Bay Regio3 CenlraZ Range Total<br />
N W e s of rigs 3 1.5 4 , 5<br />
Wells with diesel p up 16 4 20<br />
Wells with hand pun? 2 3. 3<br />
Explaratary wells L2 5 17<br />
B of year lagging<br />
vehicle rsquired 50% 23% ?3%<br />
Xn a larger program, t3is may be realistic. A logging<br />
vehicle! operating in the Bay Region is assumed to last for five<br />
years and one operaZincj An the Ccnlraf Range is assumed to last<br />
for aaly @kme years [Appendices 4.4.1 and 4.4.2, Table 9).<br />
These nay prove to be cansen-a25ivs estimates.<br />
The type sf civil works constructed By the project is<br />
discussed in Sections 2.6 and 3.6. After July 1984, the<br />
canstmetion of civil works at Groundwater Project rites became<br />
ma responsibility cf the Bay Region Acjricultural Development<br />
Project and the Central Rangelands Sevelopnent Project,<br />
Dependin9 upon the design and facilities provided, the cost of<br />
civil works can exceed $40,000 per site, as quoted to BRADP in<br />
response to a recent tender advertisement, and may be as 9igh as<br />
$100,000, 9s installed by GTZ In the Central Rangelands.<br />
The figures intruded in the model represent the cost of the<br />
less a-itiaus facility built by WDA and constructed from<br />
locally available materials (Appendices Q ,4,1 and 4.4.2, Table<br />
6). It consists 05 a water storage tank, two or three troughs,<br />
and a Sank af taps.<br />
A pump crew of five is assued to require a total of 5 days<br />
to install a diesel punp ax3 4 days =o install a hand pump in<br />
the Bay Region (Appendix 4.4.1, Tables 7 and 8)- In the Central<br />
Range these times are extended by two days to allow for extra<br />
travel.<br />
The pumps installed by the project were Honelift with<br />
Lister diesel engines, and Mono hand pumps. The complete diesel<br />
assembly costs approximately $14,500, and the handpump cast<br />
$3,600. Ordered in sufficient numbers to fill containers sent<br />
from the Cnited States, the additional cost of overland and sea<br />
freight is approximately 5%.<br />
4-1.8. Well Completion Time<br />
Fron the assumptions used in t3e versions of the madel in