12<br />

thereafter make good in cash endorsed as aforesaid any sum or sums which<br />

may have been deducted from or raised by sale of his security deposit or any<br />

part thereof.<br />

2.12 No refund of tender fee is claimable for tenders not accepted or Forms returned or<br />

tenders not submitted.<br />

2.13 SPECIAL NOTES TO TENDERER<br />

2.14 PRE BID <strong>CO</strong>NFERENCE :<br />

Pre bid conference dates for the equipments are given in the NIT. The tenderers can<br />

seek any clarifications in the Pre-bid conference on the tenders they intend to<br />

participate in, and so the tenderers are advised to depute their authorised<br />

representative to attend the same, without fail.<br />

2.15 After scrutiny of the technical bids, the clarifications, if any, will be obtained from<br />

the bidders during the technical discussions. The tenderers are advised to depute<br />

their authorised representative for the technical discussions on the date and time as<br />

informed by the RCDF. The bids of the tenderers, who fail to depute their<br />

representative as above shall be liable for rejection. In case it is necessary to<br />

obtain revised prices from the bidders the same shall be done by asking all the<br />

concerned bidders to submit the revised price bids in sealed covers, and the earlier<br />

price bids will become invalid. In case all the tenderers submit the price bids on the<br />

same day after freezing of technical requirements the bids shall be opened on the<br />

same day. In case one or more of the eligible tenderers, consequent to technical<br />

discussions and technical details frozen, desire to revise their price bid, they can do<br />

so on the same day or at the most the next working day of the technical discussions<br />

and the bids in such event shall be opened on the next day in the presence of such<br />

representative of the tenderers who wish to be present. Normally one representative<br />

of participating bidder will be allowed.<br />

3.0 S<strong>CO</strong>PE OF TENDER.<br />

3.1 Supply :<br />

The suppliers shall supply the material/articles in accordance with<br />

specifications stipulated for the article in the tender at ANNEXURE –X.<br />

3.1.1 Erection, Testing & Commissioning:<br />

The tenders shall erect/install the equipment in accordance with the terms and<br />

conditions/specifications stipulated in Schedules of the tender.<br />

3.2 Spare Parts :<br />

The tenders shall submit a recommended list of spare parts alongwith the price<br />

valid for one year for each items of the equipment which would be reasonable<br />

to anticipate as necessary, to enable the equipment to be operated and<br />

maintained in a satisfactory manner for a period of 24 calendar month from the<br />

date of commissioning.<br />

3.2.1 The cost of spare parts will not be considered in evaluating the tenders.<br />

3.2.2 The prices thus quoted for the spares should be valid for 12 calendar months<br />

from the date of opening of the tender.<br />

(Signed & sealed by the tenderer<br />

(RCDF)<br />

in token of acceptance of above)<br />

Jaipur