NKUSIP (Package I - Dharwad)Tranche I Sub-Projects in Haveri CMCInitial Environmental ExaminationImpact Descriptionfor the public andimpact on livelihooddie to loss of accessto business.Inconvenience topublic during sewerlaying along thickcommercial areasand narrow streets;where publicfacilities are located.Significanceof the Impactother facilitiesalong theproposedsewer laningareas will bedisturbedduringconstructionperiod.M/TReducedpedestrian andvehicle accessto residencesand businessesMitigation Measuresalong theconstruction areasfor the public toaccess theirrequirements forresidential, shoppingand other facilities.Construction shouldbe expedited in theleast time frame.Activities requiringmaximum accesscontrol should bedone during nonpeak hours.ImplementationResponsibilityHeadContractorPreliminaryCostingExcavation along theroad should be donein such a way thatentire stretch will notbe trenched at a time.Nuisance due to dustand noise; roadblocking due tolaying of sewernetwork; and,increased traffic flowdue to vehiclemovement forconstructionactivities.M/TDustgeneration maybe significantas the dryweatherconditionprevails in thetown.Traffic managementwith diversionthrough alternateroutes will beimplemented byproviding adequatesign boards.Constructionmaterial shall bestockpiled tominimize trafficblockages. In case ofexcavations forsewer lines in busystreets such ascentral areas of thetown (market area,old town area),adequatearrangements fortraffic diversionincluding priorintimation and byerecting proper signboard shall beprovided.Considering theHaveri CMCHeadContractorPMU, HaveriCMCPart ofconstructioncostsKUIDFC39WSAPL
NKUSIP (Package I - Dharwad)Tranche I Sub-Projects in Haveri CMCInitial Environmental ExaminationImpact DescriptionDust and noise fromconstruction of STPandlying/rehabilitationof sewer networkactivities.Significanceof the ImpactM/TSewernetwork willbe laid all overthe townincluding highdensity areas.As theproposed STPis locatedaway thehabitation,as far as layingof sewernetwork isconsidered,the dust andnoise nuisancemay beconsiderablein the coretown area andin all otherareas it maybe negligible.Mitigation Measuresmarket and denseresidential areas inthe core town area,preparation ofconstruction sitemanagement plan isnecessary.Poor performance ofthe contractor maypotentiallyexacerbate theseimpacts andtherefore qualifiedcontractors to beappointed. Thecontracted workincludes theimplementation ofconstruction sitemanagement plan,which will addressthese issues.Constructionmaterial shall bestockpiled. Adequatearrangements fortraffic diversionsincluding erection ofproper sign boards.Dust generationmust be arrested bywater spraying.Ensure usage ofstandard equipmentto reduce the noisenuisance. Equipmentshall comply withthe noise levels ofconstructionequipment laid outby the CPCB. Highnoise generatingactivities includingmaterial unloadingshall be avoidedduring nights. Thesurrounding peopleshall be informed,especially in denselypopulated area, ofnature and scheduleof the high noisegenerating activities,ImplementationResponsibilityHeadContractor/CMC HaveriPreliminaryCostingPart ofconstructioncostKUIDFC40WSAPL
- Page 1 and 2: Karnataka Urban Infrastructure Deve
- Page 3 and 4: NKUSIP (Package I - Dharwad)Tranche
- Page 5 and 6: NKUSIP (Package I - Dharwad)Tranche
- Page 7 and 8: NKUSIP (Package I - Dharwad)Tranche
- Page 9 and 10: NKUSIP (Package I - Dharwad)Tranche
- Page 11 and 12: NKUSIP (Package I - Dharwad)Tranche
- Page 13 and 14: NKUSIP (Package I - Dharwad)Tranche
- Page 15 and 16: NKUSIP (Package I - Dharwad)Tranche
- Page 17 and 18: NKUSIP (Package I - Dharwad)Tranche
- Page 19 and 20: NKUSIP (Package I - Dharwad)Tranche
- Page 22 and 23: NKUSIP (Package I - Dharwad)Tranche
- Page 24 and 25: NKUSIP (Package I - Dharwad)Tranche
- Page 26: NKUSIP (Package I - Dharwad)Tranche
- Page 29: NKUSIP (Package I - Dharwad)Tranche
- Page 32 and 33: NKUSIP (Package I - Dharwad)Tranche
- Page 34 and 35: NKUSIP (Package I - Dharwad)Tranche
- Page 36 and 37: NKUSIP (Package I - Dharwad)Tranche
- Page 38 and 39: NKUSIP (Package I - Dharwad)Tranche
- Page 40 and 41: NKUSIP (Package I - Dharwad)Tranche
- Page 42 and 43: NKUSIP (Package I - Dharwad)Tranche
- Page 46 and 47: NKUSIP (Package I - Dharwad)Tranche
- Page 48 and 49: NKUSIP (Package I - Dharwad)Tranche
- Page 50 and 51: NKUSIP (Package I - Dharwad)Tranche
- Page 52 and 53: NKUSIP (Package I - Dharwad)Tranche
- Page 54 and 55: NKUSIP (Package I - Dharwad)Tranche
- Page 56 and 57: NKUSIP (Package I - Dharwad)Tranche
- Page 58 and 59: NKUSIP (Package I - Dharwad)Tranche
- Page 60 and 61: NKUSIP (Package I - Dharwad)Tranche
- Page 62 and 63: NKUSIP (Package I - Dharwad)Tranche
- Page 64 and 65: NKUSIP (Package I - Dharwad)Tranche
- Page 66 and 67: NKUSIP (Package I - Dharwad)Tranche
- Page 68 and 69: NKUSIP (Package I - Dharwad)Tranche
- Page 70 and 71: NKUSIP (Package I - Dharwad)Tranche
- Page 72 and 73: NKUSIP (Package I - Dharwad)Tranche
- Page 74 and 75: NKUSIP (Package I - Dharwad)Tranche
- Page 76 and 77: NKUSIP (Package I - Dharwad)Tranche
- Page 78 and 79: NKUSIP (Package I - Dharwad)Tranche
- Page 80 and 81: NKUSIP (Package I - Dharwad)Tranche
- Page 82: NKUSIP (Package I - Dharwad)Tranche
NKUSIP (Package I - Dharwad)Tranche I Sub-Projects in <strong>Haveri</strong> CMCInitial Environmental ExaminationImpact DescriptionDust and noise fromconstruction of STPandlying/rehabilitationof sewer networkactivities.Significanceof the ImpactM/TSewernetwork willbe laid all overthe townincluding highdensity areas.As theproposed STPis locatedaway thehabitation,as far as layingof sewernetwork isconsidered,the dust andnoise nuisancemay beconsiderablein the coretown area andin all otherareas it maybe negligible.Mitigation Measuresmarket and denseresidential areas inthe core town area,preparation ofconstruction sitemanagement plan isnecessary.Poor performance ofthe contractor maypotentiallyexacerbate theseimpacts andtherefore qualifiedcontractors to beappointed. Thecontracted workincludes theimplementation ofconstruction sitemanagement plan,which will addressthese issues.Constructionmaterial shall bestockpiled. Adequatearrangements fortraffic diversionsincluding erection ofproper sign boards.Dust generationmust be arrested bywater spraying.Ensure usage ofstandard equipmentto reduce the noisenuisance. Equipmentshall comply withthe noise levels ofconstructionequipment laid outby the CPCB. Highnoise generatingactivities includingmaterial unloadingshall be avoidedduring nights. Thesurrounding peopleshall be informed,especially in denselypopulated area, ofnature and scheduleof the high noisegenerating activities,ImplementationResponsibilityHeadContractor/CMC <strong>Haveri</strong>PreliminaryCostingPart ofconstructioncostKUIDFC40WSAPL