North Bethany Stormwater Implementation Plan
North Bethany Stormwater Implementation Plan
North Bethany Stormwater Implementation Plan
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>North</strong> <strong>Bethany</strong> Area<br />
Storm <strong>Implementation</strong> <strong>Plan</strong><br />
Jadene Torrent Stensland, PE<br />
Senior Engineer<br />
Water Resources<br />
Jadene Torrent Stensland, PE<br />
Senior Water Resources Engineer
OBJECTIVES<br />
• BACKGROUND<br />
• HISTORY<br />
• DRAINAGE MASTER PLAN<br />
• IMPLEMENTATION PLAN<br />
• DESIGNS<br />
• LIDA REDUCTIONS<br />
• COST ESTIMATES
BACKGROUND<br />
• Clean Water Services<br />
• Washington County Special Service District<br />
• Over 40 years of service<br />
• Urban Sanitary and <strong>Stormwater</strong> Management<br />
• Natural Resource Management<br />
• Serve population 527,000+ residents
BACKGROUND<br />
• <strong>North</strong> <strong>Bethany</strong> Sub Area<br />
• <strong>Plan</strong>ning began over 10 years ago<br />
• 800 acres, rural and ag<br />
• 458 developable acres<br />
• 3650 – 4750 new dwelling units<br />
• Area of Distinction<br />
Sustainability<br />
Parks and Trails<br />
Utilities <strong>Plan</strong>ning
<strong>North</strong> <strong>Bethany</strong> Area Map
History<br />
• Drainage Master <strong>Plan</strong><br />
• Complete in December 2010<br />
• Concept <strong>Plan</strong>ning Document<br />
Design Criteria<br />
Storm System concept layout<br />
Preliminary Cost Estimates
Linear Storm Water System and Trails<br />
Otak 2010 DMP<br />
Greenworks 2009 Sketch
<strong>Implementation</strong> <strong>Plan</strong><br />
• <strong>North</strong> <strong>Bethany</strong> <strong>Implementation</strong> <strong>Plan</strong><br />
• Regional Facilities<br />
• Major Conveyance System<br />
• 30% Designs<br />
• Cost Estimates
Regional Facility Sizing<br />
Facility Concepts<br />
1. Conventional Extended Dry Basin (round design)<br />
2. Linear Extended Dry Basin (cascade design)<br />
3. <strong>Implementation</strong> Options for Upstream LIDA
Conventional Extended Dry Basin<br />
Regional <strong>Stormwater</strong> Facility Design Criteria<br />
Design Criteria*<br />
District<br />
Maximum Depth<br />
4.0 feet<br />
Maximum Ponding Depth<br />
3.0 feet<br />
Freeboard<br />
1.0 feet<br />
Amended Soils<br />
1.0 feet<br />
Side Slopes (in treatment area) (H:V) 3:1<br />
Overflow (Y/N)<br />
Y<br />
Native <strong>Plan</strong>tings<br />
Y<br />
Fencing<br />
Y<br />
* Locate facilities outside of the<br />
stream and vegetated corridor<br />
(vc).<br />
Extended Dry Basin
Facility Design Alternatives<br />
Conventional Extended Dry Basin
Linear Extended Dry Basin<br />
Regional <strong>Stormwater</strong> Facility Design Criteria<br />
Design Criteria<br />
Value<br />
Maximum Depth<br />
4.0 feet<br />
Maximum Ponding Depth<br />
3.0 feet<br />
Freeboard<br />
1.0 feet<br />
Amended Soils<br />
1.0 feet<br />
Minimum Bottom Width<br />
8 feet<br />
Side Slopes (in treatment area) (H:V) 3:1<br />
Bottom Slope 0.5%<br />
Overflow (Y/N)<br />
Y<br />
Native <strong>Plan</strong>tings<br />
Y<br />
Fencing<br />
Y
Cascade Storm Water System<br />
Otak 2010 DMP<br />
Greenworks 2009 Sketch
Facility Design Alternatives<br />
Linear Extended Dry Basin Example (cascade)
Facility Design Alternatives<br />
Linear Extended Dry Basin Example (cascade)
3. Credit for Upstream LIDA<br />
Areas Where Site LIDA is Required
3. Credit for Upstream LIDA<br />
Assumptions for LIDA
2<br />
3. Credit for Upstream LIDA<br />
Impact to Regional Facility Size<br />
1. Regional Facility Only (No LIDA)<br />
2. LIDA Swale (Mandatory LIDA Areas Only)<br />
3. LIDA <strong>Plan</strong>ter Current Requirements (Mandatory LIDA Areas Only)<br />
4. LIDA <strong>Plan</strong>ter With Deeper Growing Medium (Mandatory LIDA<br />
Areas Only)<br />
5. LIDA <strong>Plan</strong>ter with Orifice to Meet Hydromod Stds. (Mandatory LIDA<br />
Areas Only)<br />
6. LIDA <strong>Plan</strong>ter Current Requirements (100% LIDA)<br />
7. LIDA <strong>Plan</strong>ter with Orifice to Meet Hydromod Stds. (100% LIDA)<br />
10000 15000 20000 25000 30000 35000 40000<br />
Regional Facility Surface Area (sq-ft)
2<br />
3. Credit for Upstream LIDA<br />
Regional Facility Sizing Reduction Factors<br />
Round Extended Detention Facility<br />
Subbasin<br />
BT3<br />
BT2 and BT3<br />
Impervious Area Treated<br />
by Mandatory LIDA<br />
(acres)<br />
Facility Size (ft2)<br />
0 20,146<br />
7.0 16,074<br />
0<br />
45,705<br />
11.0<br />
39,611<br />
Facility Area<br />
Reduction/Impervious Acre<br />
Treated by LIDA (ft2)<br />
582<br />
554<br />
Linear Detention Facility<br />
Subbasin<br />
BT3<br />
BT4<br />
Impervious Area Treated<br />
by Mandatory LIDA<br />
(acres)<br />
Facility Size (ft2)<br />
0 28,758<br />
7 25,800<br />
0 4,816<br />
3.4 3,440<br />
Facility Area<br />
Reduction/Impervious Acre<br />
Treated by LIDA (ft2)<br />
423<br />
406
3. Credit for Upstream LIDA<br />
Sizing Reduction Factors<br />
Facility<br />
ID<br />
Subbasin<br />
name<br />
Total<br />
contributing<br />
area,<br />
acres<br />
Impervious<br />
area,<br />
acres<br />
RSF top area<br />
at 4-foot<br />
depth,<br />
sq ft<br />
RSF top area<br />
50% <strong>Implementation</strong> of<br />
LIDA<br />
sq ft<br />
RSF top area<br />
100% <strong>Implementation</strong> of<br />
LIDA<br />
sq ft<br />
1 AB1 34.7 18.4 33,024 30,261 27,499<br />
2 AB2 32.0 17.8 19,772 16,265 12,759<br />
3 AB4 42.1 21.0 25,613 21,441 17,268<br />
4 AB6 29.9 14.3 25,800 23,965 22,130<br />
5 AB8 33.3 22.4 15,612 13,690 11,767<br />
6 AB9 59.8 40.1 22,708 18,932 15,155<br />
7 AB10 19.4 10.2 15,480 13,692 11,905<br />
8 AB11 33.7 16.8 33,540 30,352 27,164<br />
9 AB12 28.4 14.7 25,800 23,855 21,909<br />
10<br />
BT2 & BT3<br />
combined<br />
46.5 28.0 39,611 35,316 31,021<br />
11a BT3 26.8 16.4 16,074 13,663 11,252<br />
11b BT3 26.8 16.4 25,800 24,046 22,293<br />
12 BT4 14.9 6.8 3,440 2,749 2,058<br />
13 BT5 7.3 5.0 4,472 4,092 3,712<br />
14 BT6 16.4 8.5 5,848 4,448 3,048<br />
15 BT8 9.4 4.6 3,096 2,297 1,498<br />
16 RU3 71.3 37.7 44,340 35,617 26,894<br />
17 RU5 29.8 18.6 19,850 16,975 14,100
4. Analysis of Alternative LIDA<br />
Configurations<br />
2
2<br />
LIDA<br />
Configuration<br />
4. Analysis of Alternative LIDA<br />
Configurations<br />
LIDA <strong>Plan</strong>ter as<br />
Shown in the<br />
Manual<br />
LIDA <strong>Plan</strong>ter<br />
Plus Additional<br />
Growing Media<br />
LIDA <strong>Plan</strong>ter<br />
Plus Additional<br />
Ponding<br />
LIDA <strong>Plan</strong>ter Plus<br />
Ponding and<br />
Growing Media and<br />
Unlined<br />
LIDA <strong>Plan</strong>ter<br />
Plus Growing<br />
Media and<br />
Unlined<br />
LIDA <strong>Plan</strong>ter<br />
Plus Ponding<br />
and Growing<br />
Media and Dead<br />
Storage and<br />
Unlined<br />
LIDA <strong>Plan</strong>ter<br />
Plus Ponding<br />
and Growing<br />
Media and No<br />
Underdrain and<br />
Unlined<br />
Max Ponding<br />
Depth (in) 6 6 12 12 6 12 12<br />
Growing Media<br />
Depth (in) 18 24 18 24 30 30 30<br />
Drain Rock Layer<br />
Depth (in) 12 12 12 12 12 15 12<br />
Dead Storage (in) 3 3 3 3 3 6 12<br />
Lined Yes Yes Yes No No No No<br />
INFILT Value for<br />
Facility (in/hr) NA NA NA 0.2 0.2 0.2 0.2<br />
Sizing Factor<br />
(%Impervious<br />
Area) 31.5% 12% 16.5% 8.5% 7.25% 6.75% 6.4%<br />
Total Facility<br />
Depth (ft) 3.17 3.67 3.67 4.17 4.17 4.92 4.67
5. Results - Overview of Regional<br />
Facility Layout
5. Results<br />
• Required design elements:<br />
• Must meet District D&C Standards.<br />
• Footprint must match preliminary design.<br />
• Outflow restriction (orifice) must match<br />
preliminary design.<br />
• Flexibility in design:<br />
• Location of facility.<br />
• The District is open to alternative designs that<br />
meet minimum requirements.<br />
• Modified LIDA to address water quantity.
5. Results (example Preliminary Design)
5. Results (preliminary design)
5. Results - Costs
Questions and<br />
General Discussion<br />
Contact:<br />
Jadene Stensland, PE<br />
Phone: 503-681-3662<br />
Email: stenslandJ@CleanWaterServices.org