TENDER DOCUMENT FOR SUPPLY INSTALLATION & COMMISSIONING OF DAIRY EQUIPMENTS
Tender ID No. - Rajasthan Co-operative Dairy Federation Limited Tender ID No. - Rajasthan Co-operative Dairy Federation Limited
82 ANNEXURE –X S/I/T/C Period: 6 month TECHNICAL SPECIFICATION FOR APPLICATION OF MEMBRANE FILTERATION FOR CONCENTRATION OF MILK 1.0 FUNCTIONAL REQUIREMENT : The powder plant of capacity 5 MT equipped with Niro (L & T) make atomizer model F-10 exist at Milk Union, Bikaner. Powder plant is in working condition. The membrane technology need to be applied to enhance powder manufacturing capacity within existing design parameter by efficient production of concrete milk for powder plant at Milk Union, Bikaner. 1. The Composition of Feed Skim Milk available at site & other related parameters of existing system. Protein - 2.8% Lactose - 4.8% Acidity - 0.135% Ash - 0.7% Fat - 0.05% T.S. - 8.0% - 8.5% 2. Expected concentration out of ment. 13 - 15% 3. Existing feed rate & Feed T.S. to Evaporator 2000 ltre Skim Milk of 8% T.S. per hour. 4. Concentrate Feed rate 400 litre of 40% per hour 5. Existing feed rate to dryer 400 litre of 40% per hour 6. Feed rate to be increased 3000 litre of 40% per hour 2.0 SCOPE OF WORK : Supply, Installation, Testing & Commissioning of Membrane technology Plant along with all related accessories i.e. SS pipe and pipe fittings, SS valves, electricals, electronic controls etc. to process 5,000 Kg per hour of Skim milk at 9.08% TS concentrating to 15% TS. The plant should be designed to operate in a continuous mode and is based on 20-hr/day operation on product and 4 hours of CIP as long as the skim milk meets pretreatment and quality. The system shall be designed for cleaning in place. Capabilities are provided in the control system with the appropriate valving for circulation of a cleaning agent followed by a water rinse. The steps involved in the cleaning cycles will be timed and sequenced automatically by the supplied PLC control system. Automation system for Addition of cleaning chemicals (Manual) Heating of cleaning solution Circulation of wash (Signed & sealed by the tenderer in token of acceptance of above) (RCDF) Jaipur
83 Water flush (at beginning of CIP and between each cleaning step. The parameters to be achieved after perfect process designing. Mass Balance (15% T.S) for Concentration for Skim Cow’s Milk Feed Rate : 5,000 Kg/hr. Concentrate Rate : 3000 Kg/hr. Permeate Rate : 2000 Kg/hr. EQUIPMENTS SPECIFICATION 3.0 FEED SECTION The feed section should be designed to provide adequate flow to the system plant during both production and CIP. This section should consists set of valves with flow switches and control tops. Feed Balance Tank Sock Filters Sock filters arrangement designed to prevent foreign material from entering into the system. Air actuated valves with flow switches are to be provided to allow automatic switching of filters from the control panel Pre-Feed Pump and Feed Pump To provide adequate feed flow at desired pressure during production and CIP. CIP Shell & Tube Heat Exchanger The heat exchanger should be of sanitary standards and is used to maintain the cleaning temperature by means of steam. * Pressure Gauges/Pressure Transmitters & related Stainless Steel Pipes and Fittings, Sample Valve for sample feed etc. are to be provided. 3.1 THE STAGES OF FILTRATION SYSTEM. Recirculation Stages The system should consists of stainless steel housings/vessels and membranes in different stages Recirculation Pump(s), to provide a constant cross flow condition over the membranes to maintain optimum flux and minimum fouling. Shell and Tube Heat Exchangers The heat exchangers should be of sanitary standards and should be used to maintain the production and CIP temperature by means of cooling water and related Set of Stainless Steel Pipes and Fittings required for completing the total (Signed & sealed by the tenderer (RCDF) in token of acceptance of above) Jaipur
- Page 31 and 32: 31 GENERAL TERMS AND CONDITIONS FOR
- Page 33 and 34: 33 required by all. It is to be und
- Page 35 and 36: 35 such changes shall diminish the
- Page 37 and 38: 37 10.6 Erector shall also keep a c
- Page 39 and 40: 39 GI parts (within the building) s
- Page 41 and 42: 41 workmanship. In case of any disp
- Page 43 and 44: 43 19.4 All other work completed or
- Page 45 and 46: 45 21.5 When erector or his represe
- Page 47 and 48: 47 drawings by RCDF shall not relie
- Page 49 and 50: 49 inspection reports and megger re
- Page 51 and 52: 51 30.0 Progress of Work : If the e
- Page 53 and 54: 53 a) Suitable lockable space for s
- Page 55 and 56: 55 41.0 GENERAL GUIDELINES FOR ELEC
- Page 57 and 58: 57 41.11 Installation and testing o
- Page 59: 59 42.8 Special tools, clips and sa
- Page 62 and 63: 62 a) The scope of erection for pip
- Page 64 and 65: 64 48.2 Steam & Hot Water and molas
- Page 66 and 67: 66 1) The surface of the pipe to be
- Page 68 and 69: 68 TENDER ACCEPTANCE LETTER (To be
- Page 70 and 71: 70 SECTION-I ANNEXURE-II MANUFACTUR
- Page 72 and 73: 72 ANNEXURE-IV SECTION-II - SCHEDUL
- Page 74 and 75: 74 ANNEXURE-VI RATE QUOTATION FORM
- Page 76 and 77: 76 amendment as may be issued by th
- Page 78 and 79: 78 ANNEXURE-VIII (Form of Bank Guar
- Page 80 and 81: 80 (Performa of Bank Guarantee for
- Page 84 and 85: 84 recirculation loop section, incl
- Page 86: 86 In addition to the standards men
82<br />
ANNEXURE –X<br />
S/I/T/C Period: 6 month<br />
TECHNICAL SPECIFICATION <strong>FOR</strong> APPLICATION <strong>OF</strong> MEMBRANE FILTERATION<br />
<strong>FOR</strong> CONCENTRATION <strong>OF</strong> MILK<br />
1.0 FUNCTIONAL REQUIREMENT :<br />
The powder plant of capacity 5 MT equipped with Niro (L & T) make atomizer<br />
model F-10 exist at Milk Union, Bikaner. Powder plant is in working condition.<br />
The membrane technology need to be applied to enhance powder manufacturing<br />
capacity within existing design parameter by efficient production of concrete milk<br />
for powder plant at Milk Union, Bikaner.<br />
1. The Composition of Feed Skim Milk available at site & other related parameters of<br />
existing system.<br />
Protein - 2.8%<br />
Lactose - 4.8%<br />
Acidity - 0.135%<br />
Ash - 0.7%<br />
Fat - 0.05%<br />
T.S. - 8.0% - 8.5%<br />
2. Expected concentration out of ment. 13 - 15%<br />
3. Existing feed rate & Feed T.S. to Evaporator 2000 ltre Skim Milk of<br />
8% T.S. per hour.<br />
4. Concentrate Feed rate 400 litre of 40% per hour<br />
5. Existing feed rate to dryer 400 litre of 40% per hour<br />
6. Feed rate to be increased 3000 litre of 40% per hour<br />
2.0 SCOPE <strong>OF</strong> WORK :<br />
Supply, Installation, Testing & Commissioning of Membrane technology Plant along<br />
with all related accessories i.e. SS pipe and pipe fittings, SS valves, electricals,<br />
electronic controls etc. to process 5,000 Kg per hour of Skim milk at 9.08% TS<br />
concentrating to 15% TS. The plant should be designed to operate in a<br />
continuous mode and is based on 20-hr/day operation on product and 4 hours of<br />
CIP as long as the skim milk meets pretreatment and quality.<br />
The system shall be designed for cleaning in place. Capabilities are<br />
provided in the control system with the appropriate valving for circulation of<br />
a cleaning agent followed by a water rinse. The steps involved in the<br />
cleaning cycles will be timed and sequenced automatically by the supplied<br />
PLC control system. Automation system for<br />
Addition of cleaning chemicals (Manual)<br />
Heating of cleaning solution<br />
Circulation of wash<br />
(Signed & sealed by the tenderer<br />
in token of acceptance of above)<br />
(RCDF)<br />
Jaipur