29.08.2015 Views

Technology & Communications (DoIT&C) Government of Rajasthan (GoR)

Final RFP for comprehensive maintenance of existing IT ... - DOIT & C

Final RFP for comprehensive maintenance of existing IT ... - DOIT & C

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Final RFP - Maintenance <strong>of</strong> IT Hardware under various projects <strong>of</strong> DoIT&C<br />

16) Packing and Documents<br />

a) The Supplier/ Selected Bidder shall provide such packing <strong>of</strong> the Goods as is required to<br />

prevent their damage or deterioration during transit to their final destination, as indicated<br />

in the Contract. During transit, the packing shall be sufficient to withstand, without<br />

limitation, rough handling and exposure to extreme temperatures, salt and precipitation,<br />

and open storage. Packing case size and weights shall take into consideration, where<br />

appropriate, the remoteness <strong>of</strong> the final destination <strong>of</strong> the Goods and the absence <strong>of</strong><br />

heavy handling facilities at all points in transit.<br />

b) The packing, marking, and documentation within and outside the packages shall comply<br />

strictly with such special requirements as shall be expressly provided for in the Contract,<br />

including additional requirements, if any, specified in the contract, and in any other<br />

instructions ordered by the Purchaser.<br />

17) Insurance<br />

a) The goods will be delivered at the destination godown in perfect condition. The Goods<br />

supplied under the Contract shall be fully insured against loss by theft, destruction or<br />

damage incidental to manufacture or acquisition, transportation, storage, fire, flood,<br />

under exposure to weather and delivery at the designated project locations, in<br />

accordance with the applicable terms. The insurance charges will be borne by the<br />

supplier and Purchaser will not be required to pay such charges if incurred.<br />

b) The goods will be delivered at the FOR destination in perfect condition.<br />

18) Transportation<br />

The supplier/ selected bidder shall be responsible for the proper packing so as to avoid<br />

damage under normal conditions <strong>of</strong> transport by sea, rail and road or air and delivery <strong>of</strong> the<br />

material in the good condition to the consignee at destination. In the event <strong>of</strong> any loss,<br />

damage, breakage or leakage or any shortage the bidder shall be liable to make good such<br />

loss and shortage found at the checking/ inspection <strong>of</strong> the material by the consignee. No<br />

extra cost on such account shall be admissible.<br />

19) Inspection<br />

a) The Purchase Officer or authorizedcommittee or representative shall at all reasonable<br />

time have access to the supplier‟s/ selected bidder‟s premises and shall have the power<br />

at all reasonable time to inspect and examine the materials and workmanship <strong>of</strong> the<br />

goods/ equipment/ machineries during manufacturing process or afterwards as may be<br />

decided.<br />

Page 44 <strong>of</strong> 77

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!