in the original objectives, were on the impact af welX<br />

construction, an the feasibilty and benefits OF supporting<br />

camunity water cornittees and of cumunity <strong>part</strong>icipation fn<br />

general.<br />

4. Policy studies. ~bjectives for policy studies were not<br />

changed, but broadened, as desc~ibed above, to become a<br />

major set of objectives far the Unit.<br />

Because the NWDC did not become a reality, the field work<br />

planned as <strong>part</strong> of the 9ffort to create a groundwater database<br />

was not possible. The objective of the Planning Unit then<br />

became to create a camputerised database from the groundwater<br />

data available to the project and to WDA.<br />

2.3.5. Actual Achievements.<br />

Some af the revised objectives were achisved, others not at<br />

~ll, and still others to a Limited degree. Computer systems and<br />

databases have been set up and are in use, the "packagedw<br />

systems have been created, new data has been collected and<br />

analysed, and a number of local staff have been trained. The<br />

actual achievements are described by category below:<br />

1. Planning.<br />

Attempts to eataSlish planning schedules for all WDA<br />

resources did not prove possible. This required that<br />

WDA de<strong>part</strong>ment managers and regional directors provide<br />

a regular flow of information to the Planning Unit on<br />

inventories, staffing , and budgets. Two<br />

questionnaires ware circulated for this purpose,<br />

however, the information was not forthcoming. Without<br />

a detailed knowledge of the resources available and<br />

the maintenance caxmftments, ik was not possible to<br />

devise drilling and maintenance programs.<br />

A11 water quality data collected during the project<br />

has been set up as a computer database, together with<br />

most of the data on the borehales drilled by the<br />

pxoj ect .<br />

A technical monitoring system was designed and, given<br />

the limited staff resources of the Planning Unit,<br />

successfully field tested at sites in the Bay Region<br />

and the Central Range. This is described in further<br />

detail in Section 3.0.<br />

A computerized mapping system was developed whereby<br />

statistical data from surveys completed in Somalia can<br />

Se used to determine population and water demand