RoadRunner Owner's Manual - Data I/O Corporation
RoadRunner Owner's Manual - Data I/O Corporation RoadRunner Owner's Manual - Data I/O Corporation
Installation • Mounting the RoadRunner •• Mounting RoadRunner [Siemens SIPLACE X2, X3, X4, X4i]2Figure 2-25—The SMT Adapter on SIPLACE X RoadRunner mates with ribson the Feeder Bank.2. Make sure that the SMT latches onto the RoadRunner, and thatRoadRunner is secure.Connect the communications cable (described in “Siemens SIPLACE XSeries Communications” on page 2-29).Remember to remove RoadRunner from the Feeder Cart prior to removingthe Feeder Cart from the SIPLACE Machine.Data I/O • ProLINE-RoadRunner Owner’s Manual • 096-0240 [updated Mar2010] 2—21
Installation • Mounting the RoadRunner •• Mounting RoadRunner [Universal GSM1,GSM2, Genesis]Mounting RoadRunner [Universal GSM1,GSM2, Genesis]2CAUTION: Heavy weight. Use great care when mountingRoadRunner to the feeder table. It is heavy, anddropping it can cause serious damage to RoadRunnerand anything it falls upon. Use only approved hardwareto mount RoadRunner to the SMT feeder tableTo mount the RoadRunner onto the Universal machine feeder bank, performthe following:!WARNINGCollision hazard. If mounted incorrectly, the GSMpick head might collide with RoadRunner. For thisreason Data I/O recommends mountingRoadRunner only on the front feeder banks near Beam-2.If RoadRunner is mounted on banks 3 and 4 (the rear feederbanks), ensure that the feeder bank is in the outbound positiononly and NOT in the inbound or double inbound positions.Do NOT remove the GSM CE Cover that covers the upper halfof the GSM feeder bank opening.NOTE: When selecting slot positions forRoadRunner, consider that access to it isfrom the right side.1. Hold the RoadRunner level and rest the nose on the feeder bank. Ensurethat the guide under the conveyor settles into a slot.2—22 Data I/O • ProLINE-RoadRunner Owner’s Manual • 096-0240 [updated Mar2010]
- Page 1 and 2: Seeseparate Service ManuCovers all
- Page 3 and 4: Data I/O has endeavored to ensure t
- Page 5 and 6: 2 • InstallationUnpacking the Roa
- Page 7 and 8: Glossary • Glossary of TermsAlpha
- Page 9 and 10: 1Overview • RoadRunner is — •
- Page 11 and 12: 1Overview • Overall System Descri
- Page 14 and 15: Overview • Overall System Descrip
- Page 16 and 17: Overview • Overall System Descrip
- Page 18 and 19: Overview • TaskLink’s Handshake
- Page 20 and 21: Overview • Safety •• Safety F
- Page 22 and 23: Specifications [Assembleon]Overview
- Page 24 and 25: Specifications [Fuji NXT, AIM]Overv
- Page 26 and 27: Overview • Specifications [Panaso
- Page 28 and 29: Overview • Specifications [Panaso
- Page 30 and 31: Specifications [Universal GSM]Overv
- Page 32 and 33: Chapter22InstallationFor the Reject
- Page 34 and 35: Installation • Mounting the RoadR
- Page 36 and 37: Installation • Mounting the RoadR
- Page 39 and 40: Installation • Mounting the RoadR
- Page 41 and 42: Installation • Mounting the RoadR
- Page 43 and 44: Installation • Mounting the RoadR
- Page 45 and 46: Installation • Mounting the RoadR
- Page 47 and 48: Installation • Mounting the RoadR
- Page 49 and 50: Installation • Mounting the RoadR
- Page 51: Installation • Mounting the RoadR
- Page 55 and 56: Installation • Installing the Rej
- Page 57 and 58: Installation • Making the Necessa
- Page 59 and 60: Installation • Making the Necessa
- Page 61 and 62: Installation • Applying Power for
- Page 63 and 64: Installation • Configuring for Ne
- Page 65 and 66: Operation • Operator Functions
- Page 67 and 68: Operation • Operator Functions
- Page 69 and 70: Operation • Operator Functions
- Page 71 and 72: Operation • Operator Functions
- Page 73 and 74: Operation • Operator Functions
- Page 75 and 76: Operation • Operator Functions
- Page 77 and 78: Operation • Operator Functions
- Page 79 and 80: Operation • Operator Functions
- Page 81 and 82: Operation • Operator Functions
- Page 83 and 84: Operation • Operator Functions
- Page 85 and 86: Operation • Operator Functions
- Page 87 and 88: Operation • Supervisor Functions
- Page 89 and 90: Operation • Supervisor Functions
- Page 91 and 92: Operation • Supervisor Functions
- Page 93 and 94: Operation • Supervisor Functions
- Page 95 and 96: Operation • Supervisor Functions
- Page 97 and 98: Operation • Supervisor Functions
- Page 99 and 100: Operation • Supervisor Functions
- Page 101 and 102: Operation • Supervisor Functions
Installation • Mounting the <strong>RoadRunner</strong> •• Mounting <strong>RoadRunner</strong> [Siemens SIPLACE X2, X3, X4, X4i]2Figure 2-25—The SMT Adapter on SIPLACE X <strong>RoadRunner</strong> mates with ribson the Feeder Bank.2. Make sure that the SMT latches onto the <strong>RoadRunner</strong>, and that<strong>RoadRunner</strong> is secure.Connect the communications cable (described in “Siemens SIPLACE XSeries Communications” on page 2-29).Remember to remove <strong>RoadRunner</strong> from the Feeder Cart prior to removingthe Feeder Cart from the SIPLACE Machine.<strong>Data</strong> I/O • ProLINE-<strong>RoadRunner</strong> Owner’s <strong>Manual</strong> • 096-0240 [updated Mar2010] 2—21