04.12.2012 Views

r - part - usaid

r - part - usaid

r - part - usaid

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

from the wells zompletad by the CGDP, and available data from<br />

other projects in Somalia. Much of this data is naw out of<br />

date, but because the W DC has not ye* naterialised, and because<br />

cooperation frow the WDA regional offices was not forthcoming,<br />

system at?.^ verification has not been possible. The database bas<br />

been prepared for eventual handover to the WDC.<br />

The above brief descriptions represent the accomplishments<br />

of the Planning Unit with respect to the original objectives, as<br />

modified in the light of the resources actually available.<br />

During the course 02 the final year of the project extension<br />

period, other tasks were undertaken by the Unit. These included<br />

the estabXishment ~f a storas inventory system, preparation of a<br />

budgetary procedures manual, technical assistance to other<br />

sectians of the project, and tra.kning to local LBIX staff,<br />

Stores Xnventory System. In preparation far eventual handover<br />

to WDA, the complete project stores inventory was set up as a<br />

computer database. A comprehensive suite of programs allows<br />

this database to be regularly updated with issues and new<br />

deliveries* fn retrospect, it is now clear that such a system<br />

would have been extremely useful to the project from its<br />

inception, to batter ;., *p track of whzt was already on order,<br />

and facilitate tight&-c i.~v.ventory control q~d planning. The<br />

packaged system was written using dSase I11 . The system is<br />

transferrable to ather rninistries and agencies af the government<br />

which are equipped with computer facilities.<br />

A very simple vehicle and equipment inventory system has<br />

also been set up. This will facilitate final handover to WDA,<br />

and the planninq of future maintenznce and replacement<br />

schedules-<br />

Budgetary Procedures McUiUal, A manual af recommended budgetary<br />

procedures has been produced for WDA. Rather than a<br />

specification of the detailed procedures necessary far the<br />

handling of czsh, this manual sets out the formats and<br />

timetables aecessary to prepare estimates, and to account for<br />

expendituras, throughout the agency, WDA finances are derived<br />

from a number of sources, and programs and projects must be<br />

accounted for in forms which cut across the administrative<br />

structures. This manual presents a Armat of accounting and a<br />

system of report-ing which will permit WDA to deal with this<br />

camplexit.y.<br />

Other Technical Systems. In response to the needs of the<br />

hydrogeology section of the project, other computerised systems<br />

have been developed that include the analysis of data an well<br />

testing and water quality.<br />

? t e s t . A spreadsheet has been set up to allow the

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!