NKUSIP (Package I - Dharwad)Tranche I Sub-Projects in Haveri CMCInitial Environmental ExaminationImpact Descriptionfor the public andimpact on livelihooddie to loss of accessto business.Inconvenience topublic during sewerlaying along thickcommercial areasand narrow streets;where publicfacilities are located.Significanceof the Impactother facilitiesalong theproposedsewer laningareas will bedisturbedduringconstructionperiod.M/TReducedpedestrian andvehicle accessto residencesand businessesMitigation Measuresalong theconstruction areasfor the public toaccess theirrequirements forresidential, shoppingand other facilities.Construction shouldbe expedited in theleast time frame.Activities requiringmaximum accesscontrol should bedone during nonpeak hours.ImplementationResponsibilityHeadContractorPreliminaryCostingExcavation along theroad should be donein such a way thatentire stretch will notbe trenched at a time.Nuisance due to dustand noise; roadblocking due tolaying of sewernetwork; and,increased traffic flowdue to vehiclemovement forconstructionactivities.M/TDustgeneration maybe significantas the dryweatherconditionprevails in thetown.Traffic managementwith diversionthrough alternateroutes will beimplemented byproviding adequatesign boards.Constructionmaterial shall bestockpiled tominimize trafficblockages. In case ofexcavations forsewer lines in busystreets such ascentral areas of thetown (market area,old town area),adequatearrangements fortraffic diversionincluding priorintimation and byerecting proper signboard shall beprovided.Considering theHaveri CMCHeadContractorPMU, HaveriCMCPart ofconstructioncostsKUIDFC39WSAPL

NKUSIP (Package I - Dharwad)Tranche I Sub-Projects in Haveri CMCInitial Environmental ExaminationImpact DescriptionDust and noise fromconstruction of STPandlying/rehabilitationof sewer networkactivities.Significanceof the ImpactM/TSewernetwork willbe laid all overthe townincluding highdensity areas.As theproposed STPis locatedaway thehabitation,as far as layingof sewernetwork isconsidered,the dust andnoise nuisancemay beconsiderablein the coretown area andin all otherareas it maybe negligible.Mitigation Measuresmarket and denseresidential areas inthe core town area,preparation ofconstruction sitemanagement plan isnecessary.Poor performance ofthe contractor maypotentiallyexacerbate theseimpacts andtherefore qualifiedcontractors to beappointed. Thecontracted workincludes theimplementation ofconstruction sitemanagement plan,which will addressthese issues.Constructionmaterial shall bestockpiled. Adequatearrangements fortraffic diversionsincluding erection ofproper sign boards.Dust generationmust be arrested bywater spraying.Ensure usage ofstandard equipmentto reduce the noisenuisance. Equipmentshall comply withthe noise levels ofconstructionequipment laid outby the CPCB. Highnoise generatingactivities includingmaterial unloadingshall be avoidedduring nights. Thesurrounding peopleshall be informed,especially in denselypopulated area, ofnature and scheduleof the high noisegenerating activities,ImplementationResponsibilityHeadContractor/CMC HaveriPreliminaryCostingPart ofconstructioncostKUIDFC40WSAPL

NKUSIP (Package I - Dharwad)Tranche I Sub-Projects in <strong>Haveri</strong> CMCInitial Environmental ExaminationImpact DescriptionDust and noise fromconstruction of STPandlying/rehabilitationof sewer networkactivities.Significanceof the ImpactM/TSewernetwork willbe laid all overthe townincluding highdensity areas.As theproposed STPis locatedaway thehabitation,as far as layingof sewernetwork isconsidered,the dust andnoise nuisancemay beconsiderablein the coretown area andin all otherareas it maybe negligible.Mitigation Measuresmarket and denseresidential areas inthe core town area,preparation ofconstruction sitemanagement plan isnecessary.Poor performance ofthe contractor maypotentiallyexacerbate theseimpacts andtherefore qualifiedcontractors to beappointed. Thecontracted workincludes theimplementation ofconstruction sitemanagement plan,which will addressthese issues.Constructionmaterial shall bestockpiled. Adequatearrangements fortraffic diversionsincluding erection ofproper sign boards.Dust generationmust be arrested bywater spraying.Ensure usage ofstandard equipmentto reduce the noisenuisance. Equipmentshall comply withthe noise levels ofconstructionequipment laid outby the CPCB. Highnoise generatingactivities includingmaterial unloadingshall be avoidedduring nights. Thesurrounding peopleshall be informed,especially in denselypopulated area, ofnature and scheduleof the high noisegenerating activities,ImplementationResponsibilityHeadContractor/CMC <strong>Haveri</strong>PreliminaryCostingPart ofconstructioncostKUIDFC40WSAPL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!