RoadRunner Owner's Manual - Data I/O Corporation
RoadRunner Owner's Manual - Data I/O Corporation RoadRunner Owner's Manual - Data I/O Corporation
Installation • Mounting the RoadRunner •• Mounting RoadRunner [Fuji QP242, QP351, IP3, XP142E]2Figure 2-10—The RoadRunner mounted onto a Multi Feeder Unit (MFU)CAUTION: Feeder carts might become unstable.RoadRunner can also be mounted on feeder carts andfeeder test stands. However, some carts/stands were notdesigned for the heavy overhang of RoadRunner andmay tip over easily, especially if the wheels encounter bumps. Usecaution; don’t use (and do label) unsafe carts.3. Slide RoadRunner forward until it comes to a solid stop. The nose willfit under the lip on the MFU.4. Lower RoadRunner fully to ensure that the steel angle under the conveyorsettles into the spring clamp on the MFU.SpringClampFigure 2-11—The angle bracket on RoadRunner fits into the MFU SpringClamp.5. Ensure that RoadRunner is secure.RoadRunner is now mounted to the Fuji MFU.Data I/O • ProLINE-RoadRunner Owner’s Manual • 096-0240 [updated Mar2010] 2—9
Installation • Mounting the RoadRunner •• Mounting RoadRunner [Fuji NXT, AIM]Mounting RoadRunner [Fuji NXT, AIM]2CAUTION: Heavy weight. Use great care when mountingRoadRunner to the feeder table. It is heavy, anddropping it can cause serious damage to RoadRunnerand anything it falls upon. Use only approved hardwareto mount RoadRunner to the SMT feeder table.To mount RoadRunner onto a Feeder Table:NOTE: When selecting slot positionsfor RoadRunner, consider that access toit is from the right side.Also, do not use the four left-most slotson the table or the two right-most slots.1. Hold RoadRunner, one hand in the handhold and one under the Conveyor,so the Conveyor overlaps the Feeder Table by 40 mm and isabove a slot.Figure 2-12—Mounting RoadRunner onto the SMT Feeder Table.2. Lower RoadRunner allowing the nose to rest on the Feeder Table.Ensure that it settles into a slot.3. Still holding the handhold, slide RoadRunner forward as far as it willgo. RoadRunner locks into place.2—10 Data I/O • ProLINE-RoadRunner Owner’s Manual • 096-0240 [updated Mar2010]
- Page 1 and 2: Seeseparate Service ManuCovers all
- Page 3 and 4: Data I/O has endeavored to ensure t
- Page 5 and 6: 2 • InstallationUnpacking the Roa
- Page 7 and 8: Glossary • Glossary of TermsAlpha
- Page 9 and 10: 1Overview • RoadRunner is — •
- Page 11 and 12: 1Overview • Overall System Descri
- Page 14 and 15: Overview • Overall System Descrip
- Page 16 and 17: Overview • Overall System Descrip
- Page 18 and 19: Overview • TaskLink’s Handshake
- Page 20 and 21: Overview • Safety •• Safety F
- Page 22 and 23: Specifications [Assembleon]Overview
- Page 24 and 25: Specifications [Fuji NXT, AIM]Overv
- Page 26 and 27: Overview • Specifications [Panaso
- Page 28 and 29: Overview • Specifications [Panaso
- Page 30 and 31: Specifications [Universal GSM]Overv
- Page 32 and 33: Chapter22InstallationFor the Reject
- Page 34 and 35: Installation • Mounting the RoadR
- Page 36 and 37: Installation • Mounting the RoadR
- Page 39: Installation • Mounting the RoadR
- Page 43 and 44: Installation • Mounting the RoadR
- Page 45 and 46: Installation • Mounting the RoadR
- Page 47 and 48: Installation • Mounting the RoadR
- Page 49 and 50: Installation • Mounting the RoadR
- Page 51 and 52: Installation • Mounting the RoadR
- Page 53 and 54: Installation • Mounting the RoadR
- Page 55 and 56: Installation • Installing the Rej
- Page 57 and 58: Installation • Making the Necessa
- Page 59 and 60: Installation • Making the Necessa
- Page 61 and 62: Installation • Applying Power for
- Page 63 and 64: Installation • Configuring for Ne
- Page 65 and 66: Operation • Operator Functions
- Page 67 and 68: Operation • Operator Functions
- Page 69 and 70: Operation • Operator Functions
- Page 71 and 72: Operation • Operator Functions
- Page 73 and 74: Operation • Operator Functions
- Page 75 and 76: Operation • Operator Functions
- Page 77 and 78: Operation • Operator Functions
- Page 79 and 80: Operation • Operator Functions
- Page 81 and 82: Operation • Operator Functions
- Page 83 and 84: Operation • Operator Functions
- Page 85 and 86: Operation • Operator Functions
- Page 87 and 88: Operation • Supervisor Functions
- Page 89 and 90: Operation • Supervisor Functions
Installation • Mounting the <strong>RoadRunner</strong> •• Mounting <strong>RoadRunner</strong> [Fuji NXT, AIM]Mounting <strong>RoadRunner</strong> [Fuji NXT, AIM]2CAUTION: Heavy weight. Use great care when mounting<strong>RoadRunner</strong> to the feeder table. It is heavy, anddropping it can cause serious damage to <strong>RoadRunner</strong>and anything it falls upon. Use only approved hardwareto mount <strong>RoadRunner</strong> to the SMT feeder table.To mount <strong>RoadRunner</strong> onto a Feeder Table:NOTE: When selecting slot positionsfor <strong>RoadRunner</strong>, consider that access toit is from the right side.Also, do not use the four left-most slotson the table or the two right-most slots.1. Hold <strong>RoadRunner</strong>, one hand in the handhold and one under the Conveyor,so the Conveyor overlaps the Feeder Table by 40 mm and isabove a slot.Figure 2-12—Mounting <strong>RoadRunner</strong> onto the SMT Feeder Table.2. Lower <strong>RoadRunner</strong> allowing the nose to rest on the Feeder Table.Ensure that it settles into a slot.3. Still holding the handhold, slide <strong>RoadRunner</strong> forward as far as it willgo. <strong>RoadRunner</strong> locks into place.2—10 <strong>Data</strong> I/O • ProLINE-<strong>RoadRunner</strong> Owner’s <strong>Manual</strong> • 096-0240 [updated Mar2010]