23.3 Drawings submitted for approval shall be signed by responsible representatives<br />

of erector and shall be to any one of the following sizes in accordance with<br />

Indian Standards :<br />

A0, A1, A2, A3, or A4<br />

23.4 All drawings shall show the following particulars in the lower right hand<br />

corner in addition to Vendor‟s name :-<br />

a) Name of RCDF<br />

b) Project Title<br />

c) Title of Drawing<br />

d) Scale<br />

e) Date of drawing<br />

f) Drawing number<br />

g) Space for RCDF drawing number.<br />

23.5 In addition to the information provided on drawings, each drawing shall carry a<br />

revision number, date of revision and brief of revision carried out. Whenever<br />

any revision is carried out, correspondingly revision must be up dated.<br />

23.6 All dimensions on drawings shall be in metric units, unless otherwise,<br />

specified.<br />

23.7 Drawings submitted by erector for approval will be checked reviewed by<br />

RCDF and comments, if any, on the same will be conveyed to erector. It is the<br />

responsibility of the rector to incorporate correctly all the comments conveyed<br />

by RCDF on erector‟s drawings. The drawings which are approved with<br />

comments are to be resubmitted to RCDF for purpose of records. Such<br />

drawings will not be checked/reviewed by RCDF to verify whether all the<br />

comments have been incorporated by the erector. If erector is unable to<br />

incorporate certain comments in his drawings, he shall clearly state in his<br />

forwarding letter such non-compliance along with the valid reasons.<br />

23.8 Upon completion of the installation, erector shall make in a neat and accurate<br />

manner, a complete record of all changes and revision to the original design, as<br />

installed in the complete work. Six copies of these drawings shall be submitted<br />

to RCDF for records and these becomes the property of RCDF.<br />

23.9 Drawings prepared by erector and approved by RCDF shall be considered as a<br />

part of the specifications. However, the examination and approval of the<br />

drawings by RCDF shall not relieve erector of his responsibility for<br />

engineering, design, workmanship and material under the contract.<br />

46<br />

(Signed & sealed by the tenderer<br />

in token of acceptance of above)<br />

(RCDF)<br />