NKUSIP (Package I - Dharwad)Tranche I Sub-Projects in Haveri CMCInitial Environmental ExaminationImpactDescriptionImproper handlingof excess soilOperation ImpactsRecurrence ofblockage andleakage problems.Significance ofthe ImpactN/TM/TThe existingsystem losses arearound 25 %.Mitigation Measuresdisposal sites.Excess soil shall bedisposed in lowlaying areas otherthan water bodiesThe leak detectionand water auditingsurveys shall beconducted. The leakrestoration time shallbe minimized.ImplementationResponsibilityHeadContractor/CMCCMC HaveriPreliminaryCostingPart ofConstructionCost. .Part of O &M CostsTable 18.Impact DescriptionEnvironmental Impacts and Mitigation Measures of Drainage UpgradationLocation ImpactsNo location impacts are envisagedas the scale of activity is minimalDesign ImpactsNo loss or encroachment ofcultural or historical properties isenvisaged. No impacts areenvisaged.Construction ImpactsImproper disposal of BituminouswasteSignificance of theImpactMitigationMeasuresImplementationResponsibilityN/a. N/a. N/a. N/a.N/a. N/a. N/a. N/a.M/PBituminouswaste top bedisposed inapprovedwastedisposalsites.Improper handling of excess soil N/T Excess soilshall bedisposed inlow layingareas otherthan waterbodiesDisturbance to traffic due tostorage of constructionmaterial/waste and materialtransport vehicles and otherequipment.N/TThis impactmay beinsignificantas the scaleof activity issmall.Constructionactivitieswill beplanned tohave leastimpact ontrafficduringmaterialstorage.PropertrafficmanagementHead ContractorHeadContractor/CMCHeadContractor,Haveri CMCPreliminaryCostingPart ofconstructioncostsPart ofConstructionCost.Part ofConstructioncostsKUIDFC45WSAPL

NKUSIP (Package I - Dharwad)Tranche I Sub-Projects in Haveri CMCInitial Environmental ExaminationImpact DescriptionOperation ImpactsSilting and pollution of waterbodies due to non-clearance ofconstruction work site.Significance of theImpactN/TMitigationMeasuresplan has tobe preparedprior tostarting ofconstructionactivities.Siteclearanceshall beensuredbeforeterminationof work.ImplementationResponsibilityHeadContractor/CMCPreliminaryCostingPart ofConstructioncostsKUIDFC46WSAPL

NKUSIP (Package I - Dharwad)Tranche I Sub-Projects in <strong>Haveri</strong> CMCInitial Environmental ExaminationImpact DescriptionOperation ImpactsSilting and pollution of waterbodies due to non-clearance ofconstruction work site.Significance of theImpactN/TMitigationMeasuresplan has tobe preparedprior tostarting ofconstructionactivities.Siteclearanceshall beensuredbeforeterminationof work.ImplementationResponsibilityHeadContractor/CMCPreliminaryCostingPart ofConstructioncostsKUIDFC46WSAPL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!