further analysis has now been completed azd Is presented in this<br />

report, E ~ c ~ uthe s ~ figures developed in this report are, in<br />

some cases, considerably differe~t from those arrived at in the<br />

previous reports, and the aethodolagy used differs, some<br />

co-ents are appropriate here.<br />

The ?ape analysis was ws:* *den at the time when there<br />

existed virtually no CGDP project experience from which ta draw.<br />

It sets out an excellent metkoddogy for the e~ti~atiun of the<br />

casts 02 well constr~ction. The nodel is very detailed, with<br />

sufficient variables to allwd it be used for any pr~p~sed<br />

drilling operation in Somlia, The methodology resulted in an<br />

analysis that ciosely predicted the actual cast of we31<br />

construction (Pape, 1982 F.45).<br />

The Brandon analysis estimated an average direct cost for<br />

basic well construction of 553,E00 {Brandon, 2.984, p.29). This<br />

appears deceptively close to the latest available figure of<br />

$54,030 for Bay rec'on drilling. However, the three analyses<br />

included significane variation in estimztes af the cost of<br />

surface casing, we31 casing, screen and diesel pump. Differing<br />

costs =or screen and casing reflect differing standards<br />

required, Expaxience deternines the appropriate standards for a<br />

pzrticular region. &. ~r.2 variations in the estimates made are as<br />

follows:<br />

Latest figures Erandan ~npe<br />

-------------- *------ ------""--*---<br />

"<br />

steel' P.V. C. Steal Steel P-V-C.<br />

8'' Casing 49 43 7 6 75 18<br />

Bst scweer, 25 57 104 84 37<br />

Surf. casing a5 -- 144 3.44 --<br />

Diesel pan~ $15,225 $20,0i!fJ $13,500<br />

7<br />

'(steel supplied fron NairzSi, transported by road (+16%<br />

Erelqhtf P.V.C. supplied frox C.S.A., transported by container<br />

(i25$ freight), figures in Y.S.5 pez neter including freight<br />

The zest reze~t estixates are shown in sumary form in<br />

Tables 2 . throxgh 2.4.4. Ths Frandon analysis cost of<br />

$53,550 does not include any allowacce for capital equipment<br />

purchase, depreciation, or repairs an-< maintenance. The most<br />

recent estimate of Sf4!CZO qxozad abov~ fcs operatians in the<br />

3ay region includes a re~listic capital replacement charge, and<br />

an annual rspairs and maintecance charge for ail equipment,<br />

based on l3% of the capitzl costs.<br />

The conszruction cost, LtincSud' 7- sunk capital costs3',<br />

arrived zt in the Grandon anzPysis is of the order of $188,000,<br />

{Brandan, 1884, p.43). T ~ E +~~Lysis presented in this report