38<br />

12.5 Machinery Foundation :<br />

All the civil foundations as per the drawings furnished by the<br />

manufactures/suppliers shall be arranged by RCDF. The erector shall place the<br />

equipment on the foundations and carry out final adjustment of the foundations<br />

alignment dressing of foundation surface, providing and grouting of anchor<br />

bolts pockets etc. and set the equipment properly as per approved layout<br />

drawing and manufacture instructions.<br />

12.6 Structural Platform :<br />

Supply of all necessary materials and installation of structural platforms,<br />

structural supports and access arrangement required for the various equipment<br />

is included within the scope of mechanical installation and should be so carried<br />

out that all operation can be easily manoeuvred.<br />

The details and drawings in regard of the platforms shall be worked<br />

out/prepared by the erector and submitted to the RCDF for approval. The items<br />

should be executed as per the approval details drawing. The payment will be<br />

made on the basis of cost per unit weight as offered by erector and accepted by<br />

RCDF.<br />

13 For Erection & Commissioning :<br />

The erector will be required to take a „storage-cum-erection‟ insurance for the<br />

items to be erected and commissioned by him. For this insurance premium<br />

shall however be reimbursed to him by the buyer. In case, the erector is not<br />

able to arrange insurance at reasonable rates acceptable to the buyer, the buyer<br />

shall arrange the same on behalf of the erector. However, in the event of any<br />

loss/damage to the equipment during storage or erection and commissioning,<br />

the erector alone shall have to lodge the claims with underwriters and pursue<br />

the same till settlement irrespective of the fact whether the insurance policy is<br />

taken by the erector or arranged by the buyer on his behalf. Further, it shall be<br />

sole responsibility of the erector to make good the losses/damages<br />

expeditiously without any extra cost to the buyer.<br />

14. All the equipment/machineries including motors, pumps, starters, junction<br />

boxes, isolators, and boxes, tanks supporting structures, pipe supports and<br />

brackets of MS, GI, Pipes which are not insulated and all exposed and visible<br />

cost Iron parts shall be given a double coat of anticorrosive primers. MS and<br />

GI parts (within the building) should be given a final coat of paint of approved<br />

shade. However, if so instructed by RCDF in respect of certain particular<br />

items/equipments, the erect should touch up breaches in the paintings. All<br />

surfaces must be properly cleaned and all scale, dirt and grease should be<br />

removed prior to painting. Spray painting must preferably be used on all the<br />

equipment, machineries and wherever else practicable. Suitable and necessary<br />

cleaning/wiping of slight/dial glasses, other non-metallic parts, flooring, walls<br />

(Signed & sealed by the tenderer<br />

in token of acceptance of above)<br />

(RCDF)<br />

Jaipur