17.08.2015 Views

4 bi THE PARTICULARS OF ITS ORGANISATION, FUNCTIONS ...

4 bi THE PARTICULARS OF ITS ORGANISATION, FUNCTIONS ...

4 bi THE PARTICULARS OF ITS ORGANISATION, FUNCTIONS ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

This project was sanctioned by NABARD vide No.NB./CHG/RIDF-VIII/178/HR-801 2002 -03 dated 25.06.2002.Total Works 20Completed Works 18Work in Progress 4ProjectCost Initial(Rs. inLacs)ProjectcostExpected(Rs. inLacs)Loan Composition(Rs. in Lacs)Nabard Sate Share(90%) (10%)Expenditureso far(Rs. inLacs)TotalLength (inKm.)2129.74 2129.74 1916.76 212.98 2052.09 -RIDF-IXThis project was sanctioned by NABARD vide No.NB.SPD/1800/RIDF-IX(Haryana) /69 &70 PSC /2003-04 dated 20.02.2004 & 04.03.2004 respectively.Total Works 71Completed Works 69Work in Progress 2ProjectCost Initial(Rs. inLacs)ProjectcostExpected(Rs. inLacs)Loan Composition(Rs. in Lacs)Nabard Sate Share(80%) (20%)Expenditureso far(Rs. inLacs)TotalLength (inKm.)15741.98 15741.98 12593.51 3148.38 12500.64 665.20RIDF-XIThis project was sanctioned by NABARD vide No.NB.SPD/629/RIDF-XI(Haryana) /78PCS /2005-06 dated 22.07.2005.Total Works 53Completed Works 33Work in Progress 20ProjectCost Initial(Rs. inLacs)ProjectcostExpected(Rs. inLacs)Loan Composition(Rs. in Lacs)Nabard Sate Share(80%) (20%)Expenditureso far(Rs. inLacs)TotalLength (inKm.)19649.87 24082.76 19266.20 4816.56 16684.45 667.00RIDF-XIIIThis project was sanctioned by NABARD vide No.NB.SPD/1201/RIDF-XIII(Haryana) /92PSC /2007-08 dated 21.11.2007.Total Works 3Completed WorksNilWork in Progress 3ProjectCost Initial(Rs. inLacs)ProjectcostExpected(Rs. inLacs)Loan Composition(Rs. in Lacs)Nabard Sate Share(80%) (20%)Expenditureso far(Rs. inLacs)TotalLength (inKm.)25.04 25.04 20.03 5.01 Nil 53.00

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!