Technology & Communications (DoIT&C) Government of Rajasthan (GoR)
Final RFP for comprehensive maintenance of existing IT ... - DOIT & C
Final RFP for comprehensive maintenance of existing IT ... - DOIT & C
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Final RFP - Maintenance <strong>of</strong> IT Hardware under various projects <strong>of</strong> DoIT&C<br />
vii. Assist the purchaser / existing FMS service providor in sorting out issues and fixing<br />
<strong>of</strong> problems related to OS, device drivers, firmware, hardware and their patches.<br />
f. The MSP shall prepare formats <strong>of</strong> all registers and reports (including call slips,<br />
complaint register, summary reports and SLA reports) and get them approved from<br />
DoIT&C.<br />
B. Service not under the scope : The department has outsourced the activity <strong>of</strong> Facility<br />
Management Services (FMS) to a service provider (SP). The brief details <strong>of</strong> existing FMS<br />
services are defined below with his role and responsibility. The bidder is not supposed to carry<br />
out the below mentioned works which are under scope <strong>of</strong> existing FMS SP.<br />
a. Preventive maintenaince services<br />
i. Limited to check whether the equipment is properly working or not. In case, any<br />
problem or fault is observed, call will be logged to the selected bidder for<br />
removal /correction <strong>of</strong> the fault.<br />
b. Assets management services<br />
c. Configurtion & reconfiguration <strong>of</strong> equipment/ network /services<br />
d. Vendor management services<br />
e. Network management services<br />
f. Virus management<br />
g. End user support<br />
C. Roles & Responsibilities <strong>of</strong> MSP<br />
The MSP is expected to provide services defined as per detail scope <strong>of</strong> work.<br />
D. Responsibilities <strong>of</strong> User Department/ User<br />
a. Shall provide all logistic support to the service engineer required to resolve the call<br />
b. Shall provide permission/ gate pass to carry out goods/ equipment/ parts required to be<br />
taken by the service engineer.<br />
c. Shall provide timely sign-<strong>of</strong>f <strong>of</strong> call slips.<br />
E. Responsibilities <strong>of</strong> DoIT&C<br />
a. Conduct Project implementation and review meetings for monitoring the project.<br />
b. Verify SLA compliance/ deliverables & Approve payments for MSP.<br />
c. In consultation with user departments review and approve project deliverables as given in<br />
the RFP.<br />
d. Ensure overall coordination between user, user departments and MSP.<br />
F. Project Activity, Deliverables& Timelines<br />
Page 13 <strong>of</strong> 77