45<br />

21.6 Erector shall furnish RCDF a fortnightly labour force report showing by<br />

classifications the number of employees engaged in the work. Erector‟s<br />

employment records shall include any reasonable information as may be<br />

required by RCDF. The erector should also display necessary information as<br />

may be required by statutory regulations.<br />

21.7 None of the erector‟s superintendents, supervisors, engineers, or labour may be<br />

withdrawn from the work without the notice given to RCDF and further no<br />

such withdrawals shall be made if in the opinion of RCDF, it will jeopardise<br />

the required pace of progress and/or the successful completion of the work.<br />

21.8 RCDF shall be at liberty to object to any representatives or person or skilled,<br />

semiskilled or unskilled worker employed by the erector in the execution, or<br />

otherwise, of the worker who shall misconduct himself, or be incompetent, or<br />

negligent or unsuitable and erector shall remove the person so objected to upon<br />

receipt of notice in writing from RCDF requiring him to do so and shall<br />

provide in his place a competent representative at his own expense within<br />

reasonable time.<br />

22.0 Construction, Electric Power & Water :<br />

Electric power and water will be made available for use by RCDF free of cost.<br />

These supplies will be made, where available at one central point in the site<br />

convenient to RCDF and all piping for service water to work area shall be<br />

furnished, installed and maintained by erector at his own expense. He shall also<br />

furnish, install and maintain at his cost the power lines, junction boxes and any<br />

other electrical receptacles, apparatus or equipment from the central point of<br />

his work area.<br />

23.0 Drawings :<br />

23.1 Within three weeks from the date of receipt of the order, erector shall submit<br />

list of necessary drawings as mentioned in 1.5, that he proposes to submit for<br />

approval, identifying each by a serial number and descriptive, title and giving<br />

the expected date of submission. This list shall be revised and extended, as<br />

necessary during the progress of work.<br />

23.2 Erector shall also submit copies of design calculations, material specification<br />

and detailed drawings as called for in the equipment specifications for RCDF<br />

review. Erector must satisfy RCDF as to the validity of his design with<br />

reference to the requirement of statutory Code Authorities.<br />

(Signed & sealed by the tenderer<br />

in token of acceptance of above)<br />

(RCDF)<br />