c) The cable of electric power should be of PVC armoured type approved<br />

from ISI unless otherwise specified and with sufficient cross section<br />

depending on the feeder.<br />

d) The cable for control and flexible connection should be unarmoured type<br />

with copper conductors. Wherever required, multicore copper cable should<br />

be used.<br />

e) Wherever necessary drip proof junction boxes and isolators, cable carrying<br />

trays, necessary clamps etc. shall be provided.<br />

f) Necessary isolators of appropriate sizes are to be provided near the motors<br />

as per IER. All the involved supply included within the scope of electrical<br />

installation and erection should be approved type and make and conform to<br />

ISI standard.<br />

g) Detailed electrical diagrams and cable layout should be prepared by the<br />

erector according to the specifications and the same should be approved by<br />

RCDF before the execution.<br />

41.2 Electrical installation work shall comply with all currently applicable statues,<br />

regulations and safety codes in the locality where the equipment will be<br />

installed. Nothing in this specifications shall be construed to relieve erector of<br />

his responsibility.<br />

41.3 Unless otherwise specified installation work shall comply with the<br />

requirements of latest additions of applicable Indian standards.<br />

41.4 In accordance with the specific installation instructions, as shown on<br />

manufacturer‟s drawings or as directed by Site Engineer of RCDF, the erector<br />

shall unload, erect, install wire test and put into commercial use all the<br />

electrical equipment included in the contract. Equipment shall be installed in<br />

neat workman like manner so that if is in level and plumb, properly aligned and<br />

oriented. Tolerance shall be established in manufacturer‟s drawings or as<br />

stipulated by an Engineer. No equipment shall be permanently bolted down to<br />

foundation or structure until the alignment has been checked.<br />

41.5 Erector shall furnish all supervision, labour, tools, equipment, ribbing,<br />

materials and incidental materials such as holts, wedges, anchors, concrete,<br />

inserts etc. required to completely install test and adjust the equipment.<br />

41.6 Where assemblies are supplied is more than one section erector shall make all<br />

necessary mechanical and electrical connections between sections including the<br />

connection between buses. Erector shall also do necessary<br />

adjustment/alignments necessary for proper operations of circuit breakers<br />

isolators, and their operating mechanism. All insulators and bushings chipped,<br />

(Signed & sealed by the tenderer<br />

in token of acceptance of above)<br />

(RCDF)<br />

Jaipur

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!