RAJASTHAN CO-OPERATIVE DAIRY FEDERATION LIMITED
RAJASTHAN CO-OPERATIVE DAIRY FEDERATION LIMITED RAJASTHAN CO-OPERATIVE DAIRY FEDERATION LIMITED
(iii) Instruction Manual – 3 Sets. (iv) Tool Kit – 1 Set. 82 18. A control panel equipped with all automation and control, moter starter etc. 19. The Homogenizer should be supplied with adjustable ball feet. 20. Inlet/Outlet connection of suitable size. 21. Tenderer should fill the details mentioned at Annexure – I. Note: .The supervision of erection and commissioning of the Homogenizer is also included in the scope of supplier, for which no extra charges would be payable. Annexure - I DETAIL OF HOMOGENIZER, 10000 LITRE PER HOUR TO BE FILLED BY TENDERER. Name of Tenderer : ____________________________________________ S. No. Item Specification 1. Model 2. Capacity 10000 LPH 3. Pressure 4. Electrical Motor 5. No. of Plungers / material 6. Homogenizing heads 2 Stage 7. Homogenizing Valve Material Tungsten Carbide 8. Inlet / Outlet connection 9. Mounting frame MS frame with SS enclosure 10. Contact parts SS 316 11. Pressure 12. Set of essential Spare 13. Set of Essential Tools 14. Dimensions 15. High Pressure Pump Block (Chamber) material Single piece forge SS 316 tested with ultra sound. 16. Gasket Food grade Non toxic. Fat resistant and non absorbtant 17. Crank case material Spheorodal Cast Iron 18. Crank shaft, connecting rod and bearings Forged steel 19. Plunger Packing should be suitable for Hot CIP. 20. Control Panel (Define detail of items to be supplied in control panel) 21. Diaphram type SS 316 pressure gauge. (Signed & sealed by the tenderer in token of acceptance of above) (RCDF) Jaipur
83 (Signed & sealed by the tenderer in token of acceptance of above) (RCDF) Jaipur
- Page 31 and 32: GENERAL TERMS AND CONDITIONS FOR ER
- Page 33 and 34: 33 provide all Labour materials and
- Page 35 and 36: 35 inseparable part of the work con
- Page 37 and 38: 37 If any part of Erector‟s work
- Page 39 and 40: 39 and other surfaces which have be
- Page 41 and 42: 41 18.7 In the execution of the wor
- Page 43 and 44: 43 19.5 Erector shall effectively p
- Page 45 and 46: 45 21.6 Erector shall furnish RCDF
- Page 47 and 48: 47 23.10 If, at any time before the
- Page 49 and 50: 49 25.9 All the necessary items/goo
- Page 51 and 52: 51 30.0 Progress of Work : If the e
- Page 53 and 54: 53 circumstances) the security of t
- Page 55 and 56: 55 c) The cable of electric power s
- Page 57 and 58: 42.0 Cable Installation : 57 42.1 E
- Page 59 and 60: 42.10 Connections shall be made to
- Page 61 and 62: 45.5 All underground connections fo
- Page 63 and 64: 63 outside of the carbon steel pipe
- Page 65 and 66: 65 49.2 Piping (SS) (if mentioned i
- Page 67 and 68: TENDER ACCEPTANCE LETTER (To be giv
- Page 69 and 70: SECTION-I 69 ANNEXURE-II MANUFACTUR
- Page 71 and 72: 71 ANNEXURE-IV SECTION-II - SCHEDUL
- Page 73 and 74: 73 ANNEXURE-VI RATE QUOTATION FORM
- Page 75 and 76: 75 3(a) 3(b) The Federation do here
- Page 77 and 78: ANNEXURE-VIII (Form of Bank Guarant
- Page 79 and 80: (Performa of Bank Guarantee for rel
- Page 81: TECHNICAL SPECIFICATION FOR SUPPLY,
83<br />
(Signed & sealed by the tenderer<br />
in token of acceptance of above)<br />
(RCDF)<br />
Jaipur