21.6 Erector shall furnish RCDF a fortnightly labour force report showing by<br />
classifications the number of employees engaged in the work. Erector‟s<br />
employment records shall include any reasonable information as may be<br />
required by RCDF. The erector should also display necessary information as<br />
may be required by statutory regulations.<br />
21.7 None of the erector‟s superintendents, supervisors, engineers, or labour may be<br />
withdrawn from the work without the notice given to RCDF and further no<br />
such withdrawals shall be made if in the opinion of RCDF, it will jeopardise<br />
the required pace of progress and/or the successful completion of the work.<br />
21.8 RCDF shall be at liberty to object to any representatives or person or skilled,<br />
semiskilled or unskilled worker employed by the erector in the execution, or<br />
otherwise, of the worker who shall misconduct himself, or be incompetent, or<br />
negligent or unsuitable and erector shall remove the person so objected to upon<br />
receipt of notice in writing from RCDF requiring him to do so and shall<br />
provide in his place a competent representative at his own expense within<br />
reasonable time.<br />
22.0 Construction, Electric Power & Water :<br />
Electric power and water will be made available for use by RCDF free of cost.<br />
These supplies will be made, where available at one central point in the site<br />
convenient to RCDF and all piping for service water to work area shall be<br />
furnished, installed and maintained by erector at his own expense. He shall also<br />
furnish, install and maintain at his cost the power lines, junction boxes and any<br />
other electrical receptacles, apparatus or equipment from the central point of<br />
his work area.<br />
23.0 Drawings :<br />
23.1 Within three weeks from the date of receipt of the order, erector shall submit<br />
list of necessary drawings as mentioned in 1.5, that he proposes to submit for<br />
approval, identifying each by a serial number and descriptive, title and giving<br />
the expected date of submission. This list shall be revised and extended, as<br />
necessary during the progress of work.<br />
23.2 Erector shall also submit copies of design calculations, material specification<br />
and detailed drawings as called for in the equipment specifications for RCDF<br />
review. Erector must satisfy RCDF as to the validity of his design with<br />
reference to the requirement of statutory Code Authorities.<br />
(Signed & sealed by the tenderer<br />
in token of acceptance of above)<br />
(RCDF)<br />
Jaipur