29.08.2015 Views

Technology & Communications (DoIT&C) Government of Rajasthan (GoR)

Final RFP for comprehensive maintenance of existing IT ... - DOIT & C

Final RFP for comprehensive maintenance of existing IT ... - DOIT & C

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Final RFP - Maintenance <strong>of</strong> IT Hardware under various projects <strong>of</strong> DoIT&C<br />

vii. Assist the purchaser / existing FMS service providor in sorting out issues and fixing<br />

<strong>of</strong> problems related to OS, device drivers, firmware, hardware and their patches.<br />

f. The MSP shall prepare formats <strong>of</strong> all registers and reports (including call slips,<br />

complaint register, summary reports and SLA reports) and get them approved from<br />

DoIT&C.<br />

B. Service not under the scope : The department has outsourced the activity <strong>of</strong> Facility<br />

Management Services (FMS) to a service provider (SP). The brief details <strong>of</strong> existing FMS<br />

services are defined below with his role and responsibility. The bidder is not supposed to carry<br />

out the below mentioned works which are under scope <strong>of</strong> existing FMS SP.<br />

a. Preventive maintenaince services<br />

i. Limited to check whether the equipment is properly working or not. In case, any<br />

problem or fault is observed, call will be logged to the selected bidder for<br />

removal /correction <strong>of</strong> the fault.<br />

b. Assets management services<br />

c. Configurtion & reconfiguration <strong>of</strong> equipment/ network /services<br />

d. Vendor management services<br />

e. Network management services<br />

f. Virus management<br />

g. End user support<br />

C. Roles & Responsibilities <strong>of</strong> MSP<br />

The MSP is expected to provide services defined as per detail scope <strong>of</strong> work.<br />

D. Responsibilities <strong>of</strong> User Department/ User<br />

a. Shall provide all logistic support to the service engineer required to resolve the call<br />

b. Shall provide permission/ gate pass to carry out goods/ equipment/ parts required to be<br />

taken by the service engineer.<br />

c. Shall provide timely sign-<strong>of</strong>f <strong>of</strong> call slips.<br />

E. Responsibilities <strong>of</strong> DoIT&C<br />

a. Conduct Project implementation and review meetings for monitoring the project.<br />

b. Verify SLA compliance/ deliverables & Approve payments for MSP.<br />

c. In consultation with user departments review and approve project deliverables as given in<br />

the RFP.<br />

d. Ensure overall coordination between user, user departments and MSP.<br />

F. Project Activity, Deliverables& Timelines<br />

Page 13 <strong>of</strong> 77

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!