04.12.2012 Views

r - part - usaid

r - part - usaid

r - part - usaid

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

adequate to meet t2e space needs for the first few years.<br />

Six four wheel drive vekicles sill be needed. Two or three<br />

should be pick-ups with reaeveable cazping uxits and will be<br />

assigned to regional a:fices. Camping equipment will be needed<br />

for t+.e field staff.<br />

2.3.7-6. Work P hn<br />

A three year worX plsn 1s set out SeLow. Enphasis in the<br />

first year will be on direct trai~lng for the Planning Unit<br />

staff, and upon establishing trai2ir.g coi;rsee to be provided by<br />

the Vnit for other staff. Trainizg courses will be designed for<br />

the following staff:<br />

Regional Planning Officers. It is proposed that the eventual<br />

requirements will include the appointment of a Regional<br />

Planning Oificer to each of the WDA regional headquarters.<br />

These are not to be new staff positions, however. Existing<br />

full t ime WDA hydroqeologfsts and engineer6 who have major<br />

technical and/or ahinzstrative responsibilities at regional<br />

offices will assume additional regional water development<br />

planning responsibilities. They will be responsible for<br />

co-ordinathg the planning effort in the region, using<br />

visiting ?laming Unit field staff, existing WDA region<br />

headquarters staff, and staff of other ministries or agencies<br />

operating in zle region, to carry out many of the required<br />

nonitcring and eva:uation tasks. The appointment and<br />

training of Regional Tlanning Officers throughout the country<br />

would folfau the pla3 set oxt belcw:<br />

Year<br />

2egianal F la~nin~<br />

OEfaccrs appointed<br />

znd traized 2 4 4 G 4<br />

Other W3A staff . The plan~ing icnction will be a<br />

co-operative efforc vithin ?he WDA. To this end, other staff<br />

within WDA, both at head-arters and at regional levels, w ill<br />

he required to <strong>part</strong>icipatr i.n. dcta collection fur monitoring<br />

and evalzation.<br />

Exrensien and cor.itorir.g a25 evaluaficn staff of other<br />

Uizistries and agezcies. Ytase will include, the staff of<br />

the hXEF Cni; of the 3iaiscry of Sationzl Planning, BRADP and<br />

CRDP.<br />

The oSjectives for each cf %he firs: three years are:<br />

Year i t Reczultsent az3 inrezsive t rahing of senior staff of

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!