Overview The following document provides additional information ...
Overview The following document provides additional information ...
Overview The following document provides additional information ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
• <strong>The</strong> supply, installation, commissioning and subsequent dismantlingpost Event of PABX telephone services for:– Client’s offices;– Contractor’s areas;– Emergency Coordination Centre (Cox/McKenzie Pavilion);– Engineering Site Office complex;– Engineering Operations Centre facility;– Hot Lines;– Media Services (external to the Pit Buildings Complex);– Medical Centre;– National Race Paddock;– Permanent Sports Pavilion Buildings (excluding the Pit Buildingscomplex);– other (as specified herein or subsequently ordered).• <strong>The</strong> final inter-frame wiring jumpering (connections) at theCustomer’s MDF (BD) for all PABX services within the areas coveredby this Contract. <strong>The</strong> Contractor shall generate and record thecable connection details on record sheets and include theserecords into the ‘as-built’ <strong>document</strong>ation;• Building telephone services block and distribution cabling systemsincluding cabling, Intermediate Distribution Frame (IDF), FinalDistribution Panels (FDPs), and new outlet sockets;• Re-termination of existing cabling to temporary facilities;• Miscellaneous cables required to service socket outlets accordingto schematics and floor plans;• Provision of “As Built” <strong>document</strong>ation and drawings including thecable route plans with cable sizes (number of pairs) and therelevant EMAC Nos. served;• Provision of complete infrastructure materials inventory list forcables and equipment;• Provision of testing and completion of test records of all cabling atcompletion of works as specified in this Specification<strong>The</strong> Scope of Services<strong>The</strong> Scope of Services required under this Contract shall include, butnot be limited to:• Preparation and implementation of Quality Systems, ContractHSE Plan and detailed construction schedules;