18.0 Erection & Inspection :<br />

18.1 Erector shall prepare a detailed and comprehensive erection schedule for<br />

review and approval of RCDF‟s site Engineer and supplier‟s erection<br />

supervisors. This „Approved‟ erection schedule shall form the basis for<br />

evaluating the pace of all the erection works to be performed by erector.<br />

18.2 The schedule shall show approximately the date on which each part of<br />

divisions of the work is expected to begin based on his knowledge of the works<br />

of the other contractors and the date when the work is schedules to be finished.<br />

Upon the request of RCDF erector should be prepared to discuss his schedule<br />

in relation to the master schedule and shall co-ordinate his work with that of<br />

the other erectors/contractors as determined by RCDF.<br />

18.3 The work so far as it is carried out on RCDF‟s promised shall be carried out at<br />

such time as RCDF may approve consistent with the construction schedule and<br />

so as not to interfere unnecessarily with the conduct of RCDF‟s business and<br />

RCDF will give erector all reasonable assistance for carrying out the work.<br />

18.4 Erector shall revise and up date his erection schedule periodically (atleast once<br />

every calendar month) to indicate actual progress of works, in relation to<br />

scheduled progress. Erector shall also submit monthly progress reports<br />

indicating progress work giving scheduled and actual percentage completions,<br />

causes for delay etc. as well as such other reasonable reports RCDF may<br />

request from time to time.<br />

18.5 Adherence to the instructions of supervisory engineers of manufacturers, where<br />

provided by RCDF is compulsory. Erector shall work as per the procedure<br />

suggested by manufacturer and shall complete erection of equipment in such a<br />

way so as not to interfere with or prevent equipment from functioning as<br />

intended, as well as to the entire satisfaction of the manufacturer‟s<br />

supervisor/RCDF. Erector shall also permit and provide all facilities for<br />

manufacturer‟s erection super visors to carry out all checks that they may wish<br />

to and approve any erection procedure and/or final setting and alignment of<br />

components, in order to satisfy themselves that erection has been carried out as<br />

intended by them. This shall, however, in no way relieve erector of his<br />

responsibility for providing adequate and competent supervision and quality<br />

workmanship. In case of any dispute, the decision of the RCDF/Manufacturer‟s<br />

erection supervisor shall be final and binding on the erector.<br />

18.6 Erector shall haul materials and equipment furnished at RCDF‟s storage or<br />

unloading areas to the points where they are to be used, in the construction<br />

work, install the materials and equipment in their final location and classify<br />

and store all surplus and auxiliary parts in a systematic manner in the<br />

warehouse, where they can be readily identified and located when needed at a<br />

later date.<br />

40<br />

(Signed & sealed by the tenderer<br />

in token of acceptance of above)<br />

(RCDF)<br />

Jaipur