outside of the carbon steel pipe (black) shall receive two coats of red lead<br />
paint.<br />
47.0 Testing for :<br />
1. HP Steam 4. Soft and Raw Water<br />
2. LP Steam 5. Air<br />
3. Glycol 6. SS Piping<br />
7. Insulation 8. Electricals<br />
9. Motors 10. Equipments.<br />
Should conform to the latest ISI standards.<br />
48.0 Service piping Installation guide lines :<br />
48.1 Chilled water & Glycol piping (if mentioned in purchase order)<br />
The scope of erection and installation if mentioned, comprises a set of GI „B‟<br />
class pipes and fittings for chilled water and glycol including supports,<br />
isolation and non-return valves etc. for providing chilled water or glycol to all<br />
the equipment which would require chilled water or glycol. All the necessary<br />
headers for interconnecting all the chilled water and glycol pumps and<br />
auxiliary materials like adapters, reducers, flanges, union, valves/cocks/ (of<br />
gun-metal/brass for valves upto 100 mm. dia), strainers, gaskets, packing etc.<br />
required for the pipe should also be supplied and installed by the erector. The<br />
pipeline should be insulated as per the specification detailed.<br />
48.2 Steam & Hot Water and molasses Piping (if mentioned in purchase order)<br />
The scope of supply and installation of mentioned, comprises the following set<br />
of steam pipes and fittings for providing steam connections from the indicated<br />
battery point to all the equipments requiring steam in accordance with IBR, MS<br />
Class „C‟ pipes, fittings and auxiliary items. The scope of supply and<br />
installation includes the necessary pipes supports, isolation supports, isolation<br />
valves, nonreturn valves, safety valves, check valves, pressure reducing valves<br />
steam traps, strainers, expanders, bends, gaskets, packing, sight glasses,<br />
pressure gauges etc. The manufacturer‟s certificates that the material conforms<br />
to IBR duly attested by concerned authority should be furnished for all items as<br />
per requirements. The necessary check valves(s) and other fittings required at<br />
the sources of tapping at the battery point should also be supplied and installed<br />
by the erector.<br />
Set of condensate pipes and fittings of MS Class „C‟ to interconnect the<br />
condensate return line. The supply is inclusive of necessary pipe supports<br />
isolation valves, check valves, bends, gaskets, packing etc.<br />
48.3 Soft well water piping (if mentioned in purchase order)<br />
(Signed & sealed by the tenderer<br />
in token of acceptance of above)<br />
(RCDF)<br />
Jaipur