<strong>North</strong> <strong>Bethany</strong> Area<br />

Storm <strong>Implementation</strong> <strong>Plan</strong><br />

Jadene Torrent Stensland, PE<br />

Senior Engineer<br />

Water Resources<br />

Jadene Torrent Stensland, PE<br />

Senior Water Resources Engineer


OBJECTIVES<br />

• BACKGROUND<br />

• HISTORY<br />

• DRAINAGE MASTER PLAN<br />

• IMPLEMENTATION PLAN<br />

• DESIGNS<br />

• LIDA REDUCTIONS<br />

• COST ESTIMATES


BACKGROUND<br />

• Clean Water Services<br />

• Washington County Special Service District<br />

• Over 40 years of service<br />

• Urban Sanitary and <strong>Stormwater</strong> Management<br />

• Natural Resource Management<br />

• Serve population 527,000+ residents


BACKGROUND<br />

• <strong>North</strong> <strong>Bethany</strong> Sub Area<br />

• <strong>Plan</strong>ning began over 10 years ago<br />

• 800 acres, rural and ag<br />

• 458 developable acres<br />

• 3650 – 4750 new dwelling units<br />

• Area of Distinction<br />

Sustainability<br />

Parks and Trails<br />

Utilities <strong>Plan</strong>ning


<strong>North</strong> <strong>Bethany</strong> Area Map


History<br />

• Drainage Master <strong>Plan</strong><br />

• Complete in December 2010<br />

• Concept <strong>Plan</strong>ning Document<br />

Design Criteria<br />

Storm System concept layout<br />

Preliminary Cost Estimates


Linear Storm Water System and Trails<br />

Otak 2010 DMP<br />

Greenworks 2009 Sketch


<strong>Implementation</strong> <strong>Plan</strong><br />

• <strong>North</strong> <strong>Bethany</strong> <strong>Implementation</strong> <strong>Plan</strong><br />

• Regional Facilities<br />

• Major Conveyance System<br />

• 30% Designs<br />

• Cost Estimates


Regional Facility Sizing<br />

Facility Concepts<br />

1. Conventional Extended Dry Basin (round design)<br />

2. Linear Extended Dry Basin (cascade design)<br />

3. <strong>Implementation</strong> Options for Upstream LIDA


Conventional Extended Dry Basin<br />

Regional <strong>Stormwater</strong> Facility Design Criteria<br />

Design Criteria*<br />

District<br />

Maximum Depth<br />

4.0 feet<br />

Maximum Ponding Depth<br />

3.0 feet<br />

Freeboard<br />

1.0 feet<br />

Amended Soils<br />

1.0 feet<br />

Side Slopes (in treatment area) (H:V) 3:1<br />

Overflow (Y/N)<br />

Y<br />

Native <strong>Plan</strong>tings<br />

Y<br />

Fencing<br />

Y<br />

* Locate facilities outside of the<br />

stream and vegetated corridor<br />

(vc).<br />

Extended Dry Basin


Facility Design Alternatives<br />

Conventional Extended Dry Basin


Linear Extended Dry Basin<br />

Regional <strong>Stormwater</strong> Facility Design Criteria<br />

Design Criteria<br />

Value<br />

Maximum Depth<br />

4.0 feet<br />

Maximum Ponding Depth<br />

3.0 feet<br />

Freeboard<br />

1.0 feet<br />

Amended Soils<br />

1.0 feet<br />

Minimum Bottom Width<br />

8 feet<br />

Side Slopes (in treatment area) (H:V) 3:1<br />

Bottom Slope 0.5%<br />

Overflow (Y/N)<br />

Y<br />

Native <strong>Plan</strong>tings<br />

Y<br />

Fencing<br />

Y


Cascade Storm Water System<br />

Otak 2010 DMP<br />

Greenworks 2009 Sketch


Facility Design Alternatives<br />

Linear Extended Dry Basin Example (cascade)


Facility Design Alternatives<br />

Linear Extended Dry Basin Example (cascade)


3. Credit for Upstream LIDA<br />

Areas Where Site LIDA is Required


3. Credit for Upstream LIDA<br />

Assumptions for LIDA


2<br />

3. Credit for Upstream LIDA<br />

Impact to Regional Facility Size<br />

1. Regional Facility Only (No LIDA)<br />

2. LIDA Swale (Mandatory LIDA Areas Only)<br />

3. LIDA <strong>Plan</strong>ter Current Requirements (Mandatory LIDA Areas Only)<br />

4. LIDA <strong>Plan</strong>ter With Deeper Growing Medium (Mandatory LIDA<br />

Areas Only)<br />

5. LIDA <strong>Plan</strong>ter with Orifice to Meet Hydromod Stds. (Mandatory LIDA<br />

Areas Only)<br />

6. LIDA <strong>Plan</strong>ter Current Requirements (100% LIDA)<br />

7. LIDA <strong>Plan</strong>ter with Orifice to Meet Hydromod Stds. (100% LIDA)<br />

10000 15000 20000 25000 30000 35000 40000<br />

Regional Facility Surface Area (sq-ft)


2<br />

3. Credit for Upstream LIDA<br />

Regional Facility Sizing Reduction Factors<br />

Round Extended Detention Facility<br />

Subbasin<br />

BT3<br />

BT2 and BT3<br />

Impervious Area Treated<br />

by Mandatory LIDA<br />

(acres)<br />

Facility Size (ft2)<br />

0 20,146<br />

7.0 16,074<br />

0<br />

45,705<br />

11.0<br />

39,611<br />

Facility Area<br />

Reduction/Impervious Acre<br />

Treated by LIDA (ft2)<br />

582<br />

554<br />

Linear Detention Facility<br />

Subbasin<br />

BT3<br />

BT4<br />

Impervious Area Treated<br />

by Mandatory LIDA<br />

(acres)<br />

Facility Size (ft2)<br />

0 28,758<br />

7 25,800<br />

0 4,816<br />

3.4 3,440<br />

Facility Area<br />

Reduction/Impervious Acre<br />

Treated by LIDA (ft2)<br />

423<br />

406


3. Credit for Upstream LIDA<br />

Sizing Reduction Factors<br />

Facility<br />

ID<br />

Subbasin<br />

name<br />

Total<br />

contributing<br />

area,<br />

acres<br />

Impervious<br />

area,<br />

acres<br />

RSF top area<br />

at 4-foot<br />

depth,<br />

sq ft<br />

RSF top area<br />

50% <strong>Implementation</strong> of<br />

LIDA<br />

sq ft<br />

RSF top area<br />

100% <strong>Implementation</strong> of<br />

LIDA<br />

sq ft<br />

1 AB1 34.7 18.4 33,024 30,261 27,499<br />

2 AB2 32.0 17.8 19,772 16,265 12,759<br />

3 AB4 42.1 21.0 25,613 21,441 17,268<br />

4 AB6 29.9 14.3 25,800 23,965 22,130<br />

5 AB8 33.3 22.4 15,612 13,690 11,767<br />

6 AB9 59.8 40.1 22,708 18,932 15,155<br />

7 AB10 19.4 10.2 15,480 13,692 11,905<br />

8 AB11 33.7 16.8 33,540 30,352 27,164<br />

9 AB12 28.4 14.7 25,800 23,855 21,909<br />

10<br />

BT2 & BT3<br />

combined<br />

46.5 28.0 39,611 35,316 31,021<br />

11a BT3 26.8 16.4 16,074 13,663 11,252<br />

11b BT3 26.8 16.4 25,800 24,046 22,293<br />

12 BT4 14.9 6.8 3,440 2,749 2,058<br />

13 BT5 7.3 5.0 4,472 4,092 3,712<br />

14 BT6 16.4 8.5 5,848 4,448 3,048<br />

15 BT8 9.4 4.6 3,096 2,297 1,498<br />

16 RU3 71.3 37.7 44,340 35,617 26,894<br />

17 RU5 29.8 18.6 19,850 16,975 14,100


4. Analysis of Alternative LIDA<br />

Configurations<br />

2


2<br />

LIDA<br />

Configuration<br />

4. Analysis of Alternative LIDA<br />

Configurations<br />

LIDA <strong>Plan</strong>ter as<br />

Shown in the<br />

Manual<br />

LIDA <strong>Plan</strong>ter<br />

Plus Additional<br />

Growing Media<br />

LIDA <strong>Plan</strong>ter<br />

Plus Additional<br />

Ponding<br />

LIDA <strong>Plan</strong>ter Plus<br />

Ponding and<br />

Growing Media and<br />

Unlined<br />

LIDA <strong>Plan</strong>ter<br />

Plus Growing<br />

Media and<br />

Unlined<br />

LIDA <strong>Plan</strong>ter<br />

Plus Ponding<br />

and Growing<br />

Media and Dead<br />

Storage and<br />

Unlined<br />

LIDA <strong>Plan</strong>ter<br />

Plus Ponding<br />

and Growing<br />

Media and No<br />

Underdrain and<br />

Unlined<br />

Max Ponding<br />

Depth (in) 6 6 12 12 6 12 12<br />

Growing Media<br />

Depth (in) 18 24 18 24 30 30 30<br />

Drain Rock Layer<br />

Depth (in) 12 12 12 12 12 15 12<br />

Dead Storage (in) 3 3 3 3 3 6 12<br />

Lined Yes Yes Yes No No No No<br />

INFILT Value for<br />

Facility (in/hr) NA NA NA 0.2 0.2 0.2 0.2<br />

Sizing Factor<br />

(%Impervious<br />

Area) 31.5% 12% 16.5% 8.5% 7.25% 6.75% 6.4%<br />

Total Facility<br />

Depth (ft) 3.17 3.67 3.67 4.17 4.17 4.92 4.67


5. Results - Overview of Regional<br />

Facility Layout


5. Results<br />

• Required design elements:<br />

• Must meet District D&C Standards.<br />

• Footprint must match preliminary design.<br />

• Outflow restriction (orifice) must match<br />

preliminary design.<br />

• Flexibility in design:<br />

• Location of facility.<br />

• The District is open to alternative designs that<br />

meet minimum requirements.<br />

• Modified LIDA to address water quantity.


5. Results (example Preliminary Design)


5. Results (preliminary design)


5. Results - Costs


Questions and<br />

General Discussion<br />

Contact:<br />

Jadene Stensland, PE<br />

Phone: 503-681-3662<br />

Email: stenslandJ@CleanWaterServices.org

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!