30.07.2015 Views

Raised access floors - Butech

Raised access floors - Butech

Raised access floors - Butech

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ComponentsSteps for a successful installationStep 1:Cli-ker n exterior is a system that adapts to the existing slopes. We recommendthat the slope lines be marked to make installation easier,and to redefine the surface. Start installation from the lowest point.Cli-ker n exterior baseFinishing profileStep 2:The tiles must be cut using a tile cutter or a radial saw. To install thecut pieces, use the bases instead of the joining pieces.Glue the bases to the back of the cli-ker piece with P-404 mastic.Step 3:When the cli-ker n exterior system finishes against a wall, column oother obstacles that do not allow to install the joining piece, cut itwith a hand saw or radial saw.P-404 masticJoining pieceStep 4:To reduce the small level defects that might be found on the supporton which we are going to install the system, lower the base of thecli-ker n exterior. In case you need to slightly raise the tile, place acompensation piece on the joining piece.Compensation piecePlugPass 5:The finishing pieces are stainless steel “L” profiles that will be installedover the perimeter of the surface formed by cli-ker n exterior. Forinstallation, cut the profile to size and fit it on the edge of the cli-kern exterior.Step 6:The finishing profile must be glued to the cli-ker n exterior piece withP-404 mastic.Step 7:To allow for water evacuation, the profile must not cover the full lengthof the piece.5253

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!