workmanship. In case of any dispute, the decision of the RCDF/Manufacturer‟s<br />
erection supervisor shall be final and binding on the erector.<br />
18.6 Erector shall haul materials and equipment furnished at RCDF‟s storage or<br />
unloading areas to the points where they are to be used, in the construction<br />
work, install the materials and equipment in their final location and classify<br />
and store all surplus and auxiliary parts in a systematic manner in the<br />
warehouse, where they can be readily identified and located when needed at a<br />
later date.<br />
18.7 In the execution of the work no person other than erector or his duly appointed<br />
representatives, his subcontractors and their workman shall be allowed to do<br />
work at the site except by the special permission, in writing of RCDF or their<br />
representatives, but access to everywhere in the site at all times shall be<br />
accorded to RCDF and their representatives and other authorized officials and<br />
statutory public authorities. Nevertheless, erector shall not object to the<br />
execution of the work by other erector/contractor or tradesman whose names<br />
shall have been previously communicated in every facility for the execution of<br />
their several functions simultaneously with his own.<br />
18.8 Erector shall carry out the required „minor modification work‟ at site as<br />
required to efficiently complete the work covered in this contract at no extra<br />
cost over his contracted sum. However „minor modifications‟ shall not involve<br />
more than 24 man hours per each item of such work. However, in case of<br />
„major modifications‟ which are required to be done on the equipment, for no<br />
fault of erector he shall be compensated on the basis of man day rates. It is the<br />
responsibility of the erector to get the prior approval for such „major<br />
modifications work‟ from RCDF before such works are taken up. Erector shall<br />
also get the estimates and the actual time sheets certified by RCDF and these<br />
certified time sheets will be the basis for processing his bills for the „Major<br />
modifications‟.<br />
18.9 If the work or any portion thereof shall be damaged in any way excepting by<br />
the acts of RCDF, or if defects not readily detected on prior inspection and<br />
which shall develop before the final completion and acceptance of the whole<br />
work, erector shall forthwith make good, without compensation, such damage<br />
or defects in a manner satisfactory to RCDF. In no case shall defective or<br />
imperfect work will be retained.<br />
18.10 Erector at all times shall work in co-ordination with RCDF‟s engineering staff<br />
and after them all reasonable facilities to become familiar with the erection,<br />
operation and maintenance of the equipments.<br />
18.11 In respect of observation of local rules, administrative orders, working staff<br />
and the like, erector and his personnel shall co-operate with the RCDF.<br />
(Signed & sealed by the tenderer<br />
in token of acceptance of above)<br />