64<br />

The scope of installation comprises (if mentioned) a set of well water pipes<br />

and fittings including supports, isolation and non-return valves etc. Pipes of GI<br />

Class „B‟ for providing well water to sterlizer would be required. All the<br />

necessary headers for inter-connecting the water pumps and auxiliary material<br />

like adopters reducers, flanges, union valves/checks (of gun metal/brass for<br />

valve upto 100 mm dia), bends, strainers, gaskets, packing etc. required for the<br />

pipe should also be supplied and installed by the erector.<br />

48.4 Water distribution (if mentioned in purchase order)<br />

The scope of supply and installation if mentioned comprises of the following:<br />

Set of water pipes and fittings of GI Class „B‟ for providing water connection<br />

to the various equipment/items and points requiring water (raw and soft water)<br />

from battery limits. The scope is also inclusive of the necessary pipes and<br />

fittings, GI Class „B‟ for the soft water from the softening plant to soft water<br />

overhead tank if specifically mentioned and further to all the equipments<br />

requiring soft water and interconnections with suitable valves etc. from all the<br />

compartments of the overhead tank. The supply and installation is inclusive of<br />

necessary pipe supports, isolated valves, strainers, bends gaskets, packing,<br />

polythene/copper tubes and all other necessary auxiliary items.<br />

48.5 Air requirement (if mentioned in purchase order)<br />

The scope of supply and installation if mentioned comprise of the following:<br />

Set of air pipes and fittings in accordance with MS „C‟ Class for providing air<br />

to the various equipments/items and controls and points requiring the same.<br />

The scope of supply and installation is inclusive of necessary pipe supports,<br />

valves, filters, bends, gaskets, packing, polythene, copper tubes and all other<br />

necessary auxiliary items.<br />

48.6 All the above referred piping should generally be of welded execution and<br />

must be removed of mill scales and properly cleaned before installation.<br />

49.0 Important Note :<br />

49.1 All the necessary materials, of a quality and make approved by RCDF required<br />

for carrying out the installation mentioned in 46.2 shall be supplied by the<br />

Erector.<br />

(Signed & sealed by the tenderer<br />

in token of acceptance of above)<br />

(RCDF)<br />

Jaipur