20.08.2015 Views

Feed-in Tariff Application Form

Feed-in Tariff Application Form - British Gas

Feed-in Tariff Application Form - British Gas

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Feed</strong>-<strong>in</strong> <strong>Tariff</strong> <strong>Application</strong> <strong>Form</strong>British Gas is a mandatory <strong>Feed</strong>-<strong>in</strong> <strong>Tariff</strong> licensee.By complet<strong>in</strong>g this form I confirm I would like British Gas to be my <strong>Feed</strong>-<strong>in</strong> <strong>Tariff</strong> supplier.Personal Details of owner of generation equipmentPlease ensure the generation address is registered with the Post Office. If the address has not been registered this may cause delayswith the <strong>in</strong>stallation be<strong>in</strong>g added to the Ofgem Central FiT Register.Full name/Company name:(One person/name only)Address:Postcode:Telephone numbers: Home MobileEmail address:Please select a passwordfor your account:(6–8 characters)Commercial orResidential <strong>in</strong>stallation: Commercial ResidentialIf Commercial please providethe VAT registration number:Have you received a grant: Yes NoIf Yes, please provide details:Did British Gas <strong>in</strong>stall yourgenerat<strong>in</strong>g equipment: Yes NoBritish Gas Customer: Yes NoBritish Gas Account Number:British Gas Customer Reference Number:Generator Address Details (if different from above)If there is no postcode, enter the Ord<strong>in</strong>ance Survey Grid Reference.Address:Postcode:


Energy Efficiency DetailsEnergy PerformanceCertificate (EPC) number:Date EPC issued:If EPC cannot be issued is a copy ofa non relevant build<strong>in</strong>g letter attached? Yes NoGenerator Equipment DetailsFor more <strong>in</strong>formation relat<strong>in</strong>g to your TIC or DNC you will need to contact your <strong>in</strong>staller.Technology (E.g. PV, MCHP, W<strong>in</strong>d, Hydro):For PV total number of panels <strong>in</strong>stalled:For PV <strong>in</strong>dividual wattage of panels (kW):Total Installed Capacity (TIC), kW:NB: The Total Installed Capacity of a PV <strong>in</strong>stallation is determ<strong>in</strong>ed by multiply<strong>in</strong>g the number of panels by the <strong>in</strong>dividual wattage of the panels. For example: 10 panelsat 200 watts would give a total <strong>in</strong>stalled capacity of 2.00kW.Declared net capacity (kW):Property type: New build Old buildInstallation date: / /Is your Generation equipment wired toprovide electricity to a relevant build<strong>in</strong>g? YesNoIf you have any other <strong>in</strong>stallationsat the address, please provide details:Accreditation DetailsIf your <strong>in</strong>stallation is smaller than 50kW, then you must provide an MCS Certification Number.MCS Certificate Number:(E.g. MCS-00000000-L)M C S – –Date MCS issued: / /Generation Meter DetailsYou must have an approved Generation Meter to qualify for <strong>Feed</strong>-<strong>in</strong> <strong>Tariff</strong>s. If your <strong>in</strong>stallation is smaller than 30kW, and you do nothave an Export Meter you must provide meter read<strong>in</strong>gs on the date of application.Generation MeterSerial Number:Number of digits on meter:(5 or 6 before decimal po<strong>in</strong>t)Generation Meter Read<strong>in</strong>g:(On date application completed)Manufacturer of meter(E.g. Elster/Landis&Gyr/GEC):Type of meter:


Export Meter DetailsIf you do not have an Export Meter and your <strong>in</strong>stallation is lower than 30kW then you will receive deemed export payments fromBritish Gas <strong>Feed</strong>-<strong>in</strong> <strong>Tariff</strong> unless you <strong>in</strong>dicate ‘no’ <strong>in</strong> the details below. If your <strong>in</strong>stallation is larger than 30kW and you require exportpayments from British Gas <strong>Feed</strong>-<strong>in</strong> <strong>Tariff</strong>, you must have a compliant half hourly Export Meter <strong>in</strong>stalled and registered to British Gas.Do you require exportpayments from British Gas?(Installations above 30kW) Yes NoDo you have an export meter: Yes NoExport Meter Serial Number:Number of digits on meter:(5 or 6 before the decimal po<strong>in</strong>t)Export Meter Read<strong>in</strong>g:(On date application completed)Manufacturer of meter(E.g. Elster/Landis&Gyr/GEC):Signature:Date signed: / /Gett<strong>in</strong>g it right• Please check all sections of the application formare accurate and correctly completed and you havesigned and dated the form• The eligibility date for <strong>Feed</strong>-<strong>in</strong> <strong>Tariff</strong> payments willonly commence from the date that we receive youraccurate and correctly completed application andall relevant support<strong>in</strong>g documentation• If you make a mistake on this form and/or if you donot enclose ALL the relevant support<strong>in</strong>g documentationthis will affect your eligibility date• Have you <strong>in</strong>cluded the correct support<strong>in</strong>g documents:• Copy of your MCS Certificate/Number• Copy of your F<strong>in</strong>al Paid Invoice (or proof of paymentand ownership of the <strong>in</strong>stallation)• Copy of your Energy Performance Certificate †(EPC) (for Solar PV <strong>in</strong>stallations) or non-relevant build<strong>in</strong>gletter if EPC Certificate cannot be issued• A signed and dated multi site and energy efficiency SolarPV Declarations (new <strong>in</strong>stallations and extensions) <strong>Form</strong>You can email these documents to us at customer.service@contactus.britishgas.co.uk or post them to:British Gas (<strong>Application</strong>s), <strong>Feed</strong>-<strong>in</strong> <strong>Tariff</strong> Team, Unit 5, Nimbus Park, Porz Avenue, Houghton Regis, Dunstable LU5 5FR.You can also call us on 0800 072 8283 * .† NOTE: If you have a Solar PV <strong>in</strong>stallation that is eligible for <strong>Feed</strong>-<strong>in</strong> <strong>Tariff</strong> payments, on or after 1st April 2012 the amount of <strong>Feed</strong>-<strong>in</strong> <strong>Tariff</strong> payments you will be entitled toreceive will depend on the energy-efficiency rat<strong>in</strong>g of your property. Without this document you will still receive <strong>Feed</strong>-<strong>in</strong> <strong>Tariff</strong> payments but at a lower tariff.If you choose to return the application to us via email or post, the application needs to be completed and returned on the date the <strong>in</strong>stallation was commissioned. If yourapplication is received after your commission<strong>in</strong>g date you may be required to provide a further read<strong>in</strong>g to be used to register your account. The fastest way to register is tosend your application to customer.service@contactus.britishgas.co.uk* Calls are free from a BT Call<strong>in</strong>g Plan. Mobile and other providers’ charges may vary. L<strong>in</strong>es are open from 8am-8pm Monday to Friday, and 8am-2pm Saturdays.If you are hard of hear<strong>in</strong>g or speech impaired and use a textphone, please call 18001 0800 072 8626.The below 3 statements only apply to customers that have received Grants:1. You are unlikely to get grants and FIT totall<strong>in</strong>g €200,000 with<strong>in</strong> 3 years.2. The total value of public f<strong>in</strong>ancial assistance you have received <strong>in</strong> relation to any economic activities – this relates to any grants received from a public body and is not limitedto grants received for the <strong>in</strong>stallation – has not exceeded the de m<strong>in</strong>imis aid levels of support, and the comb<strong>in</strong>ation of the grants you have received and the maximumexpected FiTs payments (export and generation tariffs) will similarly not exceed the de m<strong>in</strong>imis levels of support.3. You confirm that you will notify Ofgem or your FiTs licensee (i.e. British Gas) immediately if the de m<strong>in</strong>imis levels of support are exceeded or if you th<strong>in</strong>k they are likely to beexceeded. Please see the terms and conditions for more details.29018201British Gas is the trad<strong>in</strong>g name of British Gas New Heat<strong>in</strong>g LimitedRegistered <strong>in</strong> England No. 6723244. Registered Office: Millstream, Maidenhead Road, W<strong>in</strong>dsor, Berkshire SL4 5GD. britishgas.co.uk

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!