20.08.2015 Views

Feed-in Tariff Application Form

Feed-in Tariff Application Form - British Gas

Feed-in Tariff Application Form - British Gas

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Energy Efficiency DetailsEnergy PerformanceCertificate (EPC) number:Date EPC issued:If EPC cannot be issued is a copy ofa non relevant build<strong>in</strong>g letter attached? Yes NoGenerator Equipment DetailsFor more <strong>in</strong>formation relat<strong>in</strong>g to your TIC or DNC you will need to contact your <strong>in</strong>staller.Technology (E.g. PV, MCHP, W<strong>in</strong>d, Hydro):For PV total number of panels <strong>in</strong>stalled:For PV <strong>in</strong>dividual wattage of panels (kW):Total Installed Capacity (TIC), kW:NB: The Total Installed Capacity of a PV <strong>in</strong>stallation is determ<strong>in</strong>ed by multiply<strong>in</strong>g the number of panels by the <strong>in</strong>dividual wattage of the panels. For example: 10 panelsat 200 watts would give a total <strong>in</strong>stalled capacity of 2.00kW.Declared net capacity (kW):Property type: New build Old buildInstallation date: / /Is your Generation equipment wired toprovide electricity to a relevant build<strong>in</strong>g? YesNoIf you have any other <strong>in</strong>stallationsat the address, please provide details:Accreditation DetailsIf your <strong>in</strong>stallation is smaller than 50kW, then you must provide an MCS Certification Number.MCS Certificate Number:(E.g. MCS-00000000-L)M C S – –Date MCS issued: / /Generation Meter DetailsYou must have an approved Generation Meter to qualify for <strong>Feed</strong>-<strong>in</strong> <strong>Tariff</strong>s. If your <strong>in</strong>stallation is smaller than 30kW, and you do nothave an Export Meter you must provide meter read<strong>in</strong>gs on the date of application.Generation MeterSerial Number:Number of digits on meter:(5 or 6 before decimal po<strong>in</strong>t)Generation Meter Read<strong>in</strong>g:(On date application completed)Manufacturer of meter(E.g. Elster/Landis&Gyr/GEC):Type of meter:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!