16.07.2015 Views

Davangere 38254-053-ind-iee-02.pdf - kuidfc

Davangere 38254-053-ind-iee-02.pdf - kuidfc

Davangere 38254-053-ind-iee-02.pdf - kuidfc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

sewerage system; and (ii) reduced pollution and improved urban public and environmentalhealth in <strong>Davangere</strong> City. Implementation of the sewerage schemes would enhance health andhygiene conditions of the city.13. Consultation, Disclosure, and Grievance Redress. Public consultations were done inthe preparation of the project and IEE. Ongoing consultations will occur throughout the projectimplementation period with the assistance of the NGOs. A grievance redress mechanism isdescribed within the IEE to ensure any public grievances are addressed quickly.14. Monitoring and Reporting. The PMU, PIU, and DSC consultants will be responsible formonitoring. The DSC will submit monthly monitoring reports to PMU, and the PMU will sendsemi-annual monitoring reports to ADB. ADB will post the environmental monitoring reports onits website.15. Conclusions and Recommendations. Therefore, the proposed <strong>Davangere</strong> subprojectsin sewerage under Tranche 3 are unlikely to cause significant adverse impacts. The potentialadverse impacts that are associated with design, construction, and operation can be mitigatedto standard levels without difficulty through proper engineering design and the incorporation orapplication of recommended mitigation measures and procedures. Based on the f<strong>ind</strong>ings of theIEE, there are no significant environmental impacts, and the classification of the project ascategory B is confirmed, and no further special study or detailed environmental impactassessment (EIA) needs to be undertaken to comply with ADB SPS (2009).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!