f) Recharging or make-up filling of lubricant oil up to the desired level in the lubrication system of individual machine. g) Operation in empty condition to check general operation details wherever required, and wherever possible. h) Closed loop dynamic testing with water wherever required. i) Operation under load and gradual load increase to attain maximum rated output. j) Trouble shooting during the trial period. k) Guarantee of installation. 32.0 Guarantee : The supply of equipment as well as installation shall have to be carried out by the erector to the entire satisfaction of the RCDF. The erector shall also guarantee to repair/replace, without any extra cost, the items or parts thereof, if found defective due to bad design, workmanship or substandard material within 12 months from the date of commissioning or 36 months from the date of receipt of material at site whichever is earlier. If it is necessary to send the defective equipment or parts thereof for repair/replacement, cost of transportation including package, insurance etc. from the site to works and back to site shall have to be borne by the erector. The guarantee does not cover any damage resulting from normal wear and tear or improper attendance or mishandling of the equipment by the RCDF. 33.0 Training of personnel : Necessary staff as may be deputed by RCDF shall be trained by the erector for operating the plant. The personnel will be associated for the training during the installation, testing, commissioning and start-up period and training tenure shall be minimum for a period of one month from the date of commissioning and start-up. 34.0 Outline of the scope of duties of the Contractor vis-à-vis RCDF : 34.1 The equipment and items as specified in purchase order shall be supplied by RCDF for erection, installation, commissioning by the erector. 34.2 Besides the utilities/services as specified in battery limits the following shall also be provided to the erector by RCDF for carrying out the installation/erection. a) Suitable lockable space for storage of tools, tackles and erection materials (No accommodation for erectors personnel will be provided under any 52 (Signed & sealed by the tenderer in token of acceptance of above) (RCDF) Jaipur

53 circumstances) the security of these materials will be the responsibility of the erector. b) Plant building ready for installation/erection of all the equipment/items (flooring will generally be carried out after positioning of main equipment and laying of necessary conduits). c) Necessary temporary power for carrying out the installation (the power shall be supplied at only one point within the dairy site). All necessary tapping from this point onwards shall be erector‟s responsibility. d) Temporary water at one point within the site for the water required for testing etc. The erector shall arrange on his own to tap and transfer the water to the points required. 34.3 Prior Information : a) The details of temporary water and power requirements shall be furnished one month in advance by the erector to enable RCDF to make timely arrangement. b) Detailed drawings of the required main cut-outs must be supplied by the erector in advance to RCDF to provide the same at the time of civil construction. The cutting in the walls, floors etc. which are not informed earlier and required for erection work will be done by the erector and to repair the same will also be the responsibility of the erector. c) Detailed drawings and other specifications of foundation and any other special structure must be submitted by the erector within one month after award of contract to RCDF. 35.0 Damage : If the work or any portion thereof shall be damaged in any way excepting by the acts of RCDF or if defects not readily detected by prior inspection shall develop before the final completion and acceptance of the whole work. Erector shall forthwith make good, without compensation, such damage or defects in a manner satisfactory to the RCDF. In no case shall defective or imperfect work be retained. 36.0 Observation of local rules etc. In respect of observation of local rules, administrative orders, working hours, labour compensation act, applicable labour laws and the like erector and his personnel shall strictly abide by the same. (Signed & sealed by the tenderer in token of acceptance of above) (RCDF) Jaipur

f) Recharging or make-up filling of lubricant oil up to the desired level in<br />

the lubrication system of individual machine.<br />

g) Operation in empty condition to check general operation details<br />

wherever required, and wherever possible.<br />

h) Closed loop dynamic testing with water wherever required.<br />

i) Operation under load and gradual load increase to attain maximum rated<br />

output.<br />

j) Trouble shooting during the trial period.<br />

k) Guarantee of installation.<br />

32.0 Guarantee :<br />

The supply of equipment as well as installation shall have to be carried out by<br />

the erector to the entire satisfaction of the RCDF. The erector shall also<br />

guarantee to repair/replace, without any extra cost, the items or parts thereof, if<br />

found defective due to bad design, workmanship or substandard material<br />

within 12 months from the date of commissioning or 36 months from the date<br />

of receipt of material at site whichever is earlier. If it is necessary to send the<br />

defective equipment or parts thereof for repair/replacement, cost of<br />

transportation including package, insurance etc. from the site to works and<br />

back to site shall have to be borne by the erector. The guarantee does not cover<br />

any damage resulting from normal wear and tear or improper attendance or<br />

mishandling of the equipment by the RCDF.<br />

33.0 Training of personnel :<br />

Necessary staff as may be deputed by RCDF shall be trained by the erector for<br />

operating the plant. The personnel will be associated for the training during the<br />

installation, testing, commissioning and start-up period and training tenure<br />

shall be minimum for a period of one month from the date of commissioning<br />

and start-up.<br />

34.0 Outline of the scope of duties of the Contractor vis-à-vis RCDF :<br />

34.1 The equipment and items as specified in purchase order shall be supplied by<br />

RCDF for erection, installation, commissioning by the erector.<br />

34.2 Besides the utilities/services as specified in battery limits the following shall<br />

also be provided to the erector by RCDF for carrying out the<br />

installation/erection.<br />

a) Suitable lockable space for storage of tools, tackles and erection materials<br />

(No accommodation for erectors personnel will be provided under any<br />

52<br />

(Signed & sealed by the tenderer<br />

in token of acceptance of above)<br />

(RCDF)<br />

Jaipur