16.07.2015 Views

Hosadurga -ES.pdf - kuidfc

Hosadurga -ES.pdf - kuidfc

Hosadurga -ES.pdf - kuidfc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Hosadurga</strong> CDP FR (Jan 10).doc5. The City Development Plan proposes to develop <strong>Hosadurga</strong>’s water supply system basedon the following sub-project identification criteria: (i) Augmentation of water supply; (ii)New distribution network and old rehabilitation (iii) Water service connections (WSC);(iii) Metering of the system. The total cost of additional improvements in water supplysystem in the CDP period is estimated Rs. 467.15 lakhs for <strong>Hosadurga</strong> TMC.2. Sewerage and Sanitation6. Execution of a modern underground drainage/sewerage (UGD) system is currentlyunderway in <strong>Hosadurga</strong> TMC. The design and execution is undertaken by KUWS&DB.The entire TMC area is divided into three sewerage districts, covering 18 zones. The UGDscheme is designed for a population of 48,565 projected in the year 2031. The work hascommenced in 2007 and will be completed in 2009 for system operation. The totalinvestment for sewerage and sanitation sector to meet the ultimate demand of 2033 isestimated at Rs. 262.83 lakhs.3. Storm Water Drainage7. There is no major watercourse in the town. The TMC maintains 36 km of storm waterdrains in the city that covers 36 percent of road length. The City Development Planproposes to develop <strong>Hosadurga</strong>’s storm water drainage based on the below mentioned subprojectidentification criteria: (i) Rehabilitation of Existing Drains & Major Drains; and(ii) Laying of new roadside drains. The total investment in storm water drainage sector tomeet the ultimate demand of 2033 is estimated as Rs. 2,380.50 lakhs4. Solid Waste Management8. Key issues associated with <strong>Hosadurga</strong> ’s solid waste management comprise: (i) 77 percentof waste collected from various waste generation sources; (ii) No practices of door-to-doorsegregated waste collection and lack of public awareness on SWM; and (iii) No treatmentof waste at the disposal site.9. The City Development Plan proposes to develop <strong>Hosadurga</strong> ’s SWM system based on thebelow mentioned sub-project identification criteria: (i) Developing a 100 percent door-todoorcollection system; (ii) Street sweeping; (iii) Waste collection from bulk generators;(iv) Temporary Waste Storage; (v) Purchasing of suitable vehicles and equipment (v)Waste Transportation from Containers to Disposal Site; and (vi) Waste Processing andDisposal. The total investment for solid waste management sector to meet the ultimatedemand of 2033 is estimated as Rs. 700.37 lakhs5. Traffic and Transportation10. Key transportation issues in <strong>Hosadurga</strong> TMC – (i) Poor condition of surface exhibitsdistress with cracks, potholes, raveling and soil on the surface; absence of road side drains.Condition of SH roads is poor; (ii) Soil strata of the town is characterised Gravel and theb

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!