7-8 EACH $2,423,893<br />

7003b [Orig] Hulls 9-20 EACH $2,378,524<br />

7003c [Orig] Hulls 21-36 EACH $2,360,911<br />

7003d [Orig] Hulls 37-66 EACH $2,323,046<br />

7003e [Orig] Hulls 67-96 EACH $2,310,121<br />

7003f [Orig] Hulls 97-126 EACH $2,312,134<br />

7003g [Orig] Hulls 127-156 EACH $1,987,131<br />

7003h [Orig] Hulls 157-180 EACH $2,038,564<br />

7003i [Orig] Hulls 181-250 EACH $2,091,500<br />

7004 [Orig] RB-M Cradle (as described in Section<br />

C.7)<br />

EACH $18,816<br />

7005 [Orig] Display Model (as described in C.8) EACH $17,792<br />

PRICE PERIOD EIGHT<br />

8001 [Orig] Project Management (as described in<br />

Section C.4). This CLIN is required<br />

whenever work, other than that<br />

associated with warranty administration,<br />

under 1002, 1009, 1010, x003, x004,<br />

x005, x006, x007, or x008 is ongoing.<br />

The Government may order any quantity<br />

of months under this CLIN provided that<br />

the performance period is limited to the<br />

date established in FAR 52.216-22,<br />

incorporated at I.1.<br />

MONTH $549,920<br />

8002 [Orig] Vacant N/A __N/A___<br />

8003 [Orig] <strong>Response</strong> <strong>Boat</strong> - <strong>Medium</strong> (as described<br />

in Section C.6). Hulls refers to a range of<br />

total consecutive RB-Ms ordered under<br />

this contract (i.e. hull 9 cannot be ordered<br />

until hull 8 is ordered). The Government<br />

may order all or any part of this CLIN<br />

during this price period, provided that an<br />

individual hull may not be ordered more<br />

than once under this contract.<br />

8003a [Orig] Hulls 7-8 EACH $2,520,472<br />

8003b [Orig] Hulls 9-20 EACH $2,458,513<br />

8003c [Orig] Hulls 21-36 EACH $2,397,483<br />

8003d [Orig] Hulls 37-66 EACH $2,363,072<br />

8003e [Orig] Hulls 67-96 EACH $2,350,363<br />

PART I, SECTION B, <strong>A00019</strong> Page 10 of 21 Supplies or Services and Prices


<strong>US</strong>CG <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> (RB-M)<br />

HSCG23-06-D-ARB001<br />

C.4 [Orig] PROJECT MANAGEMENT (CLIN 1001, 2001, 3001, 4001, 5001, 6001, 7001,<br />

8001)<br />

The Contractor shall provide project management in support of the requirements found<br />

in this contract, including providing the PRO Facilities described in section 087-1 of the<br />

Attachment 1 to Section J, the Statement of Work, and all time-based recurring data<br />

requirements found in Attachment 3 to Section J, the Contract Data Requirements List<br />

(CDRLs). This CLIN is required whenever work under 1002, x003, x004, x005, x006,<br />

x007, or x008 is ongoing.<br />

C.5 [A00003] DETAILED DESIGN OF RESPONSE BOAT - MEDIUM (CLIN 1002, 1009)<br />

The Contractor shall complete a detailed design of the <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong><br />

described in Attachment 2 to Section J, the Specification. The detailed design shall<br />

include developing and populating the Integrated Systems Model (ISM) described in<br />

section 041-5 of the Statement of Work, developing a configuration management system<br />

and the configuration baselines described in section 068-2 of the Statement of Work,<br />

developing mock-ups required by section 098-2 of the Statement of Work, conducting<br />

any additional testing required under section 092 and 097 of the Statement of Work,<br />

developing and providing the initial material required by section 099 of the Statement of<br />

Work, and developing and submitting all related data requirements found in the CDRLs.<br />

The scope of this item may include additional efforts associated with establishing project<br />

management and contract administration requirements found elsewhere in the<br />

solicitation. This CLIN must be ordered before orders for CLINs x003 (where x equals a<br />

price period) may be placed.<br />

C.5.1 [<strong>A00019</strong>] POST AWARD CHANGES OTHER THAN RESPONSE BOAT –<br />

MEDIUM DETAILED DESIGN OF (CLIN 1010)<br />

The Contractor shall perform work effort in accordance with Contract Changes<br />

incorporated and specified by the Contracting Officer.<br />

C.6 [Orig] RESPONSE BOAT - MEDIUM (CLIN 1003, 2003, 3003, 4003, 5003, 6003,<br />

7003, 8003)<br />

The Contractor shall construct the <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> in accordance with section<br />

070 of the Statement of Work, provide the Outfit described in section 6 of the<br />

Specification, provide all associated data deliverables required by the CDRLs, warrant<br />

the RB-M in accordance with FAR 52.246-19 incorporated at Section I.4, conduct tests<br />

and trials as described in section 092 of the Statement of Work, and prepare, transport,<br />

and deliver the RB-M in accordance with the section 084 of the Statement of Work, the<br />

instructions in the delivery order, and Sections E and F of the contract. The scope of<br />

this item may include those increased efforts in project management and contract<br />

administration associated with having multiple numbers of RB-M under production at the<br />

same time, if not allocated to CLIN x001, where x equals the price period.<br />

C.7 [Orig] CRADLE (CLIN 1004, 2004, 3004, 4004, 5004, 6004, 7004, 8004)<br />

The Contractor shall design and construct a cradle appropriate to lift, transport, and<br />

store the RB-M, in accordance with section 084 of the Specification, and prepare,<br />

transport and deliver the cradle in accordance with the instructions in the delivery order<br />

and Sections E and F of the contract.<br />

PART I, SECTION C, <strong>A00019</strong> Page 11 of 21 Description


<strong>US</strong>CG <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> (RB-M)<br />

HSCG23-06-D-ARB001<br />

Part I - The Schedule<br />

Section F - Deliveries or Performance<br />

F.1 [Orig] CLA<strong>US</strong>ES INCORPORATED BY REFERENCE (FAR 52.252-2) (FEB 1998)<br />

This contract incorporates one or more clauses by reference, with the same force and<br />

effect as if they were given in full text. Upon request, the Contracting Officer will make<br />

their full text available. Also, the full text of a clause may be accessed electronically at<br />

this/these address(es):<br />

http://www.arnet.gov/far/<br />

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)<br />

NUMBER TITLE (DATE)<br />

52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)<br />

52.242-15 STOP-WORK ORDER (AUG 1989)<br />

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)<br />

52.247-34 F.O.B. DESTINATION (NOV 1991)<br />

52.247-55 F.O.B. POINT FOR DELIVERY OF GOVERNMENT FURNISHED<br />

PROPERTY (JUN 2003)<br />

F.2 [Orig] DESIRED AND REQUIRED TIME OF DELIVERY<br />

F.2.1. [Orig] Reserved.<br />

F.2.2. [<strong>A00019</strong>]<br />

REQUIRED DELIVERY SCHEDULE<br />

ITEM NAME PERFORMANCE/DELIVERY PERIOD<br />

x001 Project Management To begin immediately upon receipt of a<br />

Delivery Order or at the conclusion of the<br />

last quantity ordered under any previous<br />

Delivery Orders, whichever is later, and to<br />

conclude at the end of that same calendar<br />

month. First period may be an incomplete<br />

month.<br />

1002 RBM Detailed Design Phased Detailed Design, as described in<br />

068-3 of Section J Attachment 1, the<br />

Statement of Work, must be completed in<br />

time to meet the delivery schedule<br />

requirements for the first RB-M, CLIN x003.<br />

Data deliverables must be delivered IAW<br />

Section J Attachment 3, Contract Data<br />

Requirements List. Final delivery of the<br />

ISM, as described in 041-5 of Section J<br />

Attachment 1, the Statement of Work, must<br />

PART I, SECTION F, <strong>A00019</strong> Page 12 of 21 Deliveries or Performance


<strong>US</strong>CG <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> (RB-M)<br />

HSCG23-06-D-ARB001<br />

1009 Post Award Changes to<br />

RB-M Detailed Design<br />

1010 Post Award Changes to<br />

RB-M Other Than<br />

Detailed Design<br />

be completed by the end of the<br />

performance period.<br />

In accordance with Performance/Delivery<br />

Period described for CLIN 1002 above.<br />

Within the response requirements<br />

identified in the Change.<br />

x003 <strong>Response</strong> <strong>Boat</strong> - <strong>Medium</strong> In accordance with the approved IMS<br />

required by Section 041-9 of Attachment 1<br />

to Section J, Statement of Work, but, for the<br />

first RB-M and the first RB-M following a<br />

“break in production” defined in the<br />

approved IMS, not later than 270 days after<br />

the effective date of the Delivery Order,<br />

and, for subsequent RB-Ms, not later than<br />

the number of days after the delivery of the<br />

preceding RB-M needed to maintain a<br />

steady rate to deliver the estimated quantity<br />

identified in B.3 within one year, unless<br />

otherwise agreed to in the IMS.<br />

x004 RB-M Cradle Within 120 days of receipt of a Delivery<br />

Order for the first cradle and, for<br />

subsequent cradles, within 30 days of the<br />

delivery of the preceding model or the<br />

receipt of another Delivery Order,<br />

whichever is later.<br />

x005 Display Model Within 180 days of receipt of the Delivery<br />

Order for the first model and, for<br />

subsequent models, within 120 days of the<br />

delivery of the preceding model or the<br />

receipt of another Delivery Order,<br />

whichever is later.<br />

x006<br />

x007<br />

2009<br />

Technical<br />

Advice/Support<br />

Technical Service<br />

Within the response requirements identified<br />

in Section 080-2 of the Statement of Work,<br />

or as identified in the Task Order,<br />

whichever is later.<br />

Within the response requirements identified<br />

in Section 080-2 of the Statement of Work,<br />

or as identified in the Task Order,<br />

whichever is later.<br />

x008 Spare/Repair Parts Within the response requirements identified<br />

in Section 080-2 of the Statement of Work,<br />

or as identified in the Task Order,<br />

whichever is later.<br />

The Government may exercise options in accordance with FAR clauses 52.217-8<br />

and 52.217-9.<br />

PART I, SECTION F, <strong>A00019</strong> Page 13 of 21 Deliveries or Performance


<strong>US</strong>CG <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> (RB-M)<br />

HSCG23-06-D-ARB001<br />

G.3.1.3.<br />

G.3.1.4.<br />

G.3.1.5.<br />

G.3.2.<br />

G.3.3.<br />

G.3.3.1.<br />

G.3.3.2.<br />

G.3.3.3.<br />

G.3.3.4.<br />

G.3.3.4.1.<br />

for contract financing payment for it to constitute a proper request for contract<br />

payment.<br />

[Orig] Invoices shall be broken down by CLIN and sub-CLIN. Invoices<br />

containing CLIN x003 shall be further broken down by RB-M hull number.<br />

[Orig] Cost-based invoices shall be certified by the Contractor with regards to the<br />

allowable and allocable costs incurred in the performance of the work as of the<br />

last day of the invoice period.<br />

[Orig] An original and two (2) information copies shall be submitted to the Project<br />

Resident Office. Failure to submit directly to this office will delay payment.<br />

[<strong>A00019</strong>] Prompt Payment CLINs 1009, 1010, x004 and x005 (where x equals the<br />

price period). In addition to the general requirements above and the requirements of<br />

FAR 52.232-25, Prompt Payment, incorporated at Section I.1, includes evidence of<br />

Government acceptance for CLINs x004 and x005 and evidence of progress for<br />

CLINs 1009 and 1010. For the final Invoice of CLINs 1009 and 1010, provide<br />

evidence of acceptance.<br />

[Orig] Performance-Based Payments CLINs 1002 and x003 (where x equals the<br />

price period). In keeping with the requirements of the FAR clause 52.232-32,<br />

"Performance-Based Payments", incorporated at Section I.2, include approved<br />

Budgeted Cost for Work Performed (BCWP) Earned Value Management System<br />

(EVMS) reporting information in support of the request for payment or contract<br />

financing.<br />

[Orig] No payment will be required to be made upon invoices aggregating less<br />

than five thousand dollars ($5,000).<br />

[Orig] Computation of amounts. The Contractor shall not be entitled to payment<br />

of a request for performance-based payment prior to Contracting Officer’s<br />

acceptance of all components of the evidence/basis of payment for a milestone<br />

identified in paragraph G.4. Unless the Contractor requests a smaller amount,<br />

the Government will compute each performance-based payment as 90 percent of<br />

the value of the completed milestones identified in paragraph G.4, less the sum<br />

of all previous performance payments made by the Government under this<br />

contract. Any amount computed as earned but not paid is defined as retention.<br />

[Orig] Liquidation. Except as provided in the Termination for Convenience of the<br />

Government clause, all performance-based payments shall be liquidated by<br />

deducting from any payment under this contract the unliquidated performancebased<br />

payments, or 90 percent of the amount invoiced, whichever is less. The<br />

Contractor shall repay to the Government any amounts required by a retroactive<br />

price reduction, after computing liquidations and payments on past invoices at<br />

the reduced prices and adjusting the unliquidated performance-based payments<br />

accordingly. The Government reserves the right to unilaterally change from the<br />

ordinary liquidation rate to an alternate rate when deemed appropriate for proper<br />

contract financing.<br />

[Orig] Retention. Unless otherwise determined by the Contracting Officer, the<br />

Government will:<br />

[Orig] For CLIN 1002, at the end of six months after acceptance of all<br />

components of the evidence/basis of payment for a milestone identified in<br />

paragraph G.4, pay the retention for that milestone.<br />

PART I, SECTION G, <strong>A00019</strong> Page 14 of 21 Contract Administration Data


<strong>US</strong>CG <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> (RB-M)<br />

HSCG23-06-D-ARB001<br />

068-2.2 [Orig] Configuration Baselines<br />

068-2.2.1 [Orig] The Functional Configuration Baseline (FCB) consists of the RB-M’s<br />

technical, mission, operational (including availability) and functional<br />

requirements, interoperability and interface characteristics, and design<br />

constraints as contained in the RB-M Contract and those specific items or<br />

capabilities that the contractor offered and were included in the contract. The<br />

FCB will be established at contract award.<br />

068-2.2.2 [Orig] The Allocated Configuration Baseline (ACB) formally breaks out the<br />

functional requirements identified in the FCB into more detailed functional<br />

requirements and interface characteristics that are allocated from those of the<br />

higher level Configuration Item (CI) for the System and major subsystems.<br />

The ACB shall represent the performance-oriented requirements from the<br />

FCB, how the contractor allocates their design characteristics to these<br />

performance-oriented requirements, and the verification required to<br />

demonstrate achievement of those specified characteristics. The contractor<br />

shall prepare the ACB in accordance with CDRL 068-003. The ACB is<br />

established when the deliverable has been approved by the Contracting<br />

Officer.<br />

068-2.2.3 [Orig] The Development Configuration Baseline (DCB) represents the<br />

approved “build to” technical data package for the initial RB-Ms. The technical<br />

data package includes all the information that defines the configuration of the<br />

RB-M. The DCB will be established, in phases, as a result of a detailed<br />

design review of the technical data package by CG personnel. When the<br />

Contracting Officer has approved a deliverable, its contents become part of<br />

the DCB. The DCB is established when all deliverables associated with the<br />

detailed design review, paragraph 068-3, have been approved.<br />

068-2.2.4 [<strong>A00019</strong>] A preliminary Product Configuration Baseline (p-PCB) will be<br />

established upon approval of a Physical Configuration Audit (PCA) on the<br />

RB-M designated by the Contracting Officer for the first PCA.<br />

068-2.2.5 [Orig] A finalized Product Configuration Baseline (PCB) will be established<br />

upon approval of a Physical Configuration Audit (PCA) on the RB-M<br />

designated by the Contracting Officer as the first production boat.<br />

068-2.2.6 [Orig] Physical Configuration Audit (PCA). The Government will conduct a<br />

Physical Configuration Audit of the technical data as the last phase of the<br />

Preliminary Acceptance Trials on the first RB-M, and again on the RB-M<br />

designated by the Contracting Officer as the first production boat. PAT is not<br />

complete for these boats until all discrepancies resulting from the PCA have<br />

been resolved to the satisfaction of the Contracting Officer. The contractor<br />

shall make provisions for and support this effort, which is expected to last two<br />

calendar weeks. Minimum provisions for the audit include staging the boat out<br />

of water and sheltered from the weather, with an adjacent enclosed area large<br />

enough for at least two full size Validation Drawings to be laid out for review<br />

and marking. The contractor shall make the material storage area (parts /<br />

storeroom) available to the Government representatives in order that material,<br />

components and equipment can be validated prior to installation in the<br />

remaining boats. The contractor shall provide personnel, as required, to<br />

resolve questions arising during the review and to demonstrate equipment<br />

operation, maintenance accessibility, removal and installation. The contractor<br />

shall record the minutes of the audit and report the results in accordance with<br />

PART III, SECTION J, Attachment 1, <strong>A00019</strong> Page 15 of 21 STATEMENT OF WORK


<strong>US</strong>CG <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> (RB-M)<br />

HSCG23-06-D-ARB001<br />

normally be permitted due to the effect they would have on operational<br />

availability.<br />

080-2.3.3 [Orig] Correction of Defects – On the occasions that the Contracting Officer<br />

makes a warranty claim upon the initial receipt of a support request, the<br />

contractor shall correct the defects in accordance with contract requirements<br />

and the following response times:<br />

080-2.3.3.1 [Orig] contractor repair of defects, inclusive of all necessary parts and<br />

supplies, shall be completed within 72 hours of notification.<br />

080-2.3.3.2 [Orig] if replacement parts for stock are necessary, they shall be received<br />

by the operational unit within 72 hours of notification.<br />

080-2.3.3.3 [Orig] if only repair parts are necessary, they shall be shipped by the end<br />

of the following day, exclusive of Sunday and Federal Holidays, utilizing<br />

next day delivery.<br />

080-2.3.3.4 [Orig] if over the phone technical support is necessary, it shall be<br />

performed by a technical expert who has demonstrated technical<br />

expertise in repair of the equipment that is the subject of the request. The<br />

technical support shall be completed within 4 hours of notification,<br />

provided notification is received during the contractor’s normal working<br />

hours. If notification is received after normal working hours, completion<br />

shall be prior to noon the following day.<br />

080-2.3.4 [Orig] If the contractor is unable to meet the required response time, he shall<br />

provide written notification to the Contracting Officer requesting an extension<br />

of time. If the Contracting Officer approves the request a written approval will<br />

be provided with a new response deadline.<br />

080-2.3.5 [<strong>A00019</strong>] Minor Defects - In cases where a defect is categorized as a “minor<br />

defect”, the <strong>Coast</strong> <strong>Guard</strong> may affect repairs prior to warranty determination<br />

and without notification to the Contractor. “Minor Defect” means a defect<br />

that can be corrected by Unit level <strong>Coast</strong> <strong>Guard</strong> personnel without<br />

requiring OEM certification, purchase of special tools, or use of<br />

unavailable facilities AND that will not void any OEM or builder’s<br />

warranty. Typically this includes removal and replacement of<br />

components, troubleshooting, or minor adjustments while the vessel<br />

remains in the water. Upon correction of the defect the Contracting<br />

Officer shall provide written notification to the contractor detailing the<br />

corrective action and the contractor shall provide replacement parts in<br />

accordance with this section. The Contractor shall provide the<br />

Government with a list of all work items considered as “major defects”<br />

(CDRL 080-005). When <strong>Coast</strong> <strong>Guard</strong> personnel, for operational or other<br />

reasons, perform corrective maintenance for items on this list without<br />

first contacting the Field Support Desk, the Government and Contractor<br />

shall jointly determine any potential impacts to the warranty.<br />

080-2.3.6 [Orig] For warranty services physically performed OCON<strong>US</strong> (defined as<br />

locations outside of the continental United States), the provisions of 080-2.1.2<br />

may be required, at the discretion of the Contracting Officer. The Government<br />

will be responsible and provide payment for the increased costs associated<br />

with the difference in OCON<strong>US</strong> performance location(s) and the original<br />

CON<strong>US</strong> (defined as within the contiguous continental United States) delivery<br />

and acceptance location.<br />

PART III, SECTION J, Attachment 1, <strong>A00019</strong> Page 16 of 21 STATEMENT OF WORK


<strong>US</strong>CG <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> (RB-M)<br />

HSCG23-06-D-ARB001<br />

including all the components that are exterior of the craft. The mock-up shall be<br />

outfitted with the actual shafts.<br />

098-2.9 [A00003] Exterior Main Deck. The government will use the exterior main deck<br />

mock-up to demonstrate the functionality of arrangements for towing operations,<br />

staging of boarding teams, weapons firing evolutions, and man overboard<br />

retrievals. Actual hatches shall be provided for the forepeak, lazarette, auxiliary<br />

machinery space, survivor’s compartment escape, and the engine room.<br />

099 [Orig] PHOTOGRAPHS<br />

099-1 [Orig] Photographs<br />

099-1.1 [Orig] The contractor shall provide digital color images of the RB-M during the<br />

production process, in accordance with CDRL 099-001. The digital images shall<br />

be the property of the Government.<br />

099-2 [Orig] Public Relations Displays<br />

099-2.1 [Orig] The contractor shall develop, prepare, and provide media showcasing the<br />

<strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> for display at trade shows and conferences, such as the<br />

<strong>US</strong>CG Innovation Expo, the NAVSEA Warfare Center Multi-Agency Craft<br />

Conference (MACC), and the International <strong>Boat</strong>Builders’ Exhibition and<br />

Conference (IBEX). The media, artwork, layout, text, and digital files associated<br />

with creating and producing the media shall be the property of the Government.<br />

The media shall be compatible with portable displays typically authorized for use at<br />

these types of events, and shall be mountable on a standard 10’ fabric popup<br />

display. Initial media shall be developed as a part of CLIN 1002, Detailed Design,<br />

and be ready for use during the trades shows schedule for the spring of 2006.<br />

Subsequent requirements for revised or updated media, and requests to showcase<br />

the media on behalf of the <strong>Coast</strong> <strong>Guard</strong>, may be the subject of a task order under<br />

CLIN x006, Technical Support, or CLIN x007, Technical Service, as appropriate.<br />

099-2.2 [<strong>A00019</strong>] The Contractor shall package, ship, and display a Contractor<br />

owned RB-M Display Model on behalf of the <strong>Coast</strong> <strong>Guard</strong> at the 2007 <strong>US</strong>CG<br />

Innovation Expo in New Orleans.<br />

099-3 [Orig] Brochures<br />

099-3.1 [Orig] The contractor shall develop, prepare, and provide 8 ½” x 11” double-sided<br />

glossy brochures suitable for public relations efforts. The brochures shall include<br />

an underway photo of the <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> on one side, and descriptive<br />

information of the RB-M, its mission, and principal technical characteristics on the<br />

reverse. The artwork, layout, text, and digital files associated with creating and<br />

producing the brochures shall be the property of the Government. 500 initial<br />

brochures shall be developed and delivered as part of CLIN 1002, Detailed Design,<br />

and be ready for distribution in conjunction with the trade shows scheduled for the<br />

spring of 2006. Subsequent requirements for additional quantities, or revised or<br />

updated brochures, may be the subject of a task order under CLIN x006, Technical<br />

Support.<br />

099-3.2 [Orig] The contractor shall develop, prepare, and provide 8 ½” x 11” double-sided<br />

glossy tri-fold brochures publicizing the <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong>, its mission, and<br />

capabilities. The artwork, layout, text, and digital files associated with creating and<br />

producing the brochures shall be the property of the Government. 500 initial tri-<br />

PART III, SECTION J, Attachment 1, <strong>A00019</strong> Page 17 of 21 STATEMENT OF WORK


<strong>US</strong>CG <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> (RB-M)<br />

HSCG23-06-D-ARB001<br />

099-4 [Orig] Video<br />

fold brochures shall be developed and delivered as part of CLIN 1002, Detailed<br />

Design, and be ready for distribution in conjunction with the trade shows scheduled<br />

for the spring of 2006. Subsequent requirements for additional quantities, or<br />

revised or updated brochures, may be the subject of a task order under CLIN x006,<br />

Technical Support.<br />

099-4.1 [Orig] The contractor shall develop, prepare, and provide a video, showcasing the<br />

<strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> performance and functionality. The video shall also<br />

document the project history, including footage that shows the capability of the 41’<br />

Utility <strong>Boat</strong> and the <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong>, highlighting the increased<br />

capabilities.<br />

099-4.2 [Orig] The initial video shall be developed and delivered as part of CLIN 1002,<br />

Detailed Design, and cover the period of time from contract award until the delivery<br />

of the first RB-M. An abbreviated, three to five minute promotional video<br />

suitable for use in showcasing the progressive design development process<br />

being used on the RB-M (particularly the test boat, the 3D Technical Data<br />

Package, the mock-up, and the IETP, and how these combine to produce an<br />

design that reduces overall risk to performance, schedule, and cost) shall be<br />

due as early in the design process as is practicable, but not later than the<br />

final design review. Subsequent requirements for additional videos, or revised or<br />

updated videos, may be the subject of a task order under CLIN x006, Technical<br />

Support, or CLIN x007, Technical Service, as appropriate.<br />

099-4.3 [Orig] Prior to beginning production of the video, the Contractor shall prepare and<br />

deliver for Government review and approval a draft storyboard and script depicting<br />

the concept and describing the intended production. Allow thirty days for<br />

Government response. If not approved, the Contractor shall revise the storyboard<br />

and script based on Government comments and resubmit it for approval.<br />

099-4.4 [Orig] The video shall be produced according to the approved storyboard and<br />

script using BetacamSp or DVcam format.<br />

099-4.4.1 [Orig] A draft version of the video shall be delivered via the IPDE for<br />

Government review and approval. Allow thirty days for Government response.<br />

If not approved, the Contractor shall revise the draft video based on<br />

Government comments and resubmit it for approval.<br />

099-4.4.2 [Orig] Upon approval of the final version of the video, the Contractor shall<br />

distribute the video as follows:<br />

099-4.4.2.1 [Orig] Provide one copy of the video in .mpg file format, delivered via the<br />

IPDE.<br />

099-4.4.2.2 [Orig] Provide one copy of the video in .mov file format, delivered via the<br />

IPDE.<br />

099-4.4.2.3 [<strong>A00019</strong>] Reserved.<br />

099-4.4.2.4 [<strong>A00019</strong>] Provide eight copies of the video on DVD media, delivered to<br />

the PRO.<br />

099-4.4.2.5 [Orig] Provide one copy of all raw film footage on DVD media, delivered<br />

to the PRO.<br />

PART III, SECTION J, Attachment 1, <strong>A00019</strong> Page 18 of 21 STATEMENT OF WORK


<strong>US</strong>CG <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> (RB-M)<br />

HSCG23-06-D-ARB001<br />

320-6 [Orig] Over-current Protection<br />

320-6.1 [Orig] The RB-M shall have over-current and short circuit protective devices for all<br />

electrical power distribution circuits. Circuit breakers shall be used in lieu of fuses<br />

for primary circuit protection. As a minimum, double-pole circuit breakers shall be<br />

used for the main AC shore power breaker and the main breaker provided at each<br />

24 VDC, 12 VDC or 120 VAC distribution panel. Circuit breakers shall be of the<br />

18mm mini-breaker thermal magnetic type and shall be DIN rail mounted within the<br />

enclosure. Circuit breakers shall be UL approved and designed to withstand the<br />

marine environment.<br />

320-7 [Orig] Shore Power Facility<br />

320-7.1 [Orig] A shore power system shall be provided to supply the craft 120 VAC<br />

distribution system when pierside. Electrical service available at the pier will be<br />

120 VAC, single phase, 60 Hz, 100 amps, three wire.<br />

320-7.2 [Orig] The shore power system shall be installed in accordance with ABYC E-11,<br />

Diagram No. 6 or 7. The craft shall have a 100-amp shore power inlet receptacle,<br />

Hubbell catalog number M4100B12R or equal, electrically insulated from the boat<br />

and centrally-mounted to facilitate shore power connection from either side. The<br />

receptacle shall have a cover. The shore power inlet shall feed the craft 120 VAC<br />

distribution system via an isolation transformer (Section 314-1) and double-pole<br />

shore power circuit breaker.<br />

320-7.3 [Orig] A portable cable shall be provided to connect the craft’s shore power inlet<br />

receptacle to the pier station. Portable shore power cable shall be 50 feet in length<br />

and rated for 100 Amps. The shore power cable shall be an oil and moisture<br />

resistant, flexible, portable shore power cable with a reinforced jacket designed for<br />

withstanding heavy abuse. The cable shall have Midland Ross/Russelstoll p/n JPS<br />

1023H plug or equal on the pier end. The plug on the boat end shall be a Hubbel<br />

Inc., catalog number M4100C12R or equal. In this 120V application the plug shall<br />

be wired with the following color code: black for power, white for neutral, green for<br />

ground, red unused. Onboard storage for this cable is not required.<br />

320-8 [Orig] Portable Equipment Power Outlets<br />

320-8.1 [<strong>A00019</strong>] The RB-M shall be provided with four 12 VDC watertight<br />

auxiliary/accessory power outlets. One shall be provided adjacent to each of the<br />

following locations: the navigator, crew and alternate crew seats; and the galley. If<br />

cigarette style outlets are not provided, a pigtail cable shall be provided for each<br />

outlet to adapt a standard cigarette lighter-style connector to the outlet mating plug.<br />

If required, stowage shall be provided for outlet pigtail cables.<br />

320-8.2 [Orig] The RB-M shall have two 120 VAC GFCI watertight duplex marine grade<br />

outlets, one each in the engine space and in the pilothouse. These outlets shall be<br />

on a 15 amp circuit that is not shared with any other outfit item such as the<br />

microwave.<br />

PART III, SECTION J, ATTACHMENT 2, <strong>A00019</strong> Page 19 of 21 SPECIFICATION


<strong>US</strong>CG <strong>Response</strong> <strong>Boat</strong> – <strong>Medium</strong> (RB-M)<br />

HSCG23-06-D-ARB001<br />

633 [Orig] CATHODIC PROTECTION<br />

633-1 [Orig] Sacrificial Anodes<br />

633-1.1 [Orig] The RB-M shall have sacrificial anodes for cathodic protection installed in<br />

accordance with ABYC Project E-2, Cathodic Protection, for a salt water<br />

environment.<br />

634 [Orig] DECK COVERING<br />

634-1 [Orig] General<br />

634-1.1 [<strong>A00019</strong>] All exterior decks shall be provided with non-skid surface that shall be<br />

3M Safety Walk Coarse 770 (color: Deck Grey).<br />

634-1.2 [A00014] All interior pilothouse and passenger compartment decks shall be<br />

provided with non-skid surface that shall be 3M Safety Walk Coarse 770 (color:<br />

Deck Grey).<br />

634-1.3 [A00014] Interior machinery space decks shall be serrated grating provided with<br />

quick release removable (without tools) panels, except for the engine room, which<br />

shall be exempt from the serrated grating requirement. The Contractor shall apply<br />

3M Safety-Walk Course Tread 770 (color: Deck Grey) to the engine room<br />

deck. Grating must remain secure in all operating conditions stated in Section<br />

044-2 and have no side to side movement when being walked on.<br />

634-1.4 [A00014] Areas that will be used as steps during routine operations or<br />

maintenance shall be provided with a non-skid surface that shall be 3M Safety<br />

Walk Coarse 770 (color: Deck Grey).<br />

635 [Orig] THERMAL INSULATION AND ACO<strong>US</strong>TIC ABSORPTIVE TREATMENT<br />

635-1 [Orig] General<br />

635-1.1 [Orig] Insulation shall be selected to provide the thermal and acoustic properties<br />

necessary to meet the requirements of this specification with the minimum practical<br />

weight and maximum practical resistance to damage from water, vibration and<br />

other causes throughout the boat’s service life.<br />

635-1.2 [Orig] Insulation shall be installed over watertight boundaries only after all<br />

specified tightness tests have been completed.<br />

635-1.3 [Orig] Fastenings shall not crush or otherwise reduce the insulating value of the<br />

insulation.<br />

635-1.4 [Orig] Vapor barriers shall be applied to all insulation as necessary to prevent<br />

penetration of moisture, shall remain intact and continuous over the area protected<br />

by means of sealed joints and edges and shall not have any holes or voids in any<br />

single coat of vapor barrier coating.<br />

635-1.5 [Orig] Insulation shall be installed in such a way to prevent damage from water<br />

absorption or physical damage, including installation of sheathing as necessary to<br />

protect the insulation.<br />

PART III, SECTION J, ATTACHMENT 2, <strong>A00019</strong> Page 20 of 21 SPECIFICATION


Modification Request CDRL 080-005- Minor Defects<br />

RESPONSE BOAT - MEDIUM SYSTEM<br />

CONTRACT DATA REQUIREMENTS LIST<br />

CONTRACT NO: HSCG23-06-D-ARB001 (See Section J - SOW 041-2)<br />

BLK01-SEQUENCE NO.: 080-005 (<strong>A00019</strong>)<br />

BLK03-SUBTITLE:<br />

BLK04-AUTHORITY:<br />

BLK05-CONTRACT REF:<br />

BLK07-DD 250<br />

REQUIRED:<br />

Major Defects List<br />

Technical Report - Study/Services (DI-MISC-80508A)<br />

SOW 080-2.3.5<br />

LT<br />

BLK08-APP CODE:<br />

BLK09-DIST STMT REQD: F<br />

BLK10-FREQUENCY:<br />

BLK12-DATE OF 1ST<br />

SUBM:<br />

ASREQ<br />

10 DAPAT<br />

BLK13-DATE OF SUBS<br />

SUBM:<br />

BLK14-DISTRIBUTION:<br />

BLK15-TOTAL:<br />

BLK16-REMARKS:<br />

Electronic Copy: IPDE Hard Copies: None<br />

Electronic Copy: Yes<br />

Hard Copies: 0<br />

BLK04: No modification to DID.<br />

BLK10: See SOW 080-2.3.<br />

ATTACHMENTS:<br />

None<br />

<strong>A00019</strong> Page 21 of 21