If erector doesn‟t comply with the direction as described above or complete the<br />

erection and commissioning by the end of 4 th week after programmed<br />

completion, RCDF will operate the penalty clause and shall also have the<br />

option to deploy their own staff/other agencies to complete the job at the<br />

erectors risk, responsibility and cost.<br />

It is however, clarified that the above or any such directions from RCDF or<br />

abstinence of RCDF in deploying their own staff/other agencies as described<br />

above shall not relieve the erector of his obligations to secure the quality, the<br />

safe conduction of work, rate of progress required and adherence to scheduled<br />

programme.<br />

IF THE ERECTOR FAILES TO <strong>CO</strong>MPLETE ERECTION IN ALL ASPECTS<br />

WITHIN THE STIPULATED PERIOD & TIME. THE ERECTOR SHALL<br />

HAVE TO PAY RUPES @ ½% PER WEEK AS PENALTY FOR THE<br />

PERIOD FOR WHICH THE WORK REMAINS IN<strong>CO</strong>MPLETE.<br />

28.0 Approvals :<br />

The erector shall obtain the necessary approval of the factory Inspector, Boiler<br />

Inspector, Electrical Inspector weights & Measures Inspector, Explosives<br />

Inspector, and any other state and local authorities as may be required. All the<br />

necessary details, drawings, submission of application and proformas will be<br />

furnished by the Erector to RCDF for rectification/signature.<br />

The necessary application duly filled in, together with the prescribed fees shall<br />

be submitted to the authorities by the erector on behalf of the RCDF. However<br />

all the actual prescribed fees paid by the erector shall be reimbursed by RCDF<br />

upon production of the receipt/vouchers of the above said authorities.<br />

RCDF shall, however, extend all possible assistance to the erector for obtaining<br />

the necessary approvals. Nevertheless the ultimate responsibility for obtaining<br />

the necessary approvals lies with the erector.<br />

29.0 Final Drawings & Manuals :<br />

The erector shall, upon completion of the job, submit six complete sets of final<br />

drawings towards the equipment layout different pipe lines, cables, conduits,<br />

layout drawings and other necessary drawings. All the drawings must conform<br />

to actual executing carried out.<br />

50<br />

(Signed & sealed by the tenderer<br />

in token of acceptance of above)<br />