17.08.2015 Views

4 bi THE PARTICULARS OF ITS ORGANISATION, FUNCTIONS ...

4 bi THE PARTICULARS OF ITS ORGANISATION, FUNCTIONS ...

4 bi THE PARTICULARS OF ITS ORGANISATION, FUNCTIONS ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Approved Annual Plan for 2007-08 for National Highway.Works included in sanctioned Annual Plan for 2007-08.Sr.NoNHNo.Name of WorksLengthin Km / No.Appx Cost( in cr.)A. Expressway(i) FS/ Detailed EngineeringSub Total 0.00 0.00(ii) L.A.Sub Total 0.00 0.00(iii) ConstructionB. Four LaningSub Total 0.00 0.00Total 0.00 0.00(i) FS/ Detailed EngineeringSub Total 0.000 0.00(ii) L.A.Sub Total 0.000 0.00(iii) Construction64 Four laning from Km. (Punjab-Haryana Border to Dabwali) 0.480 1.2510 Four laning from Km.224.600 to 226.600 (Vill. Dariyapur). 2.000 3.25C. BypassesSub Total 2.480 4.50Total 2.480 4.50(i)FS/ Detailed EngineeringSub Total 0.000 0.00(ii) L.A.Sub Total 0.000 0.00(iii) ConstructionSub Total 0.000 0.00Total 0.000 0.00D. ROBs/RUBs / Flyover cum ROB.(i) FS/ Detailed EngineeringSub Total 0.000 0.00(ii) L.A.Sub Total 0 0.00(iii) Construction10 ROB in Sirsa Town at RD 255.850 over lavel crossing1 20.00no.143.Sub Total 1 20.00Total 1 20.00

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!