44<br />

supervisors, and engineers of all classes for the duration of the work to<br />

maintain the rate of erection in accordance with the requirement of the<br />

schedule of completion, and shall be in the work included in the contract at<br />

such times as will ensure its completion as specified and shall complete the<br />

same force of all lines and charged, at or before the time specified for<br />

completion. Erector shall make available qualified engineers for placing the<br />

equipment in operation and carrying out the necessary tests and trials.<br />

Conducts required of erector‟s men are specified below :<br />

21.1 It is important that erector shall employ men known to be reliable and<br />

competent for the work in general and it shall be requirement of the contract<br />

that men used on special works shall be competent, well trained and trusted<br />

employees.<br />

21.2 Erector shall furnish details of the qualifications and experience of his senior<br />

supervisors and engineers assigned to the work including their experience in<br />

supervising erection and commissioning of plant and equipment of comparable<br />

capacity.<br />

21.3 Erector shall be personally present or employ at least one competent<br />

representative (whose name shall have previously been communicated in<br />

writing to RCDF to supervise the erection of the equipment and carrying out<br />

the work under the contract. This representative shall have full technical<br />

capability and complete administrative and financial powers to expeditiously<br />

and efficiently execute the work under the contract. Erector or his<br />

representative or if more than one be employed, one of the representative shall<br />

be present at the site at all times when work is in progress, and any written<br />

orders or instructions which RCDF may give to the said representative of<br />

erector shall deemed to have been given to the erector. He shall maintain an<br />

office near/or adjacent to the site of the work, and shall at all times keep in<br />

office a complete set of specifications and drawings. RCDF shall normally<br />

communicate directly with the said representative at site.<br />

21.4 Erector‟s representative at the site shall be posted and be available at site<br />

within a reasonable time after RCDF shall inform erector in writing to the<br />

effect. The service of erector‟s representatives shall be made available during<br />

the progress of the work for such periods during the working days as RCDF<br />

may require.<br />

21.5 When erector or his representative is not present on any part of the work where<br />

it may be desired to give directions in the event of emergencies, orders may be<br />

given by RCDF and shall be received and obeyed by the supervisors or<br />

foreman who may have charge of the particular part of the work in reference to<br />

which order given. If requested to do so, RCDF shall confirm such orders in<br />

writing. Any such instruction, direction or notices given by RCDF shall be held<br />

to have been given to the erector.<br />

(Signed & sealed by the tenderer<br />

in token of acceptance of above)<br />

(RCDF)<br />

Jaipur

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!