65<br />
49.2 Piping (SS) (if mentioned in Purchase Order)<br />
The scope includes the installation and inter connection of a set of SS Pipes<br />
and fittings, including cocks, valves, Tees, flanges, unions, bends, reducers,<br />
liners and other necessary fittings SMS/IDF standards, for inter connecting all<br />
the equipment listed. Necessary pipe supports shall be also installed by the<br />
Erector.<br />
49.3 Pipe fittings at connection points<br />
All the required fittings that would be needed in the piping at all the tapping,<br />
termination, connection and intermediate points must be installed by the<br />
Erector.<br />
49.4 The erector shall prepare and submit the piping layout drawing, details of<br />
supports, details of tapping, termination interconnection etc. for approval. All<br />
the piping work shall be carried out strictly in accordance with the approved<br />
drawings/details. The respective milk flow diagram to which the piping layout<br />
correspondence must also be furnished by the erector.<br />
50.0 Insulation (if mentioned in Purchase Order)<br />
50.1 Insulation of chilled water, Glycol pipelines & ammonia suction line :<br />
All the chilled water pipelines shall be insulated as specified with 50 mm/75<br />
mm thick expanded polystyrene (50 mm for pipe 100 mm dia or less size) and<br />
all the Glycol pipeline should be installed with 75 mm thick expanded<br />
polystyrene in suitable pipe sections. The insulation shall be carried out in the<br />
following manner.<br />
1) The surface of the pipe to be insulated should be properly cleaned.<br />
2) Hot bitumen should be applied uniformly @ 1.5 kg. per sq. mm. on the surface<br />
of the pipe.<br />
3) A similar layer of bitumen should be applied on the inner surface and on the<br />
edges of the insulation section.<br />
4) The sections should then be stuck to the coated pipe with joints staggered.<br />
Adjacent sections should be tightly pressed together.<br />
5) All joints should be properly sealed with bitumen.<br />
6) A thick vapour seal of hot bitumen @ 2.5 kg per sq. mm. should be applied<br />
uniformly on the outer surface of the pipe sections and allowed to dry.<br />
(Signed & sealed by the tenderer<br />
in token of acceptance of above)<br />
(RCDF)<br />
Jaipur