18.13 Inspection of work :<br />

RCDF of any person appointed by them shall have access and right to inspect<br />

the work, or any part thereof at all times and places during the progress of the<br />

work. The inspection and supervision is for the purpose of assuring RCDF that<br />

the plans and specifications are being properly executed and while RCDF and<br />

their representatives will extend to the erector all desired assistance in<br />

interpreting the plan and specifications, such assistance shall not relieve erector<br />

of any responsibility for the work. Any work which proves faulty shall be<br />

corrected by erector without delay. The fact that RCDF or their representatives<br />

have not pointed out faulty work or work which is not in accordance with plans<br />

and specifications shall not relieve the erector from correcting such work as<br />

directed by RCDF without additional compensation. RCDF their<br />

representatives and the employees shall at all reasonable times have free access<br />

to the works and/or to the workshop factories or other places where materials<br />

are being prepared or constructed or fabricated for the contract and also to any<br />

place where the materials are lying or from where they are being obtained and<br />

erector shall give every facility to RCDF and his representative for inspection<br />

examination and test of the materials and workmanship even to the extent of<br />

discontinuing portion of the work temporarily or of uncovering or taking down<br />

portion of finished work.<br />

19.0 Protection to Plant :<br />

19.1 Except in case where RCDF‟s express permission, is applied for and received<br />

in writing no use of RCDF‟s plant facilities such as cranes, passenger elevator,<br />

toilets showers or machine shop etc. shall be made by erector or his employees.<br />

19.2 RCDF shall not be responsible or held liable for any damage to person or<br />

properly consequent upon the use, misuse or failure of any construction tools<br />

and equipment used by erector of any of his subcontractors, even though such<br />

constructions tools and equipment may be furnished rented or loaned to erector<br />

or any of this contractors. The acceptance and/or use of any such constructions<br />

tools and equipment by erector or his subcontractor shall be constructed to<br />

mean that erector accepts all responsibility for and agrees to indemnify and<br />

save harmless RCDF from any and all claims for said damages resulting from<br />

said use, misuse or failure of such construction tools and equipments.<br />

19.3 Erector and his subcontractors shall be responsible during work for protection<br />

of the work which has been completed by other contractors/suppliers.<br />

Necessary care shall be taken to see that no damage to the same is caused by<br />

his own men during the course of execution of their work.<br />

19.4 All other work completed or in progress as well as machinery and equipment<br />

that are liable to be damaged by erector‟s work shall be protected by erector<br />

and such protection shall remain and be maintained until its removal is directed<br />

by RCDF.<br />

42<br />

(Signed & sealed by the tenderer<br />

in token of acceptance of above)<br />

(RCDF)<br />

Jaipur