NKUSIP (Package I - Dharwad)Tranche I Sub-Projects in Haveri CMCInitial Environmental ExaminationImpact DescriptionSignificanceof the ImpactMitigation Measuresif anyImplementationResponsibilityPreliminaryCostingImproper disposal ofBituminous wasteImproper handlingof excess soilO & M ImpactsMixing of IndustrialWaste water withsewageOdour nuisance dueto STPThis impact may beconsidered asnegligible due tolocation of plant siteand proposed bufferprovisionM/PN/TM/PTreatmentprocess in thedown streamwill besignificantlyaffectedHealth risk tothe sewerworkers dueto toxiceffluent andgasesM/PNewlydevelopingresidentialareas arelocated at 1000m. Futureexpansion oftown may beconsideredA construction sitemanagement planshall be prepared.Poor performance ofthe contractor maypotentiallyexacerbate theseimpacts andtherefore qualifiedcontractors to beappointed. Thecontracted workincludes theimplementation ofconstruction sitemanagement plan,which will addressthese issues.Bituminous wastetop be disposed inapproved wastedisposal sites.Excess soil shall bedisposed in lowlaying areas otherthan water bodiesThe rules andregulation will bestrictly implementedto avoid mixing ofindustrial wastestream with sewage.Buffer zone in theform of landscapingand earthwork shallbe created and wellmaintained aroundthe site.HeadContractorHeadContractor/CMCKSPCB andCMC HaveriCMC HaveriPart ofconstructioncostsPart ofConstructionCost. .Part of O&MCostPart of O & McostsKUIDFC41WSAPL
NKUSIP (Package I - Dharwad)Tranche I Sub-Projects in Haveri CMCInitial Environmental ExaminationImpact DescriptionPotential pollution ofstream/agriculturalfields due toinadequatetreatment.Pollution and healthhazards due toimproper sludgedisposal methodsSignificanceof the ImpactN/PAs the STP isdesigned forstreamdischargestandards, theimpact may beminimal.However,overloading ofSTP mayexaggeratetheseproblems.M/PQuantity ofsludgegeneration willnot beconsiderable.Contaminatedwork area maycause healthhazards.Mitigation MeasuresEnsure the followingeffluent dischargestandards for streamdischarge:• BOD < 30 mg/l -• Suspendedsolids < 100mg/lSafe sludge handlingmethods shall beemployed - Personalprotection equipmentsuch as gloves, boots,shall be provided.Sludge shall be driedin drying beds beforeits disposal. Thissludge may be usedas manure for nonfoodcrops or landfilled.ImplementationResponsibilityCMC HaveriCMC HaveriPreliminaryCostingN/a.Part of O & McostsNuisance due tooverflowing/choking of sewers.N/PNo majorwater bodiesand groundwater is verydeep.Howevernuisance maybe considered.Sludge ManagementPlan shall beimplemented.Implement themitigation measuressuggested in thedesign stage to avoidchocking.Sewer cleaningequipments havebeen providedCMC Haveri.Part ofConstructionCost.KUIDFC42WSAPL
- Page 1 and 2: Karnataka Urban Infrastructure Deve
- Page 3 and 4: NKUSIP (Package I - Dharwad)Tranche
- Page 5 and 6: NKUSIP (Package I - Dharwad)Tranche
- Page 7 and 8: NKUSIP (Package I - Dharwad)Tranche
- Page 9 and 10: NKUSIP (Package I - Dharwad)Tranche
- Page 11 and 12: NKUSIP (Package I - Dharwad)Tranche
- Page 13 and 14: NKUSIP (Package I - Dharwad)Tranche
- Page 15 and 16: NKUSIP (Package I - Dharwad)Tranche
- Page 17 and 18: NKUSIP (Package I - Dharwad)Tranche
- Page 19 and 20: NKUSIP (Package I - Dharwad)Tranche
- Page 22 and 23: NKUSIP (Package I - Dharwad)Tranche
- Page 24 and 25: NKUSIP (Package I - Dharwad)Tranche
- Page 26: NKUSIP (Package I - Dharwad)Tranche
- Page 29: NKUSIP (Package I - Dharwad)Tranche
- Page 32 and 33: NKUSIP (Package I - Dharwad)Tranche
- Page 34 and 35: NKUSIP (Package I - Dharwad)Tranche
- Page 36 and 37: NKUSIP (Package I - Dharwad)Tranche
- Page 38 and 39: NKUSIP (Package I - Dharwad)Tranche
- Page 40 and 41: NKUSIP (Package I - Dharwad)Tranche
- Page 42 and 43: NKUSIP (Package I - Dharwad)Tranche
- Page 44 and 45: NKUSIP (Package I - Dharwad)Tranche
- Page 48 and 49: NKUSIP (Package I - Dharwad)Tranche
- Page 50 and 51: NKUSIP (Package I - Dharwad)Tranche
- Page 52 and 53: NKUSIP (Package I - Dharwad)Tranche
- Page 54 and 55: NKUSIP (Package I - Dharwad)Tranche
- Page 56 and 57: NKUSIP (Package I - Dharwad)Tranche
- Page 58 and 59: NKUSIP (Package I - Dharwad)Tranche
- Page 60 and 61: NKUSIP (Package I - Dharwad)Tranche
- Page 62 and 63: NKUSIP (Package I - Dharwad)Tranche
- Page 64 and 65: NKUSIP (Package I - Dharwad)Tranche
- Page 66 and 67: NKUSIP (Package I - Dharwad)Tranche
- Page 68 and 69: NKUSIP (Package I - Dharwad)Tranche
- Page 70 and 71: NKUSIP (Package I - Dharwad)Tranche
- Page 72 and 73: NKUSIP (Package I - Dharwad)Tranche
- Page 74 and 75: NKUSIP (Package I - Dharwad)Tranche
- Page 76 and 77: NKUSIP (Package I - Dharwad)Tranche
- Page 78 and 79: NKUSIP (Package I - Dharwad)Tranche
- Page 80 and 81: NKUSIP (Package I - Dharwad)Tranche
- Page 82: NKUSIP (Package I - Dharwad)Tranche
NKUSIP (Package I - Dharwad)Tranche I Sub-Projects in <strong>Haveri</strong> CMCInitial Environmental ExaminationImpact DescriptionPotential pollution ofstream/agriculturalfields due toinadequatetreatment.Pollution and healthhazards due toimproper sludgedisposal methodsSignificanceof the ImpactN/PAs the STP isdesigned forstreamdischargestandards, theimpact may beminimal.However,overloading ofSTP mayexaggeratetheseproblems.M/PQuantity ofsludgegeneration willnot beconsiderable.Contaminatedwork area maycause healthhazards.Mitigation MeasuresEnsure the followingeffluent dischargestandards for streamdischarge:• BOD < 30 mg/l -• Suspendedsolids < 100mg/lSafe sludge handlingmethods shall beemployed - Personalprotection equipmentsuch as gloves, boots,shall be provided.Sludge shall be driedin drying beds beforeits disposal. Thissludge may be usedas manure for nonfoodcrops or landfilled.ImplementationResponsibilityCMC <strong>Haveri</strong>CMC <strong>Haveri</strong>PreliminaryCostingN/a.Part of O & McostsNuisance due tooverflowing/choking of sewers.N/PNo majorwater bodiesand groundwater is verydeep.Howevernuisance maybe considered.Sludge ManagementPlan shall beimplemented.Implement themitigation measuressuggested in thedesign stage to avoidchocking.Sewer cleaningequipments havebeen providedCMC <strong>Haveri</strong>.Part ofConstructionCost.KUIDFC42WSAPL