projects.<br />

Brandon, Carter, 1984, Ecozo~ic Evaluatian of the<br />

Csmprzhensive Groundwater Development Project.<br />

A2 eccnonic evaluation was undertaken after two years into<br />

the well construction activities of the project. The intention<br />

of the study was to advance the knowledge of the costs and<br />

benefits cf the project. A definitive evaluation of benefits<br />

gas nor p~ssibZe because of insufficient end user data. The<br />

re<strong>part</strong> covered three najor activities that included an analysis<br />

05:<br />

1" The fgll costs of the groundwater development program,<br />

2. The projected benefits, and<br />

3- The lung-tern operating and zaintenance c~sts.<br />

Although the resulting casts appeared high, close analysis of<br />

assumptions nade and items included indicate that given the same<br />

lcgistical and material costs, the well costs would be<br />

zoxpara52e to those afaost anphere.<br />

Updated analyses, and details of the campuler model now<br />

avaifoble to obttin the data, are included in this report. End<br />

zsex data is still sparse, and ecanamfc evaluation af benefits<br />

is difficult, however, some prajections were made,<br />

Final Report, Phase 1, 1986<br />

Tbe final rep9r-t prepared at the end of the first phase of<br />

the project, 3dly 1984, su,marizes project activities from July,<br />

1981, when the projest was initiated. This report consisted of<br />

three vohunss; val+u~e me described general activities, volume<br />

two ?resented findinqs of the hydrogeologic investigation, and<br />

volume three conrsixed appendices of basic Oata.<br />

e qezera: a-+;viei<br />

-br ,&,es voLuze was vite comprehensive;<br />

however, ax updare of general activities is presented in this<br />

valu~e. Many of t3e findings presented in the hydrology volume<br />

have been revised in this report on the basis of new<br />

Infomatio3. All cE the data contaimd in the third volme,<br />

appendices, Ere izciuded in this repxt in either Volume ZY or<br />

P.<br />

:~cr cc~pletiaa sf zkree years work, the project was<br />

~e-e-ral;lated an;? extezded fs:: twr nore yeilrs, The single volurae<br />

Iz:eri= Report describes work cozpleted after the first year of<br />

t3is extension, nazelp frsz J ~ l y 1984 through July 1985. Basic<br />

collecteC d7~xinq chat perLcd was izcl-cded, in addition to