86 In addition to the standards mentioned, all works shall also conform to the requirements of the following:- a) Indian Electricity Act and rules framed thereunder. b) Fire insurance regulations. c) Regulations laid down by the Chief Electrical Inspector of the State / State Electricity Board. d) Regulations laid down by the Pollution Control Board. e) Regulations laid down by the Factory Inspector of the State. f) Any other regulations laid down by the local authorities. g) Installation operating manuals of original manufacturers of equipment. Note : Following points form integral part of technical specifications and shall have superseding effect on the technical specifications given in the tender wherever applicable:- 1. Tenderer should visit the site at Bikaner Milk Union to ascertain the complete scope of work as per the site conditions i.e. matching with the existing powder plant design parameters. So that the complete hook up of supplied system should match with the existing powder plant parameter to ensure the desired output SMP as per the capacity of plant. 2. Tender should clarify the warranty conditions/ life of supplied membrane. 3. Tenderer should ensure that type of membrane should be capable of handling 1% fat at the Milk inlet. 4. Tender should indicate the annual operating cost of supplied membrane technology with justification. 5. The feed temperature of Skim Milk i.e. 10 o C. 6. Concentrate Milk temperature at outlet i.e. 15 o C 7. Feed T.S. 8% and Concentrate T.S. 15%. 8. Duplex Filter of 40 micron has to be provided on feed line at inlet. 9. Minimum Storage capacity of permeate to be define by tenderer as same will be used for CIP of system. 10. Tenderer should have completed minimum 3 projects of similar nature in dairy industry and should submit successful completion certificate. Accordingly tenderer should ensure successful hooking up of supplied system with exiting system. 11. Cost of cleaning chemical required for 7 days trial period should be included. Chemical to be define and provided by the tenderer during trial. 12. Plant operator training period minimum 15 days. 13. Price exchange rate will be finalize at the time of financial bid opening. All other terms & conditions, specifications and scope of the supply shall be as per terms & conditions and specifications of tender document. (Signed & sealed by the tenderer in token of acceptance of above) (RCDF) Jaipur
- Page 35 and 36: 35 such changes shall diminish the
- Page 37 and 38: 37 10.6 Erector shall also keep a c
- Page 39 and 40: 39 GI parts (within the building) s
- Page 41 and 42: 41 workmanship. In case of any disp
- Page 43 and 44: 43 19.4 All other work completed or
- Page 45 and 46: 45 21.5 When erector or his represe
- Page 47 and 48: 47 drawings by RCDF shall not relie
- Page 49 and 50: 49 inspection reports and megger re
- Page 51 and 52: 51 30.0 Progress of Work : If the e
- Page 53 and 54: 53 a) Suitable lockable space for s
- Page 55 and 56: 55 41.0 GENERAL GUIDELINES FOR ELEC
- Page 57 and 58: 57 41.11 Installation and testing o
- Page 59: 59 42.8 Special tools, clips and sa
- Page 62 and 63: 62 a) The scope of erection for pip
- Page 64 and 65: 64 48.2 Steam & Hot Water and molas
- Page 66 and 67: 66 1) The surface of the pipe to be
- Page 68 and 69: 68 TENDER ACCEPTANCE LETTER (To be
- Page 70 and 71: 70 SECTION-I ANNEXURE-II MANUFACTUR
- Page 72 and 73: 72 ANNEXURE-IV SECTION-II - SCHEDUL
- Page 74 and 75: 74 ANNEXURE-VI RATE QUOTATION FORM
- Page 76 and 77: 76 amendment as may be issued by th
- Page 78 and 79: 78 ANNEXURE-VIII (Form of Bank Guar
- Page 80 and 81: 80 (Performa of Bank Guarantee for
- Page 82 and 83: 82 ANNEXURE -X S/I/T/C Period: 6 mo
- Page 84 and 85: 84 recirculation loop section, incl
86<br />
In addition to the standards mentioned, all works shall also conform to the<br />
requirements of the following:-<br />
a) Indian Electricity Act and rules framed thereunder.<br />
b) Fire insurance regulations.<br />
c) Regulations laid down by the Chief Electrical Inspector of the State / State Electricity<br />
Board.<br />
d) Regulations laid down by the Pollution Control Board.<br />
e) Regulations laid down by the Factory Inspector of the State.<br />
f) Any other regulations laid down by the local authorities.<br />
g) Installation operating manuals of original manufacturers of equipment.<br />
Note :<br />
Following points form integral part of technical specifications and shall have<br />
superseding effect on the technical specifications given in the tender wherever<br />
applicable:-<br />
1. Tenderer should visit the site at Bikaner Milk Union to ascertain the<br />
complete scope of work as per the site conditions i.e. matching with the<br />
existing powder plant design parameters. So that the complete hook up of<br />
supplied system should match with the existing powder plant parameter to<br />
ensure the desired output SMP as per the capacity of plant.<br />
2. Tender should clarify the warranty conditions/ life of supplied membrane.<br />
3. Tenderer should ensure that type of membrane should be capable of<br />
handling 1% fat at the Milk inlet.<br />
4. Tender should indicate the annual operating cost of supplied membrane<br />
technology with justification.<br />
5. The feed temperature of Skim Milk i.e. 10 o C.<br />
6. Concentrate Milk temperature at outlet i.e. 15 o C<br />
7. Feed T.S. 8% and Concentrate T.S. 15%.<br />
8. Duplex Filter of 40 micron has to be provided on feed line at inlet.<br />
9. Minimum Storage capacity of permeate to be define by tenderer as same<br />
will be used for CIP of system.<br />
10. Tenderer should have completed minimum 3 projects of similar nature in<br />
dairy industry and should submit successful completion certificate.<br />
Accordingly tenderer should ensure successful hooking up of supplied<br />
system with exiting system.<br />
11. Cost of cleaning chemical required for 7 days trial period should be<br />
included. Chemical to be define and provided by the tenderer during trial.<br />
12. Plant operator training period minimum 15 days.<br />
13. Price exchange rate will be finalize at the time of financial bid opening.<br />
All other terms & conditions, specifications and scope of the supply<br />
shall be as per terms & conditions and specifications of tender document.<br />
(Signed & sealed by the tenderer<br />
in token of acceptance of above)<br />
(RCDF)<br />
Jaipur