17.08.2015 Views

4 bi THE PARTICULARS OF ITS ORGANISATION, FUNCTIONS ...

4 bi THE PARTICULARS OF ITS ORGANISATION, FUNCTIONS ...

4 bi THE PARTICULARS OF ITS ORGANISATION, FUNCTIONS ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sr.NoNHNo.O. Road Safety & EnvironmentTotal 1.00 1.00P Misc.Total 1.00 1.00G.Total 169.45 126.78Approved Annual Plan for 2008-09 for National Highway.Works included in sanctioned Annual Plan for 2008-09.Name of WorksLengthKm /No.AppxCost( in cr.)RefrencePosition of estimateAmountA. Expressway(i) FS/ Detailed EngineeringSub Total 0.00 0.00(ii) L.A.Sub Total 0.00 0.00(iii) ConstructionSub Total 0.00 0.00Total 0.00 0.00B. Four Laning(i) FS/ Detailed EngineeringSub Total 0.000 0.00(ii) L.A.Sub Total 0.000 0.00(iii) Construction65 Km. 103.00 to 105.50 near vill. Kalayat 2.500 5.0073A Km. 2.60 o 5.50 (Jagadhari City). 2.900 6.0073A Km. 26.100 to 27.600 (Khizrabad town portion) 1.500 3.0010 Km. 252.000 to 254.850 2.850 4.00Sub Total 9.750 18.00Total 9.750 18.00C. Bypasses(i)FS/ Detailed EngineeringSub Total 0.000 0.00(ii) L.A.Sub Total 0.000 0.00(iii) ConstructionSub Total 0.000 0.00Total 0.000 0.00D. ROBs/RUBs / Flyover cum ROB.(i) FS/ Detailed EngineeringSub Total 0 0.00(ii) L.A.Sub Total 0 0.00(iii) Construction10 Constn. of ROB at Dabwali at RD 315.25. 1 20.00Sub Total 1 20.00Total 1 20.00E. Missing Link/New National Highways.(i) FS/ Detailed EngineeringSub Total 0.000 0.00(ii) L.A.Sub Total 0.000 0.00(iii) ConstructionSub Total 0.000 0.00Total 0.000 0.00F Widening to two lane & Strengthening i/c Improvements65 Km. 77.150 To 88.135 Kaithal Byepass (10mtr) 10.985 11.0071B Km. 44.00 to 50.784 26.366 13.00Total 37.351 24.00G. Widening to two lane with Geometric ImprovementsTotal 0.000 0.00

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!